Title: EQHSMS(IMS) Awareness Training Presentation
1C112 IMS(EQHSMS) AWARENESS www.global manager
group.com Price 360 USD
2Integrated management systemEQHSMS integration
- Business planning
- Quality management system
- Health and safety management system
- Energy management system
- Risk management system
- Maintenance management system
- Personnel and administration systems
- Performance management systems
3Inputs for objectives
- Quality and HSE policy
- Continual improvement commitment
- Prevention of pollution commitment and Health and
safety issues - Initial review results (aspects / risks)
- Legal and other requirements
- Technology options
- Financial, operational and business requirements
- Views of interested parties
- Results of management review
4Steps for aspect identification
- Institute a core team
- Define procedure scope
- Evaluate activities, products, processes,
services,work situations, product life cycle,
past experience, existing practices procedures - Identify items and all loss exposures
- Determine impact (N / A / E) liabilities
- List activity/item
- Quantify activity/item
- Determine priority
54.3.1 Hazard / risk identification
- Institute a core team
- Define procedure scope
- Evaluate activities, products, processes,
services, work situations and product life
cycle, past experience - Identify items and all loss exposures
- Determine hazards and risk
- List concerns
- Quantify concern
- Determine priority
6Common control methods
Air contaminant 1. Elimination 2.
Isolation 3. Substitution 4.Ventilation 5. House
keeping 6. PPE 7. Air monitor
Skin disorders 1. Elimination 2.
Isolation 3. Substitution 4. Engineering
control 5. PPE 6. Personnel placement
Noise 1. Reduction at source 2. Noise
barrier 3, Dampening 4. PPE 5. Engineering
control 6. Personal replacement
7Structure of standards as per ISO 14001-2004
4.6Management review
- 4.5Checking corrective action
- Monitor Measure
- Non-conformance
- Corrective/preventive actions
- Records
- Audits
Continual trade linkages
4.2Environmental Policy
- 4.3Planning
- Environmental
- Aspects
- Legal Other
- Objectives Targets
- EMP
- 4.4 Implementation and operation
- Structure / Responsibility
- Training, Awareness
- Communication
- EMS Documentation
- Document Control
- Operation Control
- Emergency Procedures
8Structure of standards
- OHSAS 18001 Standard
- 4.2 OHSAS Policy
- 4.3 Planning
- 4.4 Implementation
- operation
- 4.5 Checking corrective
- action
- 4.6 Management review
- ISO 14001 Standard
- 4.2 Environment policy
- 4.3 Planning
- 4.4 Implementation
- operation
- 4.5 Checking
- corrective action
- 4.6 Management review
9IMS(EQHSMS) Documents
10 Steps for installation of integrated management
system (EQHSMS)
- Conduct ISO9001,ISO-14001 AND ohsas18001
awareness program (top middle bottom level). - Form a steering committee and task force for
documentation - Identification of all possible environmental
aspects hazard-risk to the company. - Brainstorming on impacts of all possible aspects
and significant risk. Identification of most
significant aspects and significant risk - Define quality and HSE policy, objectives and
targets. - Prepare documents of integrated management
system, records, legal requirements. - Train all for quality and HSE policy and for
achieving objectives targets. - Communication to all including suppliers and
interested parties. - Implementation train all personnel in the use
of procedures formats. Preparation and
implementation of IMS programme. - Train internal auditors for IMS system.
- Assess the system through first internal audit.
- Take corrective actions for non-conformities.
- Apply for certification.
- Assess the system through second round of
internal audit. - Avail onsite document adequacy of certifying
body for Integrated management system. - Take actions on suggestions given by them.
- Final audit by certifying body for your
integrated management system.