Title: High Rock Lake
1High Rock Lake
- Total Maximum Daily Loads
2Todays Agenda
- Introduction to Use-Support Methodologies and
High Rock Lake - TMDL Process
- Scoping Study
- Future Efforts
- Q A
Courtesy CWRC
3Basinwide Planning Program
Applies to All 17 River Basins
4Use Support Methodology
Based on Stream Classification
5Use Support Methodology
- Standards
- Chl a, pH, Dissolved Oxygen, etc.
Aquatic Life
- Standards Met Supporting
- Standards Not Met Impaired
- Inconclusive Data Not Rated
- No Data
6Current Data (2003 Basin plan)
7Current Data (2003 Basin plan)
8High Rock Lake Monitoring History
- 1974 1975 EPA DWQ determine nutrient
enrichment. - 1981 UNC-CH documents elevated nutrients and
chlorophylla concentrations - 1989 1990 DWQ intensive study
- 1992 1997 2002 DWQ basinwide sampling.
9Model History
- Early 1990s BATHTUB model
- Estimate nutrient loads
- Determine Assimilative capacity
- Develop predictive tool
- Good loading information
- Good Phosphorous Prediction
- Poor Chla prediction
- Not Sufficient for TMDL purposes
10Current Data (2003 Basin plan)
High rock map
11High Rock Lake Impairment
- Upper Lake
- Turbidity
- Low Dissolved Oxygen
- Chla
12High Rock Lake Impairment
13High Rock Lake Impairment
- Abbots Creek
- Turbidity
- Low Dissolved Oxygen
14High Rock Lake Impairment
- Second Creek
- Lake Arm NOT IMPAIRED
- Upstream is impaired aquatic life
15Everyone has an impact Everyone must be part of
the solution.
- Water quality management is a shared
responsibility.
16Basinwide Planning Program Website
http//h2o.enr.state.nc.us/basinwide/or
call919-733-5083