Title: Bosnia and Herzegovina
1Bosnia and Herzegovina
- And
- The Regional Electricity Market
2Contents
- Bosnia and Herzegovina Liberalisation
- Bosnia and Herzegovina Market Design
- Southeast Europe Regional Market
- Regional Market Sarajevo
- Bosnia and Herzegovina Proposal
3 BiH LiberalisationCurrent Organizations
- Three Vertically Integrated Power Utilities
(Production, Transmission and Distribution)
- ZEKC (Joint Power Coordination Centre)
- Business Association of three Power Utilities
- Role coordinate operation of the high voltage
power network in BiH
4(No Transcript)
5BiH Liberalisation The Law
- Act on Transmission of Electric Power, Regulator
and System Operator of Bosnia and Herzegovina
(Adopted in April, 2002, Official Gazette No.
7/02). Authorises establishment of - Independent System Operator (ISO)
- Single Transmission Company (STC)
- State Electricity Regulatory Commission (SERC)
6BiH Liberalisation Current Projects
- Current Project in BiH POWER III World Bank
Project (USD 250 MM)
- Primary sub-projects
- Reconstruction of substations.
- Reconstruction of transmission lines.
- SCADA/EMS and Telecomm. System BiH.
- Environmental Projects.
- Projects related to production and distribution.
7BiH Liberalisation Market Restructuring Projects
- Establishment of Single Transmission Company
(CIDA, SEETEC)
- ZEKC ISO Transformation Project (DFID, KEMA)
- Market Rules and Market Design Project (CIDA,
SEETEC)
- State Electricity Regulatory Commission (USAID,
Pierce Atwood)
8BiH Liberalisation The Future
- Resynchronisation of UCTE Zones I and II (related
to implementation of POWER III Project).
- Continuing process of reform and restructuring of
the power sector.
- Market opening.
- Privatisation.
9BiH Liberalisation Utility Unbundling and
Regulator
- Three power utilities unbundling
- Transmission divisions merge into STC
- Several DISCOs
- Several GENCOs
- ZEKC ISO
- SERC
10BiH Liberalisation Time Frame
- Reconstruction of substations and transmission
lines by mid-2004.
- Resynchronisation related to a.m. Power III
sub-projects.
- SCADA/EMS and telecommunication system by end of
2006.
- Unbundling of utilities by mid 2003.
- ISO, STC, SERC by end of 2003.
- Grid Code finalized by end of 2003 (already
drafted).
11Time Frame Contd
- ISO Law, STC Law
- Currently being drafted.
- Expected to be passed by BiH Parliamentary
Assembly by end of 2003.
- Market Rules available by mid 2004.
- Balancing market opens mid 2005.
- Exchange opening undecided.
12BiH Market Design
- Future BiH market based on bilateral contracts.
- Focus on physical wholesale transactions.
- No separate market operator foreseen for initial
phase.
- ISO to initially operate Balancing Market.
13Regional Market Definition
- What is the Regional Market?
- Implementation of EC Directives at the national
level and participation in the Internal European
Market, and
- Possible implementation of a regional electricity
market within the Internal European Market.
14Regional Market Functions
- What operational and market functions could the
countries of the region combine?
- Coordination of system operation.
- Regional market for ancillary services, including
balancing market.
- Power Exchange.
- Congestion management (e.g., auctions, market
splitting).
- Common transmission plan.
- Common indicative generation plan for private
investors.
15Regional Market Challenges
- SEE countries at different stages of
liberalisation.
- Detailed specifications of the regional market
functions possible after
- Pace of reform increases in countries.
- Liberalisation processes are equalized.
- Legislative and regulatory issues must be
harmonized at the regional level.
16Regional Market Organisation
- Regional market functions could be operated from
one or more locations.
- E.g., Power Exchange in coordination with
technical and commercial Coordination Centre.
- International staff from participating
countries.
- Technical pre-conditions met.
- SECI Teleinformation Project
- Various national projects, etc.
17Regional Market Sarajevo
- Bosnia and Herzegovina should be the location of
the future regional functions.
- Reliability assured by
- Rehabilitation of the existing transmission and
interconnection links scheduled to be complete.
- The reconnection of UCTE Zones I and II with a
vital supraregional grid components inside BiH .
18Regional Market SarajevoAdvantages
- Installation of a state-of-the-art SCADA/ EMS
system with telecommunication support assures
adequate technological support.
- Completely rehabilitated and upgraded
transmission system will assure sufficient
capacity for transit of energy between buyers and
sellers within and outside of the region.
19Regional Market SarajevoAdvantages
- Principles of the Stability Pact and the MOU
declaration of intention to establish a Southeast
Europe competitive regional electricity market
indicate that BiH is the right location for the
regional market.
20Regional Market BiH Proposal
- Create separate regional coordinating entities
for the following functions
- Technical aspects of system operation (UCTE).
- System security.
- Real time operation.
21Regional Market BiH Proposal
- Commercial aspects of system operation (ETSO)
- Coordination of scheduling
- Regional market for ancillary services (including
the balancing market).
- Allocation of cross-border capacities.
22Regional Market BiH Proposal
- Regional Power Exchange.
- Regional development studies.
- Common transmission plan.
- Indicative generation plans.
23Thanks