2Contractor
AZZOLLINI CONSTRUCCIONES SRL ARGENTINA
3Contract DACA01-02-C-0018Contract Name
MINI THEATERSEMINAR FACILITYLocation
CAECOPAZ - BUENOS AIRES ARGENTINA
4- PROJECT DETAILS
- Original Contract Amount US 289.915,00
- Final Contract Amount US 302.479,00
- Contract Signature Date July 16, 2002
- Notice to Proceed Date September 10, 2002
- Original Completion Date September 10, 2003
- Actual Completion Date April 1, 2003
- Total Man Hour Used 13.652
- Safety Record ZERO ACCIDENTS
5MINI THEATER - SEMINAR FACILITY
CAECOPAZ - BUENOS AIRES - ARGENTINA
6MINI THEATER - SEMINAR FACILITY
CAECOPAZ - BUENOS AIRES - ARGENTINA
7MINI THEATER - SEMINAR FACILITY
CAECOPAZ - BUENOS AIRES - ARGENTINA
8Safety scope
- Based on a safety program, many activities were
done to find the existent risks in work and in
each stage of its development, so that we could
draw up and develop strategies to prevent them
and do safety jobs. - Our safety policy is based on safety labor laws
existents in our country and client specific
requirements and its performed by the company
Project Management Team .
9ZERO ACCIDENTS
- Project Management Team commitment ZERO
ACCIDENTS. - This goal has been the focus of all site
personnel. - One of the tools used to ensure that there are no
surprises with regards to coordinating, managing,
and performing the work safely is the Job Safety
Analysis, which is conducted by the corporate and
site safety officer, as a team, and issued to the
supervisor responsible for the work, the
Superintendent, and the Resident Office for each
new phase of work. - The work force that will be performing the work
is required to attend a Preparatory Meeting prior
to starting any work to make sure they are
knowledgeable of the safety requirements listed
in the analysis.
10Preparatory meeting
11Government controls
- Actual laws include particular objectives to join
obligations with work methodology to do. So that
the regulations used by the Construction Industry
are - Decree Nº 911/96 of the Construction Industry
- This decree set the rights and obligations of
employers and construction workers in safety and
occupational health.. - It is set, too, different safety regulations to
protect the safety of workers, not only about the
conditions of the working place, but the
conditions of equipment and resources to use by
workers. - Resolutions Nº 231/96, 51/97,35/98
12- The following are the
- Safety Management Team work
13Training Program
The Training Program includes the prevention of
illness and works accidents according to the
general and specific risks of each job that
workers perform. Making and implementation of
the Training Program about Safety and Ocupational
health.
Basic and first chat about Safety and Hygiene at
work, for the whole staff.
14Personal Protection Resources (PPR)
Handing over PPR according to the risks of the
job the workers are doing at the moment.
Basic PPR Work clothes, gloves, safety glasses,
safety helmet, shoes with steel toe.
15Group protection (Signposting)
- Place or safety signs with messages of prevention
according to the risks to preserve. - Group protection (Fence)
- Perimeter protection level III
- Safety warnings , using danger tape an solid
covers (fenólico)
16Group protection (Fence)
Perimeter protection level III Safety warnings ,
using danger tape an solid covers
17Height work
- Regulations to prevent workers from falling down.
- Use of safety nets an whole body harness as it is
shown in photographs
18Accommodation and Health Installations
- Accommodation and Health installations were
checked by the Risk Insurance Company (ART),
according to the decree Nº 911/96 Art. 22 to 41
for the Construction Industry of Argentine.
19Temporary electrical installations Fire
protection
Electric panels Use of differential breaker,
thermo magnetic breaker protection, grounding
system, according to the risks. Grounding
measuring was done using an electronic grounding
meter.
Prevention and protection against
fires Installation of chemical powder
extinguishers type (ABC)
20Emergency process system
- Emergency accidents procedures with hospital
telephone number, and ambulance service were put
in visible places. - Emergency equipment
- First aid kit and immobilization board for
injured people
21Pre-entrance examination
- The purpose of this examination is to evaluate
workers flairs to do specific jobs.
22First aids training and CPR
- The training was performed by Ernesto Quiroga
Vergara MD, Azzollini Constructions medical team. - It was used a dummy for the CPR training.
23Raising plan
Safety check list Machine checks, safeties,
qualify operators to inspect the
machine. Identification of works risks at the
place of working (Steady floor, free of obstacles)
24Loading and unloading with cranes
- Evaluation of work place, loading range, safety
work angles, panel of loading capacity. - Signposting of crane work place.
25ART inspections(Risk Insurance Company)
- Unscheduled visits at the work place by the ART
- It is checked
- Name of the company
- Jobs doing at work place
- Performance at the Safety Program and proof of
jobs beginning reports at the ART. - Personnel/staff training
- Work place cleanup
26Incentive policy
The incentive policy is important to prevent or
reduce accidents by using tools based on human
behavior to avoid any accident The Company has
got three tools to evaluate the staff
Examination to prevent accidents Evaluation of
induction Punishment regime. The examinations to
prevent accidents identify risks and dangerous
behaviors before the accident happens. The
examinations are done frequently covering all the
activities at workplace. In the list it can see
the use of personnel protection resources, use of
body positions (ergonomic risks) the cleaning of
work place, tools conditions, fire extinguishers,
etc.
27Safety incentive
- Prize and Certificate giving ceremony to workers
which were distinguished in Safety and
Ocupational Health in cooperation with USACE and
Azzollini Construction directors. - The prize was home appliances
- Staff and winners of Safety Prize for this
project - Mr. Juan Carlos Pereira
- Mr. Mario Acevedo
- Mr. Oscar Herrera.
28The goal
- The succesfull of the project in health and
safety was the result of a team work, with high
motivated people, doing prevention. - Azzollini Contrucciones thanks to USACE people
and the Celebrate Safety Program for the
oportunity to show our skills. - Enrique Azzollini
- General Manager