Title: Ontario Recycler Workshop
1Ontario Recycler Workshop
Slide 1
2Welcome!
Slide 2
- 5th Ontario Recycler Workshop
- Joint initiative of
- Waste Diversion Ontario (WDO)
- Stewardship Ontario
- Association of Municipalities of Ontario (AMO)
- Participants from across the province beyond
- municipal recycling co-ordinators/waste
management staff, Councilors, consultants,
stewards stewardship program representatives
3Goals for the Day
Slide 3
- Update on the Effectiveness Efficiency (EE)
Fund as a whole - Update on some key EE funded projects/ priority
areas - Discussion of next stepsmoving from EE Fund to
new Continuous Improvement Fund (CIF)
4Our Audiences
Slide 4
- In person (80)
- Webcast audience (40)
- listening with slides, on-line
- type in questions or comments directly on webcast
console - Archived webcast slides available at
www.stewardshipontario.ca
5Agenda
Slide 5
- EE Fund Report
- Multi-family recycling issues projects
- Report on Optical sorting technology projects
- Break (lunch!)
- Recyclers Knowledge Network (RKN)/best practices
project update - Continuous Improvement Fund (CIF) planning
6Poster Session During Break
Slide 6
- Enviro Net PilotChristine Baker, Municipality of
West Perth - Quinte Clear Garbage Bag PilotRick Clow, Quinte
Waste Solutions - Blue Box Lid Clear Garbage Bag Project, Peter
Veiga, Town of Markham - Online Survey Blue Box Recycling Training Needs
Assessment Alex Hogan Associates
7EE Fund Overview
Slide 7
- 10 of industry contribution to municipalities
- 19.75M available over first 4 years
- 16.35 committed to date3.4M still available to
end of June 2008 - Objectives
- reduce system cost
- minimize cost increases as recovery increases
- build capacity for sustainable recycling system
- 64 projects approved to date (consolidated)
8EE Fund Spending by Priority Area - new
Slide 8
9EE Fund Spending by Geographic Area
Slide 9
10Moving from Best Practices (BP) to Continuous
Improvement
Slide 10
- Minister still requires that stewards pay 50 of
BP system costs - Still soliciting projects to determine how to
implement BP - Added emphasis on system capital
- Focus on
- fundamental BPs measuring impacts of other
practices - training
- modifying RKN adding information on BP
continuous improvement, supporting training
11Capital Projects Infrastructure Planning
Slide 11
- 7M in capital projects to encourage efficiency
innovation for infrastructure/technology, e.g. - optical sorting installations (Toronto, Durham,
Scarborough, Peel) - multi-family (MF) recycling equipment (Toronto,
Elliot Lake) - automated transfer system (Dryden)
- carts automated collection (Toronto,
Essex-Windsor) - glass clean-up technologies (York)
- Infrastructure planning
- London regional MRF
- exploring cooperative planning
12EE Priorities for Next 6 Months
Slide 12
- Expanding RKN with development of training
presenting BP project results - Training strategy as per BP report
recommendations - Promotion Education (PE) best
practicesworkshops/TV /print/web/radio pilot - Technology installations/improvements/transfere.
g. optical sort - Inter-regional planninge.g. new MRFs plastics
processing - MF residential
13Getting the Word Out
Slide 13
- RKN current, topical content by for ON
recyclers, including move to training forum - Hands-on resource people
- A-Team Northern Ontario Blue Box Program
Technical Advisor - special assignments to BP Enhancement project
- peer review of contracts
- MF working group
- In-the-Loopquarterly newsletter
- ORWspring fall each year
- Posting reports project evaluations 30 posted
to date
14 Going Forward
Slide 14
- Transitioning from EE Fund to Continuous
Improvement Fund - double the funding available to municipalities
- greater support to applicants (e.g.
new/independent dedicated fund manager reporting
to MIPC) to reporting results - more proactive approach to supporting system
improvements
EE Fund applications always welcome!
15Multi-family Issues in Municipal Residential Blue
Box Recycling
Slide 15
- Phil Jensen
- Stewardship Ontario
16Multi-family Opportunities Challenges
Slide 16
- MF residents comprise nearly a quarter of ON
population - Issues are common but complex
- Studies point the way, implementation becoming
the focus - Multi-residential task group (EE Fund 215)
generating ideas, needs willing hosts
17Other Multi-family Projects
Slide 17
- Baseline MF recycling studies
- AMRC6 communities
- Essex-Windsor
- Using focused PE to optimize MF recycling
performance - Enhanced recycling in MF buildings in Markham,
Richmond Hill Vaughan - MF system improvements in 7 communities (AMRC)
- MF working group support (AMRC)
- Elliott Lake MF recycling
- MF waste audits waste audit results analysis
18Speakers
Slide 18
- Liz Parry, Stewardship Ontario Stewardship
Ontarios MF waste audit project - Peter Kalogerakos, Region of Peel On-board weigh
scales for MF recycling - Nicole Dufort, City of TorontoReaching MF
households an insider look at Toronto's
strategic planning
19Multi-family Waste Audits
Slide 19
- Liz Parry
- Stewardship Ontario
20Project Summary
Slide 20
- Project goal conduct waste audits in ON
multi-family (MF) buildings - Anticipated impacts data set to support present
future work in MF recycling - Email lparry_at_stewardshipontario.ca
- Website www.stewardshipontario.ca/eefund/projects
/audits/waste_audit.htm
21Why Does Stewardship Ontario Conduct MF Audits?
Slide 21
- Blue Box Program Plan directs Stewardship Ontario
to complete residential waste audits every year - Lack of MF baseline waste composition data
- Different communities use different methodologies
- Data collection analysis can be difficult to
manage - Large volumes of material makes auditing
expensive - Health safety issues
2241 MF Audits 9 Municipalities
Slide 22
23The Process
Slide 23
- Waste collection, sampling sorting material
from MF buildings - work with partner municipalities contractors
- buildings represent mix of housing types serviced
by partner municipality - baseline data can be used by all programs with MF
residential housing
24Audit Process
Slide 24
- Standard sampling sorting protocol for MF
buildings - Every year
- identify partner municipalities sample
buildings - collect analyse data
- develop generation, recycling garbage estimates
for variety of materials
25Waste Audit Data
Slide 25
- Stewardship Ontario uses waste audit data to
- assess waste generation for setting fees
(cross-check with stewards reports) - determine recovery performance of existing
programs - assess opportunities priorities to improve
recovery
26Findings (1)
Slide 26
- Confirms that MF recycling performance weaker
than in single family households - MF audits more complicated to implement than
single family audits - cost
- health safety concerns
- High volume of material
27Findings (2)
Slide 27
- Based on average of results (no accounting for
time of year, building size or urban vs. rural) - Total waste generated per household per year is
600 kg/hh/yr - 40 of paper and paper packaging is captured
- 50 of core blue box material is captured
28Best Practices
Slide 28
- Provides baseline information for studies
focusing on MF performance - AMRC study building characteristics related to
recycling performance - barriers to participation
- limitation to data as presented online
- Continued analysis to consider
- MF versus SF performance
- materials to target
- differences between buildings
- impacts of recycling set-up carts, chutes,
labeling
29Next Steps
Slide 29
- Continue to analyze data
- Working on plans for 2008
- Results available at www.stewardshipontario.ca
30Onboard Weigh ScalesA Multi-Residential
Weight-Based Waste Recycling Generation Pilot
Slide 30
- Peter Kalogerakos
- Region of Peel
31 Project Summary
Slide 31
- Project goal pilot the use of onboard scales to
measure generation of waste recycling on a per
building basis - Anticipated impacts
- identify buildings with low diversion rates
- provide framework for User Pay System
- Email peter.kalogerakos_at_peelregion.ca
- Website www.peelregion.ca/waste
32The Issues
Slide 32
- Diversion rates in Multi-Residential (MR) sector
very low - Currently, no efficient method to track waste
generation diversion per building - Diversion rates vary from building to building
- usually dependent on
convenience, commitment from building management,
recycling capacity - No accountability for poor recycling rates /or
excessive waste generation
33The Project
Slide 33
- Two front end garbage trucks two side-loading
recycling trucks outfitted with onboard scales - Weight data used to
- calculate waste generation rates
(kg/building/week) - calculate waste diversion rate per building
- calculate average density of compacted/un-compacte
d waste single stream recyclables - target buildings with low diversion rate
- measure impact of front-end recycling collection
- Relatively low capital operating costs
34Implementation
Slide 34
- Submit application for EE funding
- Establish agreement with waste collection
contractor - to allow installation of onboard scales on trucks
- to have drivers operate the scales
- to allow the necessary wireless communications
- Purchase install onboard scale system
- Establish test data communication between
trucks remote servers - Begin data collection
35Onboard Scale Data Flow
Slide 35
36Tonnage Financial Impacts
Slide 36
- Total Project Cost 100,000
- includes scale hardware, software, modems, 1 year
wireless service fee, 1 year server hosting fee - does not include in-kind staffing costs, cost for
additional years of wireless service server
hosting - Tonnage Impacts
- no anticipated change in tonnage
- scales can measure changes in tonnage as result
of program enhancements i.e. front-end recycling,
user pay system
37Project Deliverables
Slide 37
- Diversion rates for buildings in Peel Region
- Average generation rates (kg/hh/week) for garbage
recycling streams - Average density of compacted/un-compacted garbage
- Average density of single-stream recyclables
- Evaluate potential of scale system for use as
tracking system in user pay program for MR
properties
38Best Practices
Slide 38
- Project 123 pilots a measurement tool
- Onboard scales may prove to be best practice for
program-wide recycling measurement - Onboard scales can measure effect on recycling
rates due to MR program changes i.e. front-end
recycling, PE outreach efforts, user pay system
39Next Steps
Slide 39
- Data collection to commence before end of 2007
- Trucks to be rotated through routes to collect
data from all MR buildings over pilot period
beyond - Results will be available November/December 2008
- average waste densities
- diversion rates
- waste generation rates
- scale performance
40Planning Multi-family Communications
Slide 40
- Nicole Dufort
- Manager, Communications Consultation
- City of Toronto
41The Project
Slide 41
- Project goal Increase diversion rate (by
launching volume-based rate structure in MF
buildings receiving City collection by July 2008) - Impacts Develop recycling plans in MF buildings
- More information
- Nicole Dufort 416-392-296 ndufort_at_toronto.ca
- Katie Herbert 416-397-5001 kherber_at_toronto.ca
- www.toronto.ca/recycle
42Project
Slide 42
- Toronto rolling out new multi-unit programs
- Multi-unit residents primary audience for first
time - Communications planning public education
- Most municipalities facing same daunting
challenge - Change attitudes persuade people to alter
behaviour - Move through 4 stages
1) sensitizing 3) conviction (the why) 2)
awareness 4) action (the what)
43Following Social Marketing Principles
Slide 43
- Theoryawareness alone wont change behaviour or
attitude - Knowing the Why, the motivators, important so
is knowing barriers to behavioural change - Barriers may include inconvenience, commitment,
cost - By determining barriers can produce tools to
overcome them - Our first step? Getting to know our audiences!
44Getting to Know Our Audience
Slide 44
- Strategic approach starts with target audience
- We ask ourselves questions about our audience,
their current behaviour how to persuade them to
adopt new behaviour
E.g. Who are they? What are their
socio-economic physical characteristics?
What do they value? What are barriers to
reaching them? How receptive to adopting new
behaviour?
45Questions Behaviour
Slide 45
- Is it new? How much change from current
behaviour? - What specifics are they being asked to do?
- What skills needed to make changes?
- What are barriers to adopting new behaviour?
- One-time action or permanent change?
- Easy or hard? i.e. convenient? time-consuming?
- Is there negative or positive reinforcement? i.e.
What are the rewards/incentives? What penalties
for not doing it? - Will there be peer pressure for or against?
- What tools are they being provided?
46And We Do Research
Slide 46
- Often make assumptions but research is better
- qualitative, e.g. focus groups
- quantitative, e.g. telephone surveys
- 2 audiences
- building owners/managers/supershave had industry
meetings used others research findings - residentsfocus groups in plan
- assuming daunting due to transience, language
cultural differences, lack of ownership of
waste, space issues, etc. - census data says condo owners increasing
47Building Owners, etc. (1)
Slide 47
- Based on our homework so far, tactics will
include - information sessions
- template for Recycling Improvement Plan
- recycling handbook (in multiple languages)
- website info with Customer Service phone e-mail
48Building Owners, etc. (2)
Slide 48
- Newsletter
- Posters stickers
- Sample letters signage
- Recycling card for residents
49Residents
Slide 49
- Tactics will include
- focus groups
- advertising campaign
- door-to-door newsletters
- website
- info for councillors newsletters
- info package for tenant boards/committees
- personal visitsmay use resident advocates
50Optical Sort Projects
Slide 50
- Peter Watson
- Durham Region
51Why a session on Optical Sorting Technologies?
Slide 51
- Optical sorting is new to Ontario (ON)
- pre 2007 1 Blue Box MRF with optical sort for
containers in ON - 4 new installations in 2007 expect more to come
- 3 in single stream MRFs 1 in a 2-stream MRF
- This session focuses on
- what we are learning from recent installations
- costs benefits
- what does the future hold for automating MRFs?
52Other Optical Sort Projects
Slide 52
- Feasibility Study for GTA Centralized Plastics
Recovery Facility - Optical Sorting Equipment for Essex-Windsor MRF
Phase 1 RFP Process
53Speakers
Slide 53
- Al Metauro, Metro Waste Paper Recovery
Inc.Optical Sort Installations Plans in
Scarborough, Ottawa, Durham - Dave Gordon, Region of Peel Single Stream MRF
Optical Sortation of Plastics - John Baldry, City of TorontoOptical Sorting for
Plastics at the Dufferin MRF
54Optical Sorting Equipment Enhancing Fibre Quality
Slide 54
- Al Metauro, CEO
- Metro Municipal Recycling Services Inc.
55Project Summary
Slide 55
- Project goal improve quality of 8 ONP sorted by
single stream systems - Anticipated impacts increase mechanical sorting
efficiency decrease processing costs - Email ametauro_at_metrowaste.com
- Website www.metrowaste.com
56Issue
Slide 56
- Disc screen efficiency is not 100
- 8 ONP shipped to end markets exceeding allowable
outthrows contaminants - Manual sorting is not
- efficient to meet
- required throughput
57The Project
Slide 57
- Assess operational efficiencies financial
return of optical sorting technology - remove contaminants from paper fibre sorting
lines - yield mill acceptable 8 ONP
58Implementation
Slide 58
- Minimizing impact on production
- scheduling extra production days prior to tear
down - prepare site in advance wiring, platform
extensions, pre-assembly, air lines - installation schedulearound the clock shifts
- Nothing we would do differently
- No surprises
59Pre Optical Sorters
Slide 59
4 Sort Lines 6 Sorters/Line Capture Rates 44
by weight 26 by units Contamination 4 to 8
60Tear Down to Start Up in 7 Days
Slide 60
2 Optical Sorters 5 Sorters/Line Throughput
Data n/a
61Tonnages Costs
Slide 61
- Changes in tonnages
- line speed at 90 currently
- will be able to meet pre production throughput
- Cost Issues
- project cost appears to be on plan
- in process of determining cost savings
- financial issues project delay impact on ROI,
lost production due to additional days to install
62Findings to Date
Slide 62
- Project meeting expectationquality is improved
labour is on plan - Learning curveprogramming equipment to meet our
needs - No real problems to dateupgrade conveyor belts
- Approach proving positive considering volume
throughput
63What We Are Measuring (1)
Slide 63
- Preequipment installation measurements
- Pre Sort Line determined material composition by
analyzing material units average weight/linear
meter of belt - ONP QC Line ran line with no sorters to
determine the of non paper unitsran line with
sorters determined units captured - Other Measurements efficiency of the screens
64What Were Measuring (2)
Slide 64
- Postequipment installation measurements
- same data will be collected
- pre-sort data will be used to ensure material
composition is consistent - throughput will be measured against manufacturer
specs
65Reporting Results
Slide 65
- Results to be summarized in report for
distribution by Stewardship Ontario - primary focus ability of equipment to maintain
consistent mill quality - financial analysis to determine cost savings
quality benefit against investment - With data collected programming perfected use
data to set standards for justifying this
equipment in other facilities
66Optical Sorter Technology for Plastic Containers
Slide 66
- Dave Gordon
- Region of Peel
67 Project Summary
Slide 67
- Project goal increase recovery rates of
container materials at MRF - Anticipated impacts Optical Sorting Technology
(OST) will enable automated sortation of PET
increase efficiency of manual sorters on
container line - Email dave.gordon_at_peelregion.ca
- Website www.peelregion.ca/waste
68Issue
Slide 68
- Recovery rates for several container materials
lower than rates required in contract - Changes in PET container volume composition
- growth in single serve
water bottles - continued development
of lighter weight PET - Change in PET straining manual sorters ability
to achieve required recovery rates on containers
69The Project
Slide 69
- Installation of OST unit to sort PET containers
prior to container sorting line - selected MSS Sapphire dual eject unitpriority
will be to sort PET will have capability to sort
an additional container material - installation to include Automated Drum Separator
to remove 2-dimensional objects (flatssmall
fibre film plastic) prior to OST unit
70Implementation
Slide 70
- OST system scheduled for installation early in
2008 - Equipment ordered Region reviewing
configuration, layout final design - WMCC contractually obligated to install
commission OST no later than April 13, 2008
71Tonnage Financial Impacts
Slide 71
- Cost
- 1.5M capital to purchase install equipment
- 750K for equipment
- 750K for retrofit installation
- estimated increase in annual revenue 260K
- estimated annual labour savings 180K
- project cost split between Region of Peel, Waste
Management of Canada Corporation Stewardship
Ontario - Increased diversion tonnage
- 670 tonnes of PET annually
72Results/Findings (to date)
Slide 72
- Performance of OST Automated Drum Separator in
US MRFs was impressive - OST should improve MRF performance increase
required recovery rate of PET potentially other
container material - Would likely include OST in design spec for any
new MRF
73What Were Measuring
Slide 73
- MRF had to meet 3 performance hurdles during
commissioning - achieve throughput of 35 tph
- achieve material-specific recovery rates
- achieve defined market specs for all container
material - Region has detailed information on material
stream composition facility performance through
completion of 2 acceptance tests - Once OST equipment is installed, WMCC
contractually obligated to demonstrate that 93
PET capture rate can be achieved
74Reporting Results
Slide 74
- Report will be prepared by Region to review
assess recovery rates on all container material
pre post installation of OST equipment
75Next Steps
Slide 75
- November 2008finalize equipment layout design
- December/January 2008install equipment
- February 2008commission test
- April 2008report on findings
76Dufferin Optical Sortation
Slide 76
- John Baldry
- City of Toronto
77 Project Summary
Slide 77
- Project goal
- minimize manual sortation of containers
- Anticipated impacts
- lower cost
- higher quality
- Email jbaldry_at_toronto.ca
78Why Optical Sortation for Containers?
Slide 78
- Presently all sortation done manually
- Leads to unsatisfactory capture rates
- Quality issues
- improved ability to high grade plastics streams
- possible reallocation of sorters to other
material streams - PVC contamination
79Key Factors in this Project
Slide 79
- Installing optical sortation equipment at
Torontos Dufferin MRF facility - will be installed commissioned in February 2008
- Facilitated by
- co-operation of contractor, Stewardship Ontario
City of Toronto - shared funding (725K grant from Stewardship
Ontario) - Impacts on efficiency?
- to be proven after installation
- capture purity anticipated to be at least what
is achieved with manual sorting
80Implementation
Slide 80
- City assigned 3 staff to assist in making project
go forward - initial feasibility study
- 1 month total staff time to date since July 6,
2005 - sufficient skills knowledge available between
the 3 parties - Key learnings
- feasibility study to consider options other
technology which materials should be optically
sorted - realistic timelines for project
- evaluation of peripheral equipment
- placement of Quality Control sorters
- Late request to consider additional sortation of
fibre/poly hot drink paper cups
81Expected Impacts
Slide 81
- Costs savings
- project cost 1.5M
- anticipated cost savings 185,000/year
- other financial issuesCanada Fibers will accept
up to 5,000/ year maintenance - Tonnages
- no changes at time of launch but redundancy built
in
82What Were Measuring
Slide 82
- Pre-installation
- equipment installation measurements
- audits of inbound mix
- measurements of production volumes
- Post-installation
- equipment installation measurements
- monitoring protocol under development
83Results Findings to Date
Slide 83
- Pre-installation monitoring to determine
composition of container line residue (material
weights counts) - Pre-installation waste composition data provides
information on feedstock
84Reporting Results
Slide 84
- Once post-installation monitoring complete,
report on - labour savings
- capture rate impacts
- down time analysis
- maintenance costs
- end-market response (quality price)
85Next Steps
Slide 85
- Equipment ordered from Machinex
- Installation planned for late February/early
March 2008 - MRF to be shut down for 1 week
- Source separated recycled materials (SSRM)
inventory plan to be developed to accommodate
shut-down period - May use findings to choose equipment for new
facilities
86Municipal Recycling Training Strategy
Slide 86
- Alexandra Hogan Associates
87Project Summary
Slide 87
- 3 year training plan for Ontario recycling
program operators - General need identified through Best Practices
Enhancement Project - Strategy will identify focus on required skills
knowledge, implementation - Email alex_at_hoganonline.ca
88Steering Committee
Slide 88
- Bonnie Ballam (Toronto)
- Linda Churchill (Waterloo)
- Lindsay Milne Rob Rennie (Peel)
- Bruce Dodds (Elizabethtown-Kitling)
- Gary Everett (WDO)
- Geoff Love (Stewardship Ontario)
- Phil Jensen (Stewardship Ontario)
89Key Features
Slide 89
- Situation analysis needs assessment
- focus on your needs challenges
- priority training topics
- appropriate learning methods
- potential development delivery partners
- certification for some or all of training
- Seeking input from all in ON municipal recycling
- 10 to 15 minutes for needs assessment e-survey
90Next Steps
Slide 90
- Share your views at www.wdo.ca
- Focus on
- skill/knowledge gaps
- barriers to training
- potential for certification
- Report (Dec.) data research input from
steering committee project team ? strategy
recommendations
91Help Us Assess the Need
Slide 91
- Dont miss this opportunity!
- 2 survey stations set up in lobby during lunch
- Take 10 minutes to get your thoughts on record
- Thanks!
92Summary
Slide 92
93Enjoy your Lunch!ORW resumes at 115 p.m.
Slide 93
- To complete the Blue Box Recycling Training
Needs Assessment Surveysee Latest News at - www.wdo.ca
94Welcome Back!
Slide 94
95Moving Forward in Recycling
Slide 95
96Afternoon Agenda
Slide 96
- Clayton Sampson, WDOORW Seminar Series
Northern Technical Advisor Activities - Francis Veilleux, Bluewater Recycling
AssociationBest Practices on Recyclers Knowedge
Network - Glenda Gies, WDOContinuous Improvement Fund
97Whats New?
Slide 97
- Clayton Sampson
- WDO Northern Technical Advisor
- CSampson_at_wdo.ca
982 Topics Today
Slide 98
- ORW Seminar Series introduced 2 new seminars
yesterday this morning - Sustainable Finance
- Promotion Education
- Role as Northern Technical Advisor for WDO
99ORW Seminars Sustainable Finance
Slide 99
- Municipal experiences in financing waste
management as self sustaining cost centre - Staff elected officials representing 4
communities - Geoff Rathbone Councillor Adam Giambrone, City
of Toronto - Anne-Marie Fowler, City of Ottawa
- Todd Pepper Councillor Rob Schmidt, Essex
Windsor Solid Waste Authority - Francis Veilleux, Bluewater Recycling Association
100Sustainable Finance Seminar Achievements
Slide 100
- Introduced study (to be completed December 2007)
- Profiled Sustainable Finance (SF) activities in
the 4 ON municipalities - Gained perception of SF issues from Councillors
in 2 communities (Toronto Essex-Windsor) - Participants discussed SF challenges
101ORW Seminars Promotion Education
Slide 101
- Explored core elements of successful Promotion
Education (PE) for recycling - Communications industry municipal
representatives - Alfred von Mirbach, REIC Perth
- Anne Boyd, City of London
- Barbara McConnell, Stewardship Ontario
- Clayton Sampson, WDO
- Joe McKenna, Durham Region
- Laurie Watt, Simcoe Media Group
- John McIntyre Peter Sellers, ad agencies
- 60 municipal staff responsible for or
interested in communications process
102PE Seminar Highlights
Slide 102
- Presentations discussions on
- strategic communications planning
- budgeting (costing frequent PE tactics)
- benchmarking measuring PE impact
- building good relationships with media
- developing advertising with social marketing
messages
103Seeking Feedback on Seminars
Slide 103
- Seminar slides webcast (with discussion) at
www.stewardshipontario.ca/eefund/orw/orw_main.htm
- Feedback needed!
- do municipal staff want more PE training?
- are seminars best presented in person, online or
both? - future topics?
104Northern Technical Advisor Activities
Slide 104
- EE Fund Project to provide a support position
for Northern Ontario (NO) programs - Best Practice Project identified desire to have
dedicated support to NO programs - Build on A-Team concept
105Northern Ontario Barriers
Slide 105
- Lack of technical support
- Difficult to proactively network
- Limited resourceshuman, financial
- Geography
- Lack of competition
106Project Goals Activities
Slide 106
- Contact /or visit most NO programs
- Provide basic technical operational advice
- Coordination/facilitation to help deal with
distance, isolation lack of competition
107Project Goals Activities
Slide 107
- Develop networking links within the north with
south - Assist to develop messaging specific to northern
issues - Enhance effectiveness efficiency of NO programs
108For More Information
Slide 108
- Email csampson_at_wdo.ca
- Telephone (519) 539-0869
- Cell phone (519) 532-2524
109Our Next Speakers
Slide 109
110Focus on Change!
Slide 110
- Changes that will impact all Ontario municipal
blue box residential recyclers - new opportunities through redesign, retooling
relaunch of Recyclers Knowledge Network (RKN) - EE Fund developments
- expanded Continuous Improvement Fund
111Introducing
Slide 111
- Francis Veilleux, Bluewater Recycling
AssociationBest Practices Project on RKN whats
coming how you can use it - Glenda Gies, WDOWhat is the Continuous
Improvement Fund?
112Best Practices Recyclers Knowledge Network
Slide 112
113Best Practices
Slide 113
- Defined as
-
- Identifies 8 Fundamental Best Practices
- Applicable to all programs
Waste system practices that result in attainment
of provincial and municipal Blue Box material
diversion goals in the most cost-effective way
possible
114Best Practice Recommendation
Slide 114
- Objective
- make best practices information recommendations
more accessible - Tactic
- distill post in bite-size chunks on the
Recyclers Knowledge Network
115Recyclers Knowledge Network
Slide 115
- Launched in 2006
- Managed by Stewardship Ontario
- Municipal recycling program resources
- Promotion and Education
- Sustainable Financing
- User Pay
- 1 vs. 2-Stream
- Rural Depots
116Knowledge Network Makeover
Slide 116
- New look
- New functionality
- New login page
- Easier navigation
- Lets see together!
117Log-In
Slide 117
118Home Page
Slide 118
119Click on Doors
Slide 119
120Best Practices
Slide 120
121Multi-Municipal
Slide 121
122Best Practices
Slide 122
123Promotion Education
Slide 123
124Best Practices
Slide 124
125Decision Tree
Slide 125
126CommunityProfile
Slide 126
127Continuous Improvement Fund
Slide 127
- Glenda Gies
- Waste Diversion Ontario
128Cost Containment Plan
Slide 128
- Approved by Minister in December 2004
- Requires that net cost funding reflect best
practices in 2008 - To meet this objective, MIPC undertook best
practices study - Blue Box Program Enhancement and Best Practices
Assessment Project Report - Volume 1 identified best practices
- Volume 2 cost model
129Best Practices Report
Slide 129
- Identified system needs
- capital investments
- route optimization
- increased PE
- training (including workshops)
- co-ordination standardization among programs
- northern regional support
130Implementing Best Practices
Slide 130
- Recommended that EE Fund
- be used strategically to overcome barriers
- avoid funding projects that would be implemented
anyway - intervene in marketplace where appropriate
- provide technical or facilitation assistance
rather than direct funding where appropriate - support projects with province-wide and/or
regional benefits - act as a catalyst to spur other investment
- support new applications of proven technologies
MRF rationalization - including capital investment where appropriate
131Best Practice Cost Model (1)
Slide 131
- MIPC updated cost model with 2006 data
- MIPC then calculated series of optional best
practice system costs by applying variety of
assumptions such as - container/processing equipment amortization
periods - management training PE cost allowances
- MRF capacity equipment efficiencies
132Best Practice Cost Model (2)
Slide 132
- MIPC then compared
- optional best practice system costs from 131.5M
to 148M - reported 2006 Blue Box net system cost 133M
- MIPC agreement
- use reported 2006 net system cost for setting
fees for 2008 - allocate 20 of stewards contribution to
municipalities to directed Continuous
Improvement Fund - Continuous Improvement Fund (CIF) to
- replace EE Fund
- start in 2008
133CIF Intended To
Slide 133
- Support implementation diffusion of best
practices - increase public awareness public participation
- rationalize identify new approaches for
existing infrastructure - develop new infrastructure as required
- provide training
- promote measure continuous improvement
134Continuous Improvement Fund (1)
Slide 134
- Shift responsibility to MIPC for
- development/approval of operating procedures
- approval of fund expenditures
- Funds will roll over for 3 years
- Continuation of fund allocation to be
reviewed after 3 years - recognizes longer project lead times duration
- should CIF be discontinued, remaining funds will
be distributed to municipalities
135Continuous Improvement Fund (2)
Slide 135
- Fund to be segregated
- administered by Stewardship Ontario
- with annual audited financial statements
- Incremental administration costs to be covered
from fund - dedicated fund manager to be hired
- Blue Box Assistance Team will report to manager
136Continuous Improvement Fund (3)
Slide 136
- Strive to balance funding for continuous
improvement with ensuring reasonable equality in
access - MIPC municipal representatives may, collectively,
apply to CIF for additional staff analytical
support for Blue Box Program Plan implementation
issues
137Memorandum of Agreement (MOA)
Slide 137
- CIF agreement outlined in MOA
- Approved signed by
- WDO
- Stewardship Ontario
- AMO
- City of Toronto
138Next Steps
Slide 138
- Development of CIF Strategic Plan to address
- purpose
- measures of success
- operating governance structure
- guiding principles for fund expenditures
- MIPC held retreat in early November, supported by
consultant - Timeline for next steps
- draft preliminary Strategic Plan to MIPC for
review late November - draft final Strategic Plan to WDO Board for
approval mid- December
139In conclusion...
Slide 139
- More information
- email glendagies_at_wdo.ca
- website www.wdo.ca
140Questions Answers
Slide 140
141Wrap-Up
Slide 141
142Thank You
Slide 142
- To view presentations webcast archive,
- visit www.stewardshipontario.ca