Transcript and Presenter's Notes

Title: Comparison of MRP and JIT


1
Comparison of MRP and JIT
2
Planning Horizon
Figure 14-4
Assembly
Subassembly
Fabrication
Procurement
6
7
1
2
3
4
5
8
9
10
3
Issues to Consider
  • Forecast
  • Inventory/Backlog
  • Lead Times
  • Capacity constraints
  • Supplier information
  • Decides - when to place an order and how much.
    May choose supplier.

4
What is JIT?
  • What is Just in Time?
  • Delivery of parts to meet production
  • Production to meet customer demands
  • Means of production control
  • Which aspects are under the control of the
    company? Which are not?

5
JIT Production
C u s t o m e r
W H S E
A
B
C
D
E
6
Assembly Time Chart
Figure 14-9
7
Inventory Hides Problems
  • Machine downtime
  • Scrap
  • Vendor Delinquencies
  • Change orders
  • WIP

8
JIT Focus on Eliminating Waste
  • Over production
  • Waiting Times
  • Transportation
  • Idle inventory
  • Waste of motion
  • Production defects

9
How to Accomplish JIT
  • Design Process for JIT
  • Total Quality Control
  • Stable Schedule
  • Kanban Pull System
  • Work with Vendors
  • Reduce Inventory
  • Improve Product Design

10
Preconditions for JIT to Work
  • Stable Schedule
  • Stable Design
  • Perfect Supplier Quality and Delivery
  • Perfect Production Quality
  • Flawless Data

11
Concepts Applied in JIT Systems
  • Focused factory networks
  • Group technology
  • Quality at the source
  • JIT production
  • Uniform plant loading
  • Kanban production control system
  • Minimized set-up times

12
Shouldnt everyone use JIT?
  • For any company, how will the business situation
    change if JIT is implemented?
  • Can (shouldnt) Just in Time Production be used
    to meet customer needs?
  • What do we need to do from an operational
    standpoint to make JIT work?
  • What are the costs? What will be the benefits?
  • Best to view JIT as a set of practices which can
    provide ideas on ways to improve production.

13
For JIT Delivery
  • Steady planned production schedule
  • Can this be achieved if there are lots of changes
    to the mix or volume of what is delivered?
  • Short transportation distance to customer site
  • High supplier quality
  • Great communications with supplier
  • Fast and efficient movement, handling and
    tracking of parts coming into production.
  • Information System

14
For JIT Production
  • Available JIT supply
  • Reliable capacity (machines, labor, etc.)
  • Special equipment, containers, and transportation
  • Regular or known demand (Is this possible?)
  • Quality Output
  • Toyota Production Control System

15
The Production Control Difference
  • Given the short lead times and high variation
    required of todays production
  • One of the primary implementable items of JIT is
    as a production control system.
  • Focus on eliminating waste where practical
  • Queue limitation
  • Pull system
  • Attack quality problems at the source

16
What are the benefits of JIT?
  • Radical reductions in inventory
  • Squeeze out system variation
  • Usefulness of supplier relationships to improve
    quality and flow control
  • What is the cost to change the business to run
    this way? Training, new systems?
  • If you dont, you cant compete. Wallmart

17
MRP vs JIT
  • How do we tradeoff?
  • the needed to build in advance of an order(hold
    inventory) at several strategic points in the
    line so we can deliver on time.
  • the need to minimize inventory to reduce costs
    and improve efficiency.

18
MRP vs JIT - Strategic Supply Chain Management
  • Consider the IBM Situation
  • Suppose customers will wait only 4 weeks for
    delivery.
  • What length of forecasts will you need?
  • Should you hold inventory? At what stage in
    production? How much? Why?
  • How will demand or supply variability affect your
    decision?
  • Should we implement JIT here?

19
MRP JIT Systems
1
PS
C
FR 1
Where to hold the inventory?
1
2
C
1
6
B
Fr 2 4
TCM
Chips
Cus
MF
2
2
8
T
S
4
3
1
M
FR 3
6
2
1
B
FR 3
TCM
Chips
2
2
10
4
T
S
1
20
What will you consider?
  • Cost of parts
  • Amount of value add at each stage
  • Shelf life and quality issues
  • Reduction of flexibility at each step
  • Risk of over purchasing/producing vs shortage
  • Ability to hold and handle inventory
  • Remaining lead time and needs of market place

21
Questions
  • How do we apply JIT in the IBM scenario?
  • What items can we try?
  • Should we implement JIT full board?
  • How does variability effect the system?
  • What does variability make us want to do?
  • What is the JIT approach to solving a variability
    problem?

22
(No Transcript)
23
Compare MRP with JIT
  • Consider necessary production lead times
  • How can JIT compress the schedule?
  • What elements of the schedule must remain?
  • How does JIT overcome the necessary production
    schedules and lead times to deliver products Just
    In Time?

24
MRP vs JIT
  • How does a grocery store operate? Using
  • MRP
  • JIT
  • Mixed MRP/JIT
  • What factors would contribute to making a grocery
    store operate better?
Write a Comment