Description:

Presenting Micro-Computer Aided Cost Estimating System (MCACES) 2nd Generation (MII) MCACES 2nd GENERATION WHAT IS MII? One of the Tri-Services Automated Cost ... – PowerPoint PPT presentation

Number of Views:95
Avg rating:3.0/5.0
Slides: 17
Provided by: miisoftwa
Category:

less

Transcript and Presenter's Notes

Title: Presenting


1
Presenting
Micro-Computer Aided Cost Estimating
System (MCACES) 2nd Generation (MII)
2
WHAT IS MII?
One of the Tri-Services Automated Cost
Engineering System (TRACES) suite of software
tools.
MII is the detailed cost estimating application
used by the U. S. Army Corps of Engineers (USACE)
and its A-E contractors for military, civil works
and hazardous, toxic and radioactive waste (HTRW)
projects.
3
WHAT IS MII?
Developed by Project Time Cost, Inc. under
contract with USACE, MII is the state-of-the-art
replacement for MCACES and MCACES for Windows.
First released in June 2003. Current version is
4.1 build 5. Version 4.2 will be available soon!
4
MII Features
Estimates Are Organized in a Flexible User
Defined Logical Tree Structure
Number of WBS Levels is Unlimited
User/Client Defined WBS Customizable to Fit Needs
5
MII Features (continued)
Multiple Views of the Estimate are Available,
Including
  • Project Items
  • Contractors
  • CSI Tasks
  • Assemblies
  • Crews
  • Labor
  • Equipment

6
MII Features (continued)
Highlighted Tree Element Details Item List, Item
Detail or Folder Detail
7
MII Features (continued)
Highlighted Tree Element Details Item List, Item
Detail or Folder Detail
8
MII Features (continued)
Highlighted Tree Element Details Item List, Item
Detail or Folder Detail
9
MII Features (continued)
Any MII Library (Database) Can Be Opened As a
Source Library and Items Easily Moved Into
Project Library via Drag-Drop, Copy-Paste or
Transfer
10
MII Features (continued)
Unlimited Ability to Define Contractor,
Subcontractor, Sub-Sub etc. Structure
11
MII Features (continued)
Ability to Develop Detailed Field/Job Office
Overhead Estimates
12
MII Features (continued)
Ability to Define Payroll Tax and Insurance Rates
by Contractor
13
MII Features (continued)
Virtually Unlimited Ability to Define and Assign
Contractor Markups
14
Summary
MII is a state-of-the-art cost engineering tool
designed and developed by cost engineers for cost
engineers.
This overview was only a sampling of the
sophisticated features of MII.
15
Summary
  • Other key features include
  • Import from MCACES MFW
  • Quantity linking to and between folders and items
    to create logical relationships
  • Quantity linking to Excel? workbooks
  • Create and use assemblies on the fly
  • Modeling capability using links to Excel?
  • A powerful filtering tool expedites reviews and
    enhances quality control
  • And much, much more

16
For More Information
Contact Project Time Cost, Inc. Jim
Osborne 770-444-9799 jim.osborne_at_ptcinc.com
Write a Comment