Contractor
AZZOLLINI CONSTRUCCIONES SRL ARGENTINA
3
Contract DACA01-02-C-0018Contract Name
MINI THEATERSEMINAR FACILITYLocation
CAECOPAZ - BUENOS AIRES ARGENTINA
4
  • PROJECT DETAILS
  • Original Contract Amount US 289.915,00
  • Final Contract Amount US 302.479,00
  • Contract Signature Date July 16, 2002
  • Notice to Proceed Date September 10, 2002
  • Original Completion Date September 10, 2003
  • Actual Completion Date April 1, 2003
  • Total Man Hour Used 13.652
  • Safety Record ZERO ACCIDENTS

5
MINI THEATER - SEMINAR FACILITY
CAECOPAZ - BUENOS AIRES - ARGENTINA
6
MINI THEATER - SEMINAR FACILITY
CAECOPAZ - BUENOS AIRES - ARGENTINA
7
MINI THEATER - SEMINAR FACILITY
CAECOPAZ - BUENOS AIRES - ARGENTINA
8
Safety scope
  • Based on a safety program, many activities were
    done to find the existent risks in work and in
    each stage of its development, so that we could
    draw up and develop strategies to prevent them
    and do safety jobs.
  • Our safety policy is based on safety labor laws
    existents in our country and client specific
    requirements and its performed by the company
    Project Management Team .

9
ZERO ACCIDENTS
  • Project Management Team commitment ZERO
    ACCIDENTS.
  • This goal has been the focus of all site
    personnel.
  • One of the tools used to ensure that there are no
    surprises with regards to coordinating, managing,
    and performing the work safely is the Job Safety
    Analysis, which is conducted by the corporate and
    site safety officer, as a team, and issued to the
    supervisor responsible for the work, the
    Superintendent, and the Resident Office for each
    new phase of work.
  • The work force that will be performing the work
    is required to attend a Preparatory Meeting prior
    to starting any work to make sure they are
    knowledgeable of the safety requirements listed
    in the analysis.

10
Preparatory meeting
11
Government controls
  • Actual laws include particular objectives to join
    obligations with work methodology to do. So that
    the regulations used by the Construction Industry
    are
  • Decree Nº 911/96 of the Construction Industry
  • This decree set the rights and obligations of
    employers and construction workers in safety and
    occupational health..
  • It is set, too, different safety regulations to
    protect the safety of workers, not only about the
    conditions of the working place, but the
    conditions of equipment and resources to use by
    workers.
  • Resolutions Nº 231/96, 51/97,35/98

12
  • The following are the
  • Safety Management Team work

13
Training Program
The Training Program includes the prevention of
illness and works accidents according to the
general and specific risks of each job that
workers perform. Making and implementation of
the Training Program about Safety and Ocupational
health.
Basic and first chat about Safety and Hygiene at
work, for the whole staff.
14
Personal Protection Resources (PPR)
Handing over PPR according to the risks of the
job the workers are doing at the moment.
Basic PPR Work clothes, gloves, safety glasses,
safety helmet, shoes with steel toe.
15
Group protection (Signposting)
  • Place or safety signs with messages of prevention
    according to the risks to preserve.
  • Group protection (Fence)
  • Perimeter protection level III
  • Safety warnings , using danger tape an solid
    covers (fenólico)

16
Group protection (Fence)
Perimeter protection level III Safety warnings ,
using danger tape an solid covers
17
Height work
  • Regulations to prevent workers from falling down.
  • Use of safety nets an whole body harness as it is
    shown in photographs

18
Accommodation and Health Installations
  • Accommodation and Health installations were
    checked by the Risk Insurance Company (ART),
    according to the decree Nº 911/96 Art. 22 to 41
    for the Construction Industry of Argentine.

19
Temporary electrical installations Fire
protection
Electric panels Use of differential breaker,
thermo magnetic breaker protection, grounding
system, according to the risks. Grounding
measuring was done using an electronic grounding
meter.
Prevention and protection against
fires Installation of chemical powder
extinguishers type (ABC)
20
Emergency process system
  • Emergency accidents procedures with hospital
    telephone number, and ambulance service were put
    in visible places.
  • Emergency equipment
  • First aid kit and immobilization board for
    injured people

21
Pre-entrance examination
  • The purpose of this examination is to evaluate
    workers flairs to do specific jobs.

22
First aids training and CPR
  • The training was performed by Ernesto Quiroga
    Vergara MD, Azzollini Constructions medical team.
  • It was used a dummy for the CPR training.

23
Raising plan
Safety check list Machine checks, safeties,
qualify operators to inspect the
machine. Identification of works risks at the
place of working (Steady floor, free of obstacles)
24
Loading and unloading with cranes
  • Evaluation of work place, loading range, safety
    work angles, panel of loading capacity.
  • Signposting of crane work place.

25
ART inspections(Risk Insurance Company)
  • Unscheduled visits at the work place by the ART
  • It is checked
  • Name of the company
  • Jobs doing at work place
  • Performance at the Safety Program and proof of
    jobs beginning reports at the ART.
  • Personnel/staff training
  • Work place cleanup

26
Incentive policy
The incentive policy is important to prevent or
reduce accidents by using tools based on human
behavior to avoid any accident The Company has
got three tools to evaluate the staff
Examination to prevent accidents Evaluation of
induction Punishment regime. The examinations to
prevent accidents identify risks and dangerous
behaviors before the accident happens. The
examinations are done frequently covering all the
activities at workplace. In the list it can see
the use of personnel protection resources, use of
body positions (ergonomic risks) the cleaning of
work place, tools conditions, fire extinguishers,
etc.
27
Safety incentive
  • Prize and Certificate giving ceremony to workers
    which were distinguished in Safety and
    Ocupational Health in cooperation with USACE and
    Azzollini Construction directors.
  • The prize was home appliances
  • Staff and winners of Safety Prize for this
    project
  • Mr. Juan Carlos Pereira
  • Mr. Mario Acevedo
  • Mr. Oscar Herrera.

28
The goal
  • The succesfull of the project in health and
    safety was the result of a team work, with high
    motivated people, doing prevention.
  • Azzollini Contrucciones thanks to USACE people
    and the Celebrate Safety Program for the
    oportunity to show our skills.
  • Enrique Azzollini
  • General Manager

29
AZZOLLINI CONSTRUCCIONES SRL ARGENTINA