Transcript and Presenter's Notes

Title: Bosnia and Herzegovina


1
Bosnia and Herzegovina
  • And
  • The Regional Electricity Market

2
Contents
  • Bosnia and Herzegovina Liberalisation
  • Bosnia and Herzegovina Market Design
  • Southeast Europe Regional Market
  • Regional Market Sarajevo
  • Bosnia and Herzegovina Proposal

3
BiH LiberalisationCurrent Organizations
  • Three Vertically Integrated Power Utilities
    (Production, Transmission and Distribution)
  • ZEKC (Joint Power Coordination Centre)
  • Business Association of three Power Utilities
  • Role coordinate operation of the high voltage
    power network in BiH

4
(No Transcript)
5
BiH Liberalisation The Law
  • Act on Transmission of Electric Power, Regulator
    and System Operator of Bosnia and Herzegovina
    (Adopted in April, 2002, Official Gazette No.
    7/02). Authorises establishment of
  • Independent System Operator (ISO)
  • Single Transmission Company (STC)
  • State Electricity Regulatory Commission (SERC)

6
BiH Liberalisation Current Projects
  • Current Project in BiH POWER III World Bank
    Project (USD 250 MM)
  • Primary sub-projects
  • Reconstruction of substations.
  • Reconstruction of transmission lines.
  • SCADA/EMS and Telecomm. System BiH.
  • Environmental Projects.
  • Projects related to production and distribution.

7
BiH Liberalisation Market Restructuring Projects
  • Establishment of Single Transmission Company
    (CIDA, SEETEC)
  • ZEKC ISO Transformation Project (DFID, KEMA)
  • Market Rules and Market Design Project (CIDA,
    SEETEC)
  • State Electricity Regulatory Commission (USAID,
    Pierce Atwood)

8
BiH Liberalisation The Future
  • Resynchronisation of UCTE Zones I and II (related
    to implementation of POWER III Project).
  • Continuing process of reform and restructuring of
    the power sector.
  • Market opening.
  • Privatisation.

9
BiH Liberalisation Utility Unbundling and
Regulator
  • Three power utilities unbundling
  • Transmission divisions merge into STC
  • Several DISCOs
  • Several GENCOs
  • ZEKC ISO
  • SERC

10
BiH Liberalisation Time Frame
  • Reconstruction of substations and transmission
    lines by mid-2004.
  • Resynchronisation related to a.m. Power III
    sub-projects.
  • SCADA/EMS and telecommunication system by end of
    2006.
  • Unbundling of utilities by mid 2003.
  • ISO, STC, SERC by end of 2003.
  • Grid Code finalized by end of 2003 (already
    drafted).

11
Time Frame Contd
  • ISO Law, STC Law
  • Currently being drafted.
  • Expected to be passed by BiH Parliamentary
    Assembly by end of 2003.
  • Market Rules available by mid 2004.
  • Balancing market opens mid 2005.
  • Exchange opening undecided.

12
BiH Market Design
  • Future BiH market based on bilateral contracts.
  • Focus on physical wholesale transactions.
  • No separate market operator foreseen for initial
    phase.
  • ISO to initially operate Balancing Market.

13
Regional Market Definition
  • What is the Regional Market?
  • Implementation of EC Directives at the national
    level and participation in the Internal European
    Market, and
  • Possible implementation of a regional electricity
    market within the Internal European Market.

14
Regional Market Functions
  • What operational and market functions could the
    countries of the region combine?
  • Coordination of system operation.
  • Regional market for ancillary services, including
    balancing market.
  • Power Exchange.
  • Congestion management (e.g., auctions, market
    splitting).
  • Common transmission plan.
  • Common indicative generation plan for private
    investors.

15
Regional Market Challenges
  • SEE countries at different stages of
    liberalisation.
  • Detailed specifications of the regional market
    functions possible after
  • Pace of reform increases in countries.
  • Liberalisation processes are equalized.
  • Legislative and regulatory issues must be
    harmonized at the regional level.

16
Regional Market Organisation
  • Regional market functions could be operated from
    one or more locations.
  • E.g., Power Exchange in coordination with
    technical and commercial Coordination Centre.
  • International staff from participating
    countries.
  • Technical pre-conditions met.
  • SECI Teleinformation Project
  • Various national projects, etc.

17
Regional Market Sarajevo
  • Bosnia and Herzegovina should be the location of
    the future regional functions.
  • Reliability assured by
  • Rehabilitation of the existing transmission and
    interconnection links scheduled to be complete.
  • The reconnection of UCTE Zones I and II with a
    vital supraregional grid components inside BiH .

18
Regional Market SarajevoAdvantages
  • Installation of a state-of-the-art SCADA/ EMS
    system with telecommunication support assures
    adequate technological support.
  • Completely rehabilitated and upgraded
    transmission system will assure sufficient
    capacity for transit of energy between buyers and
    sellers within and outside of the region.

19
Regional Market SarajevoAdvantages
  • Principles of the Stability Pact and the MOU
    declaration of intention to establish a Southeast
    Europe competitive regional electricity market
    indicate that BiH is the right location for the
    regional market.

20
Regional Market BiH Proposal
  • Create separate regional coordinating entities
    for the following functions
  • Technical aspects of system operation (UCTE).
  • System security.
  • Real time operation.

21
Regional Market BiH Proposal
  • Commercial aspects of system operation (ETSO)
  • Coordination of scheduling
  • Regional market for ancillary services (including
    the balancing market).
  • Allocation of cross-border capacities.

22
Regional Market BiH Proposal
  • Regional Power Exchange.
  • Regional development studies.
  • Common transmission plan.
  • Indicative generation plans.

23
Thanks
  • For Your Attention!