Title: Logistics Update Industry Day Dec 08
1Logistics Update Industry DayDec 08
COL Shelley MahoodARNG G4703-607-7481
2Armys Equipping Strategy
Transition to Operational Force
- Standardized MTOEs across all compos
- More capable MTOEs
- Same modernized equipment across all compos
- Provide cyclic, predictable readiness
- Resourced at 100 of requirements
Implement Modularity, a Plug Play Concept
Dependence on ARNG units
State of the ARNG Since 9/11 Level of Activity
3Why is 100 Equipment Needed?
- It takes more than 100 of a units
requirement to mobilize it - Replace broken equipment
- Train in Pre-Mob
- Equip Mob Stations
- - Support TPE
- - Battle Losses
- Equipment in Transit
- 17- 22 Delta to be covered by Non Deployers
- Supply does not keep up with demand so you must
cross level internally - Starting at 100 every 2 units deployed breaks 1
- Starting at 70 every unit deployed breaks 8
4 ARNG Cross-leveling to Support Deployments
5Aug 08 Equipment-on-Hand
- Does not include TDAs
- Includes acceptable substitutes
- Expect slight reduction in FY10 due to increase
in requirements
6Rapid Fielding Initiative (RFI) Items for All
Soldiers
ACH Calipers tape Measure
Combat Ear Plugs
ECWCS Outer shell
Advanced Combat Helmet Cover
Sports Bra
Hydration System
Close Combat Optics
ECWCS Fleece
Silk Weight Underwear
Improved First Aid Kit
Cmbt Avn Winter Gloves
Knee Elbow Pads (BCT Item)
MOLLE Accessories
Modular Sleeping System
RFI Sizing Kit 3 ea. duffle bags 1 ea. soft
shell pants of each size 15 ea. 1 ea. soft
shell jacket of each size 15 ea. 1 ea. fleece
jacket of each size 15 ea. 1 pr. winter gloves
of each size 7 pr. 1 pr. combat gloves of each
size 6 pr. 1 ea. sports bras of each size 5
ea. 1 ea. ACH of each size 4 ea. 1 ea. ACH
covers of each size 2 ea. 1 ea. caliper 1
ea. 1 ea. tape measure 1 ea.
Seatbelt Strap Cutter
Multi-purpose Tool
Pilot RFI Sized Items
7Rapid Fielding Initiative (RFI) Unit Items
Improved Spotting Scope Tripod
Haligan Tool (Large)
M249 Short Barrel
M4 Improved Buttstock
M24 Small Binoculars
Viper (VECTOR 21)/ Mark VII Handheld Laser Target
Locators
M249 M240B Soft Ammo Pack
M240B Combat Ammo Pack
Fiber Optic Viewer
Back Up Iron Sights
MICH Comms Systems Accessories
Rifle Combat Optic
8ARNG RESET Program
Field- Level RESET
- On-equipment repair to rapidly restore to
normal operation - Repair and return to user
- FY08 Executed 167M to reset 5 BDEs 638 units
within the 360 day metric -
- FY09 Funded 137.8M for 499 units
- Rebuild or overhaul of major assemblies and
subassemblies - Repair return to supply system payback plan
will be required for RC equipment per DODD 1225.6
9ARNG Facilities Posture
No TAG projects added for four years
Quality
Quantity
WA
ND
NH
MT
MI-UP
AK
VT
MN
ME
SD
OR
WI
ID
WY
NY
MI
IA
NE
PA
NV
OH
MA
RI
UT
MO
CO
IL
IN
WV
KS
NJ
CT
KY
CA
DE
VA
MD
OK
GU
TN
NC
NM
AZ
AR
DC
SC
AL
GA
MS
PR
TX
LA
HI
VI
FL
ISR Quality by State
ISR Quantity by State
17
29
8
0
27
27
10Opening December 5 www.ARNGLMS2009.com CALL
Linda Roberson at 703-740-1940
- Premier ARNG logistics event exceeding 1,100
attendees in 2008 PLUS more than 60 vendors. - Full scope of critical and current logistics
information, techniques and technologies. - Promotes synergy through networking, logistics
skills training, and sharing of best practices. - Open to ALL Army National Guard Logistics
USPFO personnel.
11(No Transcript)
12ARNG Equipping Distribution and Redistribution
Bridging Strategy
New Procurement / AC Cascading
ARMY fixes for DEFs
MOB
ALERT
IDENTIFY CANDIDATE DEF
NOTIFY
At 120 days out, identify Equipment Going to
RESET/ Depot/Recap and Fills for Cross-Leveling
Requirements
120 Days
100 MEEL
AVAILABLE
Candidate DEF Pool DEF
TRAIN / READY 3
TRAIN / READY 2
TPE/SBE Returns (TBD)
TRAIN / READY 1
RESET
HLD/DSCA Missions and Other Emerging Requirements
RESET/Depot/ Recap (as needed)
Redistribution of non-Candidate/DEF units
Maintaining Building Training HLD/DSCA
Capabilities
63 CONUS EOH means ARNG must
Then Build unit readiness across the states
While Maintaining, Building Training HLD/DSCA
capabilities
First Focus almost entirely on preparing DEFs
to deploy
Next Respond to emerging missions requirements
15 OCT 08 Changes per HQDA G3 FORSCOM RESET
Update Briefing