Maintenance Contracting in Ontario, Canada - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Maintenance Contracting in Ontario, Canada

Description:

Area Maintenance Contracts (AMC's): 'All' Summer and Winter Services within Area ... AMC's. New Roles, New Opportunities: Contract Management vs. Supervision ... – PowerPoint PPT presentation

Number of Views:193
Avg rating:3.0/5.0
Slides: 10
Provided by: cind102
Category:

less

Transcript and Presenter's Notes

Title: Maintenance Contracting in Ontario, Canada


1
Maintenance Contracting in Ontario, Canada
  • S. E. Gwartz, P. Eng
  • Ministry of Transportation

July, 2003
2
Maintenance ContractsTypes
  • Contract Type 1
  • Managed Out-Sourcing Contracts (MOs)
  • All Summer and Winter Services
  • Individual Functional Contracts
  • Majority are Unit Price Tenders
  • Managed by MTO Staff
  • MTO does Road Patrolling
  • All Other Work by Contractors
  • Up to 5 Years
  • Penalties for failure to perform
  • Covers 40 of the Provincial Highway Network

3
Maintenance ContractsTypes
  • Contract Type 2
  • Area Maintenance Contracts (AMCs)
  • All Summer and Winter Services within Area
  • Annual Lump Sum (RFP process)
  • Managed by Contractor
  • Initially 32 Years, Now 7-9 Years
  • Performance Specifications
  • 600-1800 lane miles/contract
  • Risk Sharing (salt)
  • Penalties for failure to perform
  • Covers 60 of the Provincial Highway Network

4
Activities Included in Area Maintenance
Contracts
  • Routine Maintenance
  • Pothole repair
  • Shoulder grading
  • Repair guide rail and fences
  • Road sweeping
  • Debris removal
  • Traffic signal and illumination- scheduled
    maintenance and repair
  • Bridge cleaning, scheduled maintenance (lift
    bridges) and minor repair
  • Sign replacement
  • Line Painting
  • Grass cutting and weed control
  • Winter Maintenance
  • Plowing, sanding and salting
  • Patrolling
  • Visual Inspection
  • At Least Daily in Winter
  • Emergency
  • Response to collisions, spills
  • Resources
  • Equipment sold to Contractor
  • Yards Leased to Contractor

5
Maintenance ContractingAMCs
  • Initial Concerns
  • Highway Safety
  • Savings
  • Long Term Sustainability
  • Competitive Environment
  • Access to Work for Industry
  • Quality Assurance
  • Allocation of Risk
  • Consistency of Contract Administration

6
Maintenance ContractingAMCs
  • Results
  • Variety of Industry Participation
  • Competition
  • Industry Capability Increased
  • Considerable Potential for Savings
  • Job Opportunities for Staff
  • Staged Implementation (4 years) allowed Contract
    updates

7
Maintenance ContractingAMCs
  • New Roles, New Opportunities
  • Contract Management vs. Supervision
  • Quality Assurance, Performance Measures
  • Documentation by Contractors
  • Importance of Good Relationships and
    Communication with Industry
  • Shared Role in Research Development
  • Retention of Knowledgeable Staff/Knowledge
    Transfer to Industry

8
Maintenance ContractingAMCs
  • Conclusions
  • Our Objectives Have Been Reached
  • Savings Quality - Industry Participation
  • Potential for Further Efficiencies Through
  • Refinements in contracting methods, clauses
  • Increases in scope of work (ie Rehabilitation)
  • Fostering Technology
  • Provincial/Municipal co-operation

9
  • Thank You
Write a Comment
User Comments (0)
About PowerShow.com