Title: Structure Engineering 101 For Mechanical Engineers
1Structure Engineering101For Mechanical Engineers
2Class outline
- Structural systems
- IBC 2006 Seismic provisions
- Information your structural engineer needs
- Coordination
- Building Information Modeling
3Structural Systems
- Foundations
- Drilled piers and pier caps
- Driven piles
- Footings
- Mat footings
- Perimeter grade beams
- Basement walls
- Tie beams
- Post-Tensioned slabs on grade
4(No Transcript)
5(No Transcript)
6(No Transcript)
7(No Transcript)
8(No Transcript)
9(No Transcript)
10Drilled pier video
Yes I know the video is side ways.I am just a
structural engineer
11So what does a mechanical engineer need to know
about a drilled pier?
- Underground coordination
- Top of pier elevation is critical
- Trenches and excavations next to piers undermine
piers capacity - Pier caps and tie beam coordination
- Electrical grounding
- Piers are bigger then shown on structural
- Piers are not the ideal place to put the
geo-exchange system.
12Driven piles
13(No Transcript)
14(No Transcript)
15Electrical Grounding Driven Pile
16Screw Piles
17(No Transcript)
18Mat Foundations
19Foundation grade beam
20- How do foundation problems effect the mechanical
engineer? - Expansive soils
- Soil settlement
- Void forms
- Crawl spaces and molds
21Void form
22(No Transcript)
23Foundation heave/ settlements
24Structural Systems
- Steel Frame
- Beams and columns
- Gussets
- Acoustical
- Vibration
25Slab thickness see schedules and details Beam
depth see plan Camber not to worry Beam
reactions does not effect you Dimensions not
something a mechanical engineer uses..
26- Steel Beam Sizes
- Link to steel section properties look up table
http//www.efunda.com/math/areas/RolledSteelBeamsW
.cfm - Commonly used steel beam sizes
- Size Depth (d) Width (bf)
- W10x19 10 4
- W10x30 10 6
- W12x22 12 4
- W12x35 12 7
- W14x26 14 5
- W14x38 14 7
- W14x53 14 8
- W16x31 16 6
- W16x57 16.5 7
- W18x46 18 6
- W18x70 18.5 7 1/2
- W21x57 21 6 1/2
- W21x68 21 8 1/4
- W24x62 24 7
- W24x84 24 9
27(No Transcript)
28Cutting the metal deck
29Floor drains in the metal deck
30(No Transcript)
31(No Transcript)
32Hydronic Heating
33Joists and joist Girders
34(No Transcript)
35(No Transcript)
36(No Transcript)
37(No Transcript)
38(No Transcript)
39Structural Systems
- Cast-in-place concrete frame
- Wide beams center on columns Concrete slabs that
generally can be readily sleeved for piping - Mechanical shafts and chases
- Sleeves and floor sinks.. electrical conduits
40Structural Systems
- Cast-in-place concrete core walls
- Avoid locating telecom and electrical rooms
inside of closed in concrete core walls - Locate shafts at ends of cores
- Coordination of openings
- Mechanical ducts
- Stair pressurization
- Piping sleeves
- Electrical conduits
- Fire house cabinets
- Recessed drinking fountains
41Do you make site visits duringstructural
construction?Ask to go along with your
structural engineer sometime It is a lot of
funcheck this video out
42(No Transcript)
43(No Transcript)
44(No Transcript)
45(No Transcript)
46(No Transcript)
47Structural Systems
- Post-tensioned Cast-in-place concrete
- Most common on Residential and Hotels
- Flat thin slab
- Highly stressed cables embedded in slab
- Sleeves around columns are critical to design
- Drilled in hanger inserts limited to about 1 inch
in depth. - Pipe sleeves by columns
48(No Transcript)
49(No Transcript)
50(No Transcript)
51Structural Systems
- Precast concrete
- Tee stems spaced at 4-0 or 5-0 and
- 6-inches wide at the top.
- Field concrete topped and pre-topped tees (no
electrical conduit in pre-topped tees) - Mechanically hang from tee flanges if hangers are
drilled in inserts, do not drill stems.
Pre-stress tendons are located in stems.
52(No Transcript)
53- Light gage cold formed steel (Studs)
54(No Transcript)
55(No Transcript)
56(No Transcript)
57(No Transcript)
58Masonry
59(No Transcript)
60Structural Systems-Wood
61(No Transcript)
62Roof mechanical stacks
- SMACNA provisions.
- Guyed stacks
- Performance specifications
- Wind loads
- Anchoring locations and requirements
- Tensioning load criteria
63Roof mechanical stacks
- Large Tall Stacks.design and detail stacks and
connections to structure or retain a structural
engineer. - Stack design is generally not a part of your
structural engineers scope of service.
64(No Transcript)
65(No Transcript)
66IBC 2006
- SECTION 1613
- EARTHQUAKE LOADS
- 1613.1 Scope.
Every structure, and portion thereof, including
nonstructural components that are permanently
attached to structures and their supports and
attachments, shall be designed and constructed to
resist the effects of earthquake motions in
accordance with ASCE 7, excluding Chapter 14 and
Appendix 11A.
67(No Transcript)
68ASCE 7 2005
- Chapter 13
- SEISMIC DESIGN REQUIREMENTS FOR NONSTRUCTURAL
COMPONENTS - 13.1 GENERAL
- 13.1.1 Scope. This chapter establishes minimum
design criteria - for nonstructural components that are
permanently attached to - structures and for their supports and
attachments. - 13.1.2 Seismic Design Category. For the purposes
of this chapter, - nonstructural components shall be assigned to
the same seismic - design category as the structure that they
occupy or to which - they are attached.
69ASCE 7 2005
- 13.1.3 Component Importance Factor. All
components shall - be assigned a component importance factor as
indicated in this - section. The component importance factor, Ip,
shall be taken as - 1.5 if any of the following conditions apply
- 1. The component is required to function for
life-safety purposes - after an earthquake, including fire protection
sprinkler systems. - 2. The component contains hazardous materials.
- 3. The component is in or attached to an
Occupancy Category - IV structure and it is needed for continued
operation of the - Facility or its failure could impair the
continued operation of the facility. - All other components shall be assigned a
component importance - factor, Ip, equal to 1.0.
70(No Transcript)
71ASCE 7 2005
- 13.1.4 Exemptions. The following nonstructural
components are exempt from the requirements of
this section - Architectural components in Seismic Design
Category B other than parapets supported by
bearing walls or shear walls provided that the
component importance factor, Ip, is equal to 1.0. - Mechanical and electrical components in Seismic
Design Category B. - Mechanical and electrical components in Seismic
Design Category C provided that the component
importance factor, Ip, is equal to 1.0. - 4. Mechanical and electrical components in
Seismic Design Categories D, E, and F where the
component importance factor, Ip, is equal to 1.0
and either - a. Flexible connections between the components
and associated ductwork, piping, and conduit are
provided. - b. Components are mounted at 4 ft (1.22 m) or
less above a floor level and weigh 400 lb(1780
N) or less. - 5. Mechanical and electrical components in
Seismic Design Categories D, E, and F where the
component importance factor, Ip, is equal to 1.0
and - a. Flexible connections between the components
and associated - ductwork, piping, and conduit are provided.
- b. The components weigh 20 lb (89 N) or less
or, for distribution - systems, weighing 5 lb/ft (73 N/m) or less.
72(No Transcript)
73(No Transcript)
74Information needed
- Schematics
- Conceptual requirements of mechanical systems,
including preliminary location and equipment
weight - Non Standard criteria
- Vibration
- Acoustical separation
- Under floor mechanical systems
75Take care of your structural engineerspend time
coordinating during DD!
- Or this could happen on your next joblets watch
76Information needed
- Design Development
- Establish Story heightCeiling height,
structural depth and mechanical space
requirements - Equipment size and weight
- Identify heavy hanging loads due to piping
mechanical, boiler rooms, mechanical corridor
arenas and stadiums - Vibration / acoustical isolation of equipment
- Structural supports for Mechanical equipment
cooling towers, generators, chillers, boilers,
roof top ducts, stacks
77Information needed
- Design Development
- Major shaft openings in floors and roof
- Major wall penetrations shear walls and
structural exterior walls - Roof top mechanical penthouses, platforms,
mezzanines and catwalks
78Information needed
- Construction Documents ..getting down to the
Nitty Gritty dimensions and details - Confirmation of mechanical equipment weights from
DD - House keeping pad locations and thickness
- Openings in floors and roof ducts, roof drains,
water lines, conduit, bus ducts, grease traps,
floor sinks, etc - Openings in exterior foundation walls and grade
beams - Beam web penetrations/notches
- Ducts running through bar joists
- Buried tanks
- Plumbing inverts /elevations coordinated with
footings - Sump pits
- Trench drains
79Information needed
- Roof top mechanical equipment screen wall
coordinationBracing of screen walls to equipment
and equipment that has an architectural screen
attached. - Louver back up structure requirements
80Information needed
- Early Structural construction packages..
- .Project specific
- ..But in simple terms we need
everything that effects structural by the end of
DD.
81Construction Administration
- Dimensions not set during design.Contractor and
MEP supplier to coordinate equipment specific
opening dimension.Always an issueHow can you
help? - Lets structural engineer know if contractor
proposes to switch equipment before the Owner
accepts the changeweight, size and opening
requirements may change and require re-designbe
conservative during designno savings in
structure for equipment weights.
82Coordination
- .I do not believe it is possible for a
mechanical or electrical engineer to fully meet
the expectations of the contractor (and
structural engineer) when it comes to
coordination - but we would appreciate your effort.
- Ralph Rempel
83Coordination List
- Structural depth and MEP systems
- Construction tolerances, structure deflection,
fire proofing and the wrap on the Mechanical
ducts and pipes - Floor and roof openings
- Dimensioned opening size and dimensioned to grids
- Beam flange widths for telecom and electrical
risers and pipes and wall locations. - Concrete wall openings
- For concrete shear walls structural engineer
needs to show everything that penetrates the
wall. - Foundation walls not as critical structural
engineer generally has typical details - Roof slopes
- Locate drains near columns
- Floor drains
- Coordinate with beam locations
84Coordination List
- House keeping pads
- Fire protection beam penetrations
- Louver back up frame dimensions
- Perimeter drains
- Pipes through perimeter grade beams
- Floor drains
- Embedded pipes and electrical conduits
85Coordination List
- Slabsembedded electrical conduits
- Slabs on metal deck space 1 ½ OD conduits at
18 for slabs on metal deck unless Structural
designs and details the slab for the conduit. - Spacing can be reduced to 12 inches with minimal
design effort. - Spacing tighter than 12 inches will require
additional engineering and may cause the slab
thickness to increase.
86Coordination List
- Embedded electrical boxes in concrete columns
(power and fire alarm) .try to avoid - Avoid electrical conduits and boxes embedded in
cast in place concrete columns Why? - Coordination intensive..
- Difficult to build at construction joint
interfaces. - Electrical boxes need to be on structural column
details - Rebar fire-protection cover to be maintained.
87Coordination List
- Specifications
- Embedded electrical conduit
- In general prohibit embedded conduit unless as
shown on the drawings. - For embedded conduit specify under the submittals
section that the contractor shall prepare shop
drawing showing the location of the conduit. - You may want to also specify that if the conduits
are moved in the field that the record drawings
show the changes.
88Coordination List
- Specifications cont.
- Hung piping
- Hang heavy pipes with a trapeze from structural
members - Hanging smaller pipes from the slab generally ok
- Drilled in inserts
- Cast in hangers
- Supporting piping from the floor below
89Architects and BIM
SEAC 3/2010 survey
64 of architects use BIM
71 3 years or more
90Building Information Modeling
- Interoperable software
- Shared coordinates
- Coordination
- First do it the standard old fashion way
- Second fly through techniques (navisworks)
- Last Clash detection.