Title: ICAO AMCP WGM1
1ICAO AMCP WG-M/1
AMCP WGM1-WP27
Implementation of VDL Mode 4
2Luftfartsverket
3The roles of SCAA
The Provider Role The Safety Role (standard
setting and oversight) The Sector Role
4SCAAs Provider Role
to promote and develop State-owned civil
aviation airports and to be responsible for the
air navigation services in Sweden
- Infrastructure
- Ground Handling
- Commercial services
5SCAA 19 Airports
Stockholm-Arlanda Göteborg-Landvetter Malmö-Sturup
Bromma Luleå Umeå Sundsvall/Härnösand Östersund Ä
ngelholm/Helsingborg Visby Karlstad Kalmar Skellef
teå Jönköping Ronneby Norrköping Halmstad Kiruna Ö
rnsköldsvik
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
6SCAA Air Navigation Services
are responsible for traffic management services
for both civil and military air navigation
during peacetime in the form of
- air traffic control
- briefing
- telecommunications
- rescue services
- weather services (not military)
7SCAA Important Issues
- Airport capacity in the Stockholm region
- Arlanda Third runway, new and extensive
rebuilding of terminals - Renewal of air traffic management services
- Environmental measures
8Surveillance Infrastructure
- Radar replacement program finalised
- 12 new MSSR stations
- 1 PSR station
- Poor coverage in north
9ADS-B in Kiruna
- Kiruna is the most northern airport
- lt FL 70 Procedural ATC
- Airlines (2) require improved SUR service
- 10 schedule movements per day
- Some charter
- Limited GA and Military traffic
- Experimental activities
- Aircraft winter testing
- VDL Mode 4 and ADS-B from 2002
Q
10A-SMGCS
- New ground surface radar system at Arlanda
- ADS-B input to A-SMGCS
- Operational at Arlanda 2002
- Gothenburg, Sturup next
- SAS will require the same in Copenhagen and Oslo
- ATIS broadcast over VDL Mode 4 in parallel to
ACARS
Q
Q
Q
11ATM
- System 2000 New ATM system for whole Sweden
- Delivered by AIRSYS
- First part in operation December 2001 in
Stockholm - Co-operation with Australia on implementing ADS-B
- 4 Upgrades planned until 2004
- SMART ATC Simulator at Swedish ATS Academy
(SATSA) - Delegated Airborne Separation during Approach and
Departure simulated in May 2000 - Full implementation of ADS (ADS-C and ADS-B) is
ongoing
12Extension of NUP Infrastructure
- NUP will install a limited ground infrastructure
in Sweden - Expanded to 22 stations
- Service available 2004
- Ground network exists today
13NUP long term strategy
Research Phase NEAN,NEAP, FARAWAY PETAL etc..
Development Phase NUP Phase I, MA-AFAS,MEDUP, MFF
Operationl
Integration and validation phase NUP Phase II
Implementation and operational phase NUP Phase
III
14Common goal..
NUP Phase II shall deliver an extensive preoperat
ional ADS-B platform for Europe supporting
various ADS-B applications
15Tiger Team concept
- Process owners for a particular application
- Improve the concept with additional skills
- Synchronise with MEDUP/MFF and ADS Programme
- Add an ADS-B service for ATC Tiger Team
- Focus towards information, training and
operational introduction
16The applications
- Enhanced visual aquisition EVA Frankfurt/DLH
- Station keeping in TMA Stockholm/SAS
- See and avoid Nice/DGAC
- Delegated separation Maastricht/EuroC
- A-SMGCS DGAC/Paris
- ASAS/Passing Reykjavik/ICAA
- Helicopters SurveillanceNon Radar
Airspace North Sea/SLV - ATC Integration TBD-multiple
17NUP development processes
Concept and applications
ATM/AC integration
Technology
Standardisation
Business cases
Pre-operational implementation
18Greenland
Kiruna
NAANUP
NUP II
Russian initiatives
MA-AFAS
BETA
G2G
AFAS
MEDUP/MFF
Southern Ring
19Time plan
- Mid 2001 mid 2005
- 4 year programme
Establishment of both air and ground
infrastructures and applications In line with
Eurocontrol ADS Programme and International
development
20Fundamentals
- Integration of ADS-B in operational ATC centres
- Common data set for all applications
- Eurpean standaisation ETSI , EUROCAE
- European ADS-B backbone network
- Cooperative developmentAirlines, Airports,
Industry, Service provider and regulators - Aligned with Eurocontrol programmes
- Utilise Com (ATN and non ATN (IP)) Nav Sur
capabilites in the network
21Road map
Local fast track !
Applications and services final definition
ATC integration
Cockpit Integration
Certification approvals
2003
2005
2004
Establishment of ground infrastructure
ADS-B Out
ADS-B In
Large scale validation
22Delivering the benefits
ATC Only
Cockpit functionality
2003
2004
2005
Improved ATC surveillance
Air-to-Air applications
Local benefits
23Additional partners
Iceland
NAANUP
Norway
- WHY !!!
- Impact
- Core Europe coverage
- Skills
- Harmonisation
- Industry
Netherlands
Belgium
Austria
MEDUP/MFF