Title: Review of related TER work and European initiatives
1 TRANS-EUROPEAN RAILWAY (TER) PROJECT2nd
Expert Group Meeting (Budapest, 23 September
2004)
- By Mr. Michalis P. Adamantiadis, Regional Adviser
2Content
- Background (TOR-Tasks-Participation)
- Elaboration
- Objectives of the Meeting
- Review of the work
- Problems encountered
- Next steps
-
3Terms of Reference
- Objectives
- Consistent and realistic investment strategy for
the development of the rail and combined
transport infrastructures in the wider TER
Region, supporting - Promotion of TER Project goals
- Extension of TEN-T
- Development of Pan-European Transport Corridors
- Promotion of intermodality
- European transport integration
4Tasks
- Review of related TER work and European
initiatives, policies and studies (WP.1, 2) - Socioeconomic framework of concerned countries
and alternative scenarios of growth (WP.3) - Methodology and main assumptions (WP.4)
- Inventory of needs (WP.5)
- Elaboration of Master Plan (WP.6)
- Funding questions/financing arrangements (WP.7)
- Border crossing questions (WP.8)
- Conclusions/recommendations/dissemination(WP.9)
5Participation
6(No Transcript)
7Elaboration
- Organisation and management (WP 0)
- PCO Main responsible
- National Experts Consolidate national
information - Invited organizations Thematic support/guidance
- External consultants Technical/ scientific
assistance - TER Master Plan Expert Group
- PCO, National Experts, Organizations,
Consultants, UNECE - TEM and TER Master Plan Coordination Group
- PCOs, External Consultants, UNECE
8 Completed
Review of TER development (WP 1) Description of
work / tasks 1.1 Introduction of the TER
Project objectives and degree of their
attainment 1.2 Introduction of the TER
technical standards 1.3 Introduction of TER
network and plans 1.4 Introduction of the TER
GIS mapping and database 1.5 Introduction of
the TER Master Plan decisions Outputs
deliverables TER Projects background, objectives
and plans Time October 2003
9Completed (2)
- TER environment in Europe (WP 2)
- Description of work / tasks
- 2.1 Collection and review of relevant studies
and works - 2.2 Pan-European Transport Corridors (PETCs) and
TER - 2.3 Transport Infrastructure Needs Assessment
(TINA) and TER - 2.4 Trans European Transport Networks (TEN-T)
and the TER - 2.5 EU railway infrastructure package and its
impact in TER region - 2.6 TER role and perspectives in the
Pan-European context - Outputs deliverables
- TER environment in Europe
- Time November 2003
10Completed (3)
Socio-economic framework of the concerned
countries (WP 3) Description of work / tasks 31
Economic and social characteristics of concerned
countries 3.2 Alternative scenarios of
growth Outputs deliverables Socio-economic
status and scenarios of growth in the countries
of the TER wider region Time January 2004
11Completed (4)
Methodology (WP 4) Description of work /
tasks 4.1 Definition of bottlenecks, missing
links and other priority transport
infrastructure needs 4.2 Identification of
parameters and assumptions 4.3 Criteria of
priority infrastructure needs 4.4 Identifications
of data requirements Outputs deliverables
Methodology and main assumptions for the work
Time January 2004
12To be done (1)
Priority infrastructure needs in concerned
countries (WP 5) Description of work /
tasks 5.1 Collection of necessary information
5.2 Analysis and control of information
obtained 5.3 Review and update the TER Region
traffic forecasts 5.4 Establish alternative
scenarios for the TER Master Plan 5.5 Review
and prioritize proposed projects 5.6 Identify
interconnections between TER other network
components (Ports-IWW-SSS-CT) 5.7 Identify
possible connections and extensions of the TER
Network with neighboring regions Outputs
deliverables Inventory of priority infrastructure
needs and assessment of their costs Time May 2004
13To be done (2)
Elaboration of Master Plans (WP 6) Description
of work / tasks 6.1 Identification of the wider
TER Region Backbone Network 6.2 Elaboration of
the wider TER Region Master Plan and its
alternative implementation scenarios 6.3 GIS
presentation of the wider TER Region Master Plan
Outputs deliverables TER Master Plan and
GIS maps Time June 2004
14To be done (3)
Addressing funding questions (WP 7) Description
of work / tasks 7.1 Inventory of specific
projects for implementation 7.2 Estimate of
budget for the implementation 7.3 Possibilities
of stage construction 7.4 Technical and
institutional actions for implementation 7.5 Esti
mate of financial resources available
7.6 Perspectives to construct the wider TER
Region Backbone Network Outputs
deliverables 1. Inventory of specific priority
projects and costs 2. Definition of technical
and institutional actions required Time July
2004
15To be done (4)
Addressing border crossing questions (WP 8)
Description of work / tasks 8.1 Inventory of
border crossing problems on the wider TER Region
Backbone Network and improvement
recommendations Outputs deliverables 1.
Inventory of border crossing problems 2.
Recommendations for improvement Time July
2004
16To be done (5)
- Conclusions/Recommendations (WP 9)
- Description of work / tasks
- 9.1 Conclusions and recommendations
- 9.2 Results on the WEB pages
- 9.3 Publication of newsletter, brochures and
summary report - 9.4 Organization of workshops to present the
the results - Outputs deliverables
- Final Report
- Dissemination and Public awareness
- Follow-up preparation
- Time September 2004
17 Elaboration-Time table
18Objectives of the Meeting
- Review of the work
- Economic and social characteristics-WP 3.1
- Alternatives scenarios of growth-WP 3.2
- Analysis and evaluation of projects WP.5
- Additional data needs
- Follow-up actions
19Review of the work done
- 1st Coordination meeting, Budapest 16/9/03
- 2nd Coordination meeting, Warsaw 15/12/03
- 3rd Coordination meeting, Geneva 9/6/04
- 1st EGM Budapest, 10-11 February 2004
- 2nd EGM Budapest, 23 September 2004
- Completed WP 1, WP 2, WP 3, WP 4, WP 5 (part)
- TEM and TER Master Plans Website opened and
updated
20Review of work to be done
- Inventory of needs (WP.5)
- Elaboration of Master Plan (WP.6)
- Funding questions/financing arrangements (WP.7)
- Border crossing questions (WP.8)
- Conclusions/recommendations/dissemination(WP.9)
21Problems encountered
- Late submission of country inputs
- Not all countries provided inputs
- Missing data
- Delay in the elaboration
- Short time left for completion
22Next steps
- Cover missing data
- Complete the rest of the work, by October 2004
- Convene the 4th TEM and TER Master Plans
Coordination Meeting, Budapest, 25 October 2004 - Present the result to the next Steering
Committee - Decide upon the appropriate follow-up actions
- Implement the follow-up actions (starting in
2005)
23- FOR
- INTEGRATION AND DEVELOPMENT
- IN EUROPE