Title: ICAO AMCP WGM1


1
ICAO AMCP WG-M/1
AMCP WGM1-WP27
Implementation of VDL Mode 4
2
Luftfartsverket
3
The roles of SCAA
The Provider Role The Safety Role (standard
setting and oversight) The Sector Role
4
SCAAs Provider Role
to promote and develop State-owned civil
aviation airports and to be responsible for the
air navigation services in Sweden
  • Infrastructure
  • Ground Handling
  • Commercial services

5
SCAA 19 Airports
Stockholm-Arlanda Göteborg-Landvetter Malmö-Sturup
Bromma Luleå Umeå Sundsvall/Härnösand Östersund Ä
ngelholm/Helsingborg Visby Karlstad Kalmar Skellef
teå Jönköping Ronneby Norrköping Halmstad Kiruna Ö
rnsköldsvik
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
Q
6
SCAA Air Navigation Services
are responsible for traffic management services
for both civil and military air navigation
during peacetime in the form of
  • air traffic control
  • briefing
  • telecommunications
  • rescue services
  • weather services (not military)

7
SCAA Important Issues
  • Airport capacity in the Stockholm region
  • Arlanda Third runway, new and extensive
    rebuilding of terminals
  • Renewal of air traffic management services
  • Environmental measures

8
Surveillance Infrastructure
  • Radar replacement program finalised
  • 12 new MSSR stations
  • 1 PSR station
  • Poor coverage in north

9
ADS-B in Kiruna
  • Kiruna is the most northern airport
  • lt FL 70 Procedural ATC
  • Airlines (2) require improved SUR service
  • 10 schedule movements per day
  • Some charter
  • Limited GA and Military traffic
  • Experimental activities
  • Aircraft winter testing
  • VDL Mode 4 and ADS-B from 2002

Q
10
A-SMGCS
  • New ground surface radar system at Arlanda
  • ADS-B input to A-SMGCS
  • Operational at Arlanda 2002
  • Gothenburg, Sturup next
  • SAS will require the same in Copenhagen and Oslo
  • ATIS broadcast over VDL Mode 4 in parallel to
    ACARS

Q
Q
Q
11
ATM
  • System 2000 New ATM system for whole Sweden
  • Delivered by AIRSYS
  • First part in operation December 2001 in
    Stockholm
  • Co-operation with Australia on implementing ADS-B
  • 4 Upgrades planned until 2004
  • SMART ATC Simulator at Swedish ATS Academy
    (SATSA)
  • Delegated Airborne Separation during Approach and
    Departure simulated in May 2000
  • Full implementation of ADS (ADS-C and ADS-B) is
    ongoing

12
Extension of NUP Infrastructure
  • NUP will install a limited ground infrastructure
    in Sweden
  • Expanded to 22 stations
  • Service available 2004
  • Ground network exists today

13
NUP long term strategy
Research Phase NEAN,NEAP, FARAWAY PETAL etc..
Development Phase NUP Phase I, MA-AFAS,MEDUP, MFF
Operationl
Integration and validation phase NUP Phase II
Implementation and operational phase NUP Phase
III
14
Common goal..
NUP Phase II shall deliver an extensive preoperat
ional ADS-B platform for Europe supporting
various ADS-B applications
15
Tiger Team concept
  • Process owners for a particular application
  • Improve the concept with additional skills
  • Synchronise with MEDUP/MFF and ADS Programme
  • Add an ADS-B service for ATC Tiger Team
  • Focus towards information, training and
    operational introduction

16
The applications
  • Enhanced visual aquisition EVA Frankfurt/DLH
  • Station keeping in TMA Stockholm/SAS
  • See and avoid Nice/DGAC
  • Delegated separation Maastricht/EuroC
  • A-SMGCS DGAC/Paris
  • ASAS/Passing Reykjavik/ICAA
  • Helicopters SurveillanceNon Radar
    Airspace North Sea/SLV
  • ATC Integration TBD-multiple

17
NUP development processes
Concept and applications
ATM/AC integration
Technology
Standardisation
Business cases
Pre-operational implementation
18
Greenland
Kiruna
NAANUP
NUP II
Russian initiatives
MA-AFAS
BETA
G2G
AFAS
MEDUP/MFF
Southern Ring
19
Time plan
  • Mid 2001 mid 2005
  • 4 year programme

Establishment of both air and ground
infrastructures and applications In line with
Eurocontrol ADS Programme and International
development
20
Fundamentals
  • Integration of ADS-B in operational ATC centres
  • Common data set for all applications
  • Eurpean standaisation ETSI , EUROCAE
  • European ADS-B backbone network
  • Cooperative developmentAirlines, Airports,
    Industry, Service provider and regulators
  • Aligned with Eurocontrol programmes
  • Utilise Com (ATN and non ATN (IP)) Nav Sur
    capabilites in the network

21
Road map
Local fast track !
Applications and services final definition
ATC integration
Cockpit Integration
Certification approvals
2003
2005
2004
Establishment of ground infrastructure
ADS-B Out
ADS-B In
Large scale validation
22
Delivering the benefits
ATC Only
Cockpit functionality
2003
2004
2005
Improved ATC surveillance
Air-to-Air applications
Local benefits
23
Additional partners
Iceland
NAANUP
Norway
  • WHY !!!
  • Impact
  • Core Europe coverage
  • Skills
  • Harmonisation
  • Industry

Netherlands
Belgium
Austria
MEDUP/MFF