Division II Athletic Training Facility - PowerPoint PPT Presentation

1 / 21
About This Presentation
Title:

Division II Athletic Training Facility

Description:

Drywall material compose all walls within Training Room ... locker rooms which are located on each hallway outside of training room facility ... – PowerPoint PPT presentation

Number of Views:77
Avg rating:3.0/5.0
Slides: 22
Provided by: michelleg9
Category:

less

Transcript and Presenter's Notes

Title: Division II Athletic Training Facility


1
Division II Athletic Training Facility
  • Designed By
  • Kristen Hawkins
  • Michelle Grinkewich
  • Anna Thames
  • Brian Metz

2
Design of Facility
3
Parameters
  • Size
  • 70 x 70
  • 4,900 square feet
  • Budget
  • Allowed 125,000
  • Spent 110,605.79

4
Facility Operations
  • Staff
  • Four full-time ATCs
  • Two graduate assistants

5
Facility Operations
  • Hours of Activity
  • Decided individually by supervising ATC based on
    practice times of sport being covered
  • Needs outside of normal Training Room hours for a
    specific athlete will be scheduled by ATC of that
    particular sport

6
Facility Operations
  • Communication Method
  • Six walkie-talkies, supplied by the university,
    will be used among trainers between the Training
    Room and playing fields/courts
  • Cellular phones are a personal option of the
    staff members

7
Facility Appearance
  • Flooring
  • Two inch, non-slip tile in hydrotherapy area
  • Six inch tall and six inch wide tile lip
    surrounding hydrotherapy area to serve as a
    divider
  • Sloped floor in hydrotherapy area toward the
    drains located between each whirlpool
  • Remainder of Training Room given industrial grade
    carpet of a dark shade

8
Facility Appearance
  • Walling
  • Concrete blocks compose all four outer walls of
    Training Room
  • Drywall material compose all walls within
    Training Room
  • Both types will be of a light shade paint which
    is easy to clean
  • Extra ventilation will be provided near the
    hydrotherapy area

9
Facility Appearance
  • Measurements
  • Twelve feet high ceilings to allow for any
    special needs
  • (ex. having an athlete stand on a table to get
    a specific tape job)
  • Four and a half feet wide doorway entrances to
    Training Room to allow for easy access of any
    large treatment supplies, rehabilitation
    equipment, wheelchairs, stretchers, etc.

10
Facility Appearance
  • Windows
  • Made of double-paned, shatter-resistant glass
  • Four feet by four feet in size
  • Four feet from the floor
  • Blinds provided for option of privacy, except for
    the ones located between the rehabilitation and
    hydrotherapy areas

11
Facility Requirements
  • Air Conditioning and Heating Supply
  • Provided through ceiling vents
  • Control panel for open area located on wall
    outside of ATC office
  • Separate control panels located within each
    individual room
  • All thermostat control panels placed under a
    locked cover

12
Facility Requirements
  • Electrical Supply
  • Location and Number of Outlets
  • Strip along wall in treatment area totaling 12
  • 1 on either side of taping area
  • 1 behind refrigerator
  • 3 for computer and 1 for desk at workstation
  • 2 for Biodex work area
  • Strip along wall in rehabilitation area with
    exercise equipment totaling 6
  • 1 for each whirlpool
  • 1 behind ice machine
  • One on each wall in offices and private exam room

13
Facility Requirements
  • Electrical Supply (continued)
  • Placement
  • Hydrotherapy area outlets will be placed four
    feet above the floor, just below windows
  • All other outlets will be placed two feet from
    the floor
  • Voltage
  • 220V capabilities for whirlpool and Biodex
    outlets
  • 110V capabilities for all others

14
Facility Requirements
  • Electrical Supply (continued)
  • Specific Needs
  • GFIs for all outlets in hydrotherapy area
  • Surge protectors for all outlets supplying
    computers

15
Facility Requirements
  • Telephone Lines
  • 1 for the computer and 1 for the desk at the
    workstation
  • 1 in each office

16
Facility Requirements
  • Plumbing
  • Hot and cold water supply
  • Strong pressure
  • One inch inlets
  • Two inch drains

17
Facility Requirements
  • Lighting
  • Fluorescent illumination used
  • 75 footcandles in treatment area and private exam
    room for better visibility during the inspection
    process of evaluation
  • 50 footcandles throughout all other areas of the
    training room

18
Special Considerations
  • Office Supplies
  • Provided through the school
  • Includes desks, chairs, file cabinets, phones,
    computers, cleaning products, etc.

19
Special Considerations
  • Excess Money
  • 7,394.21 not spent used for any complications,
    unexpected needs, or emergency situations that
    may arise
  • 7,000 remaining placed in a travel fund for
    ATCs to be used towards CEUs, educational
    trips, etc.

20
Special Considerations
  • Needs Not Addressed
  • Showers, restrooms, water fountains, etc. found
    within or near the locker rooms which are located
    on each hallway outside of training room facility

21
Any Questions?
Write a Comment
User Comments (0)
About PowerShow.com