Title: End of Year Horror
1by Fantastic Floors
- End of Year Horror
- The following floor was done between 6-8 December
2006 - The floor is beetle ridden and in a bad state
this is what we did
2WOODSTOCK
- We took on a job on Wednesday 6th December which
for some reason I happened to had to manage but
never actually went to see initially, to quote
on ! - By now you must know we are exhausted the
pressure in sleepy holy is on all of a sudden
the suns out and the Capetonions comes to live ! - Demand - Demand - Demand beware the Transvalers
are coming and the foreigners are in Cape Town
everybody is cleaning up and this was our worst
horror for 2006 !
3Beetles
4Rats ???
5Holes, Cracks Craters
6Serious damage wood cracked off all needed
filling
7Buckled and warped and very uneven.
8And long in serious neeeed.
9Fixed best possibly tongue and groove floors
(which has been chipped and worn away) Blue
pointer rat holes ..
10WOW !!!! first coat
11BEFORE.. LOUNGE Complete house is in Oregon
Pine floors with an inlay of plain pine repairs
(see section between brackets) done previously
when client did renovations - Oregon Pine is
available for repairs if you need just ask next
time and we will do it properly !!??
12Same room.
13End result after sealer see normal pine (and
colour difference !)
14Fill-ups sanded down this section is oregon
pine in lounge
15Second coat.
16Kitchen after sanded down 4 times
17Sealed 3rd time floor so porous it would need
4, where the norm is 3 !
18Starting to seal
193rd Sealer ..
204th sealer (which normally should only get 3
coats but floors extremely porous)
21This floor is a horror uneven cracked and
warped should actually have been replaced !
22Fixed and filled to the best our ability !
23End result if you had seen this initially you
would not believe the final outcome
24Done !!
25Done !!!