Description:

Hand draw tonight....Turn next week a printed version sing AweSim software, a ... Limited waiting space for drive up one is 3 cars and drive up 2 4 cars. ... – PowerPoint PPT presentation

Number of Views:94
Avg rating:3.0/5.0
Slides: 9
Provided by: cwu
Category:
Tags: await | cars | draw | how | node | to

less

Transcript and Presenter's Notes

Title: Q vs Await Node


1
Q vs Await Node
  • Q is a simplified Await node
  • Q activity is the resource ie server, inspection
  • Await Node can specify resource that is needed by
    activity ie tools, parts, materials, etc

2
Quiz
  • Hand draw tonight.Turn next week a printed
    version sing AweSim software, a single server
    operation of a 7-11 store using AweSim objects,
    customers arrive at the counter that is
    Exponentially distributed with a mean of 4.5
    minutes, the duration of the service time is
    normally distributed with a mean of 3.2 minutes
    and a standard deviation of 0.6 minutes, end the
    simulation after 1000 customers.

3
  • AweSim software, a single server operation of a
    7-11 store using AweSim objects, customers arrive
    at the counter that is Exponentially distributed
    with a mean of 4.5 minutes, the duration of the
    service time is normally distributed with a mean
    of 3.2 minutes and a standard deviation of 0.6
    minutes, end the simulation after 1000 customers.

4
ExercisesDue Monday 10/29
  • 6-9 Machine tool processes 2 diff parts. T1
    arrival time is tri dis 20-30-50. Interarrival
    time of T2 tri dis 35-50-60. Processing time for
    T1 is exp, m20, T2 uniform min 15- max 20.
    Processing includes inspection, 1 fail, return
    to que the rework time 90 of original. Find
    time in system of part utilization of machine.
    Use create/ await/ a conditional split of
    activities/ free/ collect/ terminate.

5
  • Machine tool processes 2 diff parts. T1 arrival
    time is tri dis 20-30-50. Interarrival time of T2
    tri dis 35-50-60. Processing time for T1 is exp,
    m20, T2 uniform min 15- max 20. Processing
    includes inspection, 1 fail, return to que the
    rework time 90 of original. Find time in
    system of part utilization of machine. Use
    create/ await/ a conditional split of activities/
    free/ collect/ terminate.

6
Series/ parallel process example
  • Build picture frames. 4 activities cut mtl, glue
    frames, sand, finish. How long will it take to
    build each frame? Show in histogram for case1
    2.
  • Case one all series activity 1 is unifm dist 1
    to 2mins, act 2 is constant 24 hrs, act 3 unifm
    dist 5-10 mins, act 4 is uniform 2-3 hr
  • case two activity 1 is unifm dist 1 to 2mins,
    act 2A is unifrm 1-1.5 hrs, act 2B constant 23
    hrs (5 glue sta) , act 3 unifm dist 5-10 mins,
    act 4 is uniform 2-3 hr

7
Bank example
  • 2 inside tellers 2 drive up tellers, time bwtn
    arrivals of outside tellers is is expon dist
    m.75mins. Limited waiting space for drive up one
    is 3 cars and drive up 2 4 cars. Service time
    drive up one is norm dist 5 mins, dev 1 min,
    2nd drive up service time is uniform btwn 4 5
    mins. If car arrives at drive up and line is
    full, the customer will go inside. Other walk in
    customers arrive at a rate of expon .8 mins.
    They join a single Q and service time for both
    inside is triangular 2,3,5 dist., this line will
    only hold 7.

8
  • 2 inside tellers 2 drive up tellers, time bwtn
    arrivals of outside tellers is is expon dist
    m.75mins. Limited waiting space for drive up one
    is 3 cars and drive up 2 4 cars. Service time
    drive up one is norm dist 5 mins, dev 1 min,
    2nd drive up service time is uniform btwn 4 5
    mins. If car arrives at drive up and line is
    full, the customer will go inside. Other walk in
    customers arrive at a rate of expon .8 mins.
    They join a single Q and service time for both
    inside is triangular 2,3,5 dist., this line will
    only hold 7.