Title: Traininig Presentation on IMS EQHSMS
1C 112
SAMPLE SLIDE
IMS (EQHSMS) Awareness Training
PART 2
2Interested Parties Stake Holders
HSE
3EQHSMS Internal Context
4Structure of Standards as per ISO 140012015
5Environmental Aspect
COMMON ASPECTS ? Energy Use ? Solid Waste ?
Water Use ? Air Pollution ? Emission To Air ?
Release To Water ? Waste Management
OTHER ASPECTS ? Contamination of Land ? Heavy
Metal Waste Drain ? Industrial Waste Drain ?
Product End-of-Life ? Radioactive Waste ? Medical
Waste ? Solvent Waste ? Use of Raw Materials ?
Use of Natural Resources ? Impact on
Comminities ? Noise
6Occupational Health Hazards
- Physical - Noise, Vibration,
- Temperature,Radiation,
- Illumination,
Ventilation, - Decompression,
Humidity - Chemical - Metal, Gases, Compounds
- Biological - Virus, Bacteria, Fungi, Parasite
- Ergonomic - Posture, Repetitive motion,
- Monotony
- Stress
7Emergency plan
- Reporting procedure
- Evacuation procedure drills
- Facility layout and alternate routes, walk bays
- Color codes - system, pipelines
- Protection of vital equipment, material
- Control center and mobile command center
- Investigating expert team and CPA planning
- Government / Corporate / internal notification
- Cleanup disposal procedure
8Risk and Opportunity
- The objective of this presentation are to
appreciate and understand how an QMS is
established in terms of
Four Phases of Risk
9 IMS(EQHSMS) Documents
10Steps for installation of Integrated management
system (EQHSMS)
- Conduct ISO 9001, ISO 14001 and OHSAS 18001
awareness program (top middle bottom level). - Form a steering committee and task force for
documentation - Identification of All Possible Environmental
Aspects Hazard-risk to the company. - Brainstorming On Impacts of All Possible Aspects
and significant risk. Identification of Most
Significant Aspects and significant risk - Define Quality and HSE Policy, Objectives and
Targets. - Prepare documents of Integrated management
system, Records, Legal Requirements. - Train all for Quality and HSE Policy and for
achieving Objectives Targets. - Communication to all including Suppliers and
Interested parties. - Implementation train all personnel in the use
of procedures formats. Preparation and
Implementation of IMS programme. - Train internal auditors for IMS system.
- Assess the system through first internal audit.
- Take corrective actions for non-conformities.
- Apply for certification.
- Assess the system through second round of
internal audit. - Avail onsite document adequacy of certifying
body for Integrated management system. - Take actions on suggestions given by them.
- Final audit by certifying body for your
integrated management system ( ISO 9001-2015, ISO
14001-2015 and OHSAS 18001).