Title: Balboa Pacific Presentation
1 Waste Management Power Generation Technology
2Solutions to Waste Management must be addressed
technologically. Using Mother Earth as a waste
depository land or sea, is unacceptable. And
incineration pollutes the air we breathe. It is
incumbent upon mankind to serve as stewards of
the planet we inhabit.
3Balboa Pacific Corporation
Bal-Pac Thermal Converter
OUR TECHNOLOGY
Pyrolytic Gasification
4Advantages of Bal-Pac Pyrolytic Gasification
for processing waste streams
- Environmentally clean process.
- Controlled environment inside pyrolytic units.
- Energy efficient process.
- Controlled temperature in every stage
- of the process.
- Portability - can be moved easily.
- Can generate up to 3 Megawatt hours of power
per 50 ton system per day.
5Advantages of Bal-Pac Pyrolytic Gasification
for processing waste streams
- It is a continuous-feed process
- Volume reduction of the material, up to 95
- depending on waste composition
-
- No toxic residue, non-leachable (ash)
- No toxic emissions into the air
- Creates heat energy as a by-product
- Temperature range of Thermal Oxidizer
- as high 2600F
6Typical System
Thermal Oxidizer operates between 1600 2600F
Thermal Converter operates between 1200 1800F
Waste-heat Boiler pressure 250 psi
Multi-stage steam turbine generator
7How It Works
- Temperatures between
- 1200 1800F.
- Continuous process
- Indirect heat
- Oxygen free
8-
- Different Waste Streams Processed By
- Bal-Pac Pyrolytic Gasification
- Municipal Solid Wastes
- Household, Commercial Centers, Buildings,
Markets, Restaurants and Fast Food Eateries,
Schools, Yard Waste, etc. - Industrial Wastes
- Oil Refineries
- Chemical Plants
- Metallurgical / Mining Industries
- Hospital Waste (Red Bag Waste)
- Electronic Industries (Chips, ICs, MPs)
- Steel Mills
- Plastic, Paper, Paints
- Rubber goods including tires
- Drum Waste
- Electrical Products (PVC, PE Insulation)
- Etc
Contaminants successfully destroyed
9Emission Levels
10Emission Levels
11 A Comparative Analysis Bal-Pac
Pyrolytic Gasification versus Incineration
12the process
- Energy rich - for every BTU input,
- expect as much as 10 BTU output.
- Superb waste-to-energy potential.
- Bal-Pac Systems meet all environmental
- regulations and guidelines.
BTU - British Thermal Unit
13the process
- Destructive distillation of ALL organic
- materials through a process that involves
- the application of intense indirect thermal
- energy in the absence of oxygen which
- reduces the material to combustible gases
- and non-hazardous char.
- Able to achieve up to 95 reduction in
- volume of many materials.
14For Mixed-Use Application
- Bal-Pac Thermal Converters can process
- Municipal waste
- Industrial waste
- Hospital waste
- Household waste
- Bal-Pac Thermal Converters can
- Generate / Create power for re-distribution
- within the same work area or re-sold to a
- local electric company
15For Industrial Application
- Waste Management facility ideal for the final
- destruction of Toxic and Hazardous Waste (THW).
- Ideal for use as Waste Management facilities
- and power generating plants unit within
- industrial parks.
16For Industrial Application
An income generator because it processes not
only internally generated waste, Bal-Pac offers
one the option of treating waste from nearby
industrial parks for a fee. A cost-cutting
measure because it can generate up to 3 Megawatt
hours of electricity per 50 ton system per day
for use within the same industrial estate.
17- Materials recovery facility EPC, OM
- MSW processing recycling, transfer
- collection systems TO
- MSW feedstock for RDF and COMPOST
- Recyclable marketing services for paper,
- plastics, glass, metals, textiles, wood,
- aggregate, etc.
- Waste-to-energy ash metals recovery
RRT Designs Construction Melville, New
York. Alstom Power Air Preheater
Divison Wellsville, New York
- Leading supplier of engineered products,
services and technologies for heat recovery
systems, size reduction and classification
equipment thermal processing and destruction
equipment including custom manufacturing - Maintains a fully-equipped application
laboratory and test center in Naperville
Illinois, that offers pilot plant capabilities to
simulate actual plant operations their products - APC manufacturing facilities in Concordia,
Kansas and Wellsville, New York are both
certified to AWS.D1.1 and ASME Section 1 and
Section VIII certifications. The Concordia shop
is also certified to ASME Section IV Heating
Boilers (H Stamp).
Strategic Alliances in Technology
18Balboa Pacific Corporation For Further
Information Contact Douglas F. Golding Chief
Operating Officer P.O. Box 10454 Costa Mesa, CA
92627 (949) 722-6563 Doug_at_Balboa-Pacific.com www.B
alboa-Pacific.com