Title: Factory Building Symposium on Lean Production


1
Factory Building Symposium on Lean Production
  • January 29, 2007Austin, Texas

2
Building a Lean Culture
R-Anell Housing Group Denver, NC Clifford
Robbins, Lean Manufacturing Engineer
3
R-Anell Housing
4
R-Anells Kaizen (RPI) Process
  • Gather data
  • Train associates
  • Map value stream
  • Develop revised layout
  • Implement changes
  • Evaluate production and refine
  • Report to executive team and celebrate
  • Document process and create job instructions

5
R-Anells Kaizen (RPI) Process
  • Gather data
  • Train associates
  • Map value stream
  • Develop revised layout
  • Implement changes
  • Evaluate production and refine
  • Report to executive team and celebrate
  • Document process and create job instructions

6
Gather Data
  • Make spaghetti charts
  • Record procedures
  • Document current layout, distances and inventory

7
R-Anells Kaizen (RPI) Process
  • Gather data
  • Train associates
  • Map value stream
  • Develop revised layout
  • Implement changes
  • Evaluate production and refine
  • Report to executive team and celebrate
  • Document process and create job instructions

8
Train Associates Pipe Factory
  • Simulate a production line
  • Teach lean concepts in a learning-by-doing method
  • Successive rounds demonstrate the value of lean
    techniques

9
R-Anells Kaizen (RPI) Process
  • Gather data
  • Train associates
  • Map value stream
  • Develop revised layout
  • Implement changes
  • Evaluate production and refine
  • Report to executive team and celebrate
  • Document process and create job instructions

10
Map value stream
  • Area associates develop understanding of
    production as a system
  • Learn how lean techniques apply to their
    production environment

11
R-Anells Kaizen (RPI) process
  • Gather data
  • Train associates
  • Map value stream
  • Develop revised layout
  • Implement changes
  • Evaluate production and refine
  • Report to executive team and celebrate
  • Document process and create job instructions

12
Develop Revised Layout
  • Leverage area associates knowledge
  • Reinforce sense of ownership

13
R-Anells Kaizen (RPI) Process
  • Gather data
  • Train associates
  • Map value stream
  • Develop revised layout
  • Implement changes
  • Evaluate production and refine
  • Report to executive team and celebrate
  • Document process and create job instructions

14
Report and Celebrate
  • Describe effort
  • Celebrate and broadcast success
  • Document changes

15
Identifying the Target Dormer Area
  • Production not being met
  • Consistently required overtime
  • Additional team member requested
  • Other considerations
  • First major event
  • Good supervisor
  • Off-line operation

16
Goal Productivity and Space
  • Excessive walking
  • Poor material flow
  • Batching materials
  • Excessive inventory
  • Poor equipment positioning
  • No table saw

17
RPI Team
  • Charles Jervais, director of process development
  • Clifford Robbins, lean engineer
  • Carlos Soto, safety manager
  • Gary Lynn, supervisor
  • Jorge Jordan, team leader
  • Luis Aleman
  • Pedro Aleman
  • Stanley Axe
  • Michael Childers
  • Miguel Davia
  • Joseph Flowers
  • Ricky Gibbs
  • Steve McEntire
  • Silverio Martinez

18
Then
Now
  • Layout before RPI
  • Layout after RPI

Logical flow puts products where they need to be
Extended crisscrossing flow and bloated work areas
19
Results
  • Provided 2,400 sf for building large gable
    dormers
  • Reduced material inventory
  • Value of manufacturing space freed up 108,000
  • Annual labor savings 27,300

20
Highlights
  • Associates speak directly to management
  • Deep respect for associates efforts
  • Substantial management commitment
  • Substantial investment in associate time

21
Going forward
  • Accelerated lean training schedule
  • Concentrate on problem areas identified by the
    Value Stream Map
  • Provide lean support for move
  • Include lean training for new associates during
    orientation

22
Lean Symposium
23
Factory Building Symposium on Lean Production
  • Manufactured Housing Research Alliance
  • Jordan Dentz
  • (212) 496-0900 x13
  • jdentz_at_research-alliance.org
  • www.mhrahome.org