Transcript and Presenter's Notes

Title: Implementation and Monitoring:


1
Implementation andMonitoring
  • Assessing Performance in Contract Relationships

2
Characteristics Affecting Project Implementation
Less Problematic   1. Simple technical
features 2. Marginal change from status quo 3.
One-actor target 4. One-goal objective 5.
Clearly stated goals 6. Short duration
More Problematic   1. Complex technical
features 2. Comprehensive change from status
quo 3. Multi-actor targets 4. Multi-goal
objectives 5. Ambiguous or unclear goals 6.
Long duration
3
Project Identification, Formulation, Preparation
Design
  • A Project is an intervention that addresses a
    problem
  • Identifying the problem
  • Goal must be identified
  • What is the project to do?
  • What tasks will it perform?
  • What kind of institutional and organizational
    structure will allow it to accomplish goals?

4
Project Identification, Formulation, Preparation
Design
  • A project organization will carry out a variety
    of tasks
  • Must be constructed in light of those tasks and
    the environment in which they occur
  • For design teams to succeed, local beneficiaries
    must be involved at an early stage

5
Project Identification, Formulation, Preparation
Design
  • Problems in project identification
  • In developing countries
  • Lack effective procedures for project
    identification within national planning agencies
    and operating ministries
  • Weak conceptual and operational links exist
    between various national, regional, local, and
    special interest constituencies
  • National plans often fail to provide a strategy
    for development
  • Allocation of resource issues
  • Issues of priority

6
Project Identification, Formulation, Preparation
Design
  • Problems in project identification
  • In developing countries, cont.
  • Influence of interest groups
  • Limited international assistance agency staff
    time to help government planners
  • Excessive turnover and rotation of field
    representatives of assistance agencies
  • Weaknesses in the overall planning system

7
Project Budgeting
8
Project Budgeting Concepts
9
Budget Rate List
LABOR (Salary based on bio-data information for
either a 5-day or 6-day week)   International
Consultant 400/day Local Consultant 100/day   PE
R DIEM (Room, meals and expenses based on a
7-day week)   International Consultant 100/day Pa
rticipants 54/day   TRAVEL (Could include car
rental and in-country/regional airfares/train
fares)   Business Round Trip New
York-Eritrea 3,000/person   MISC. DIRECT COSTS
(Should include some basic items together with
activity-dependent items)   Fax/Telephone 50/day
Report Production/Photocopying 40/day Teaching
A/V Materials 20/day Computer
Rental 100/day DBA/SOS (insurance-intl.
consultant) 82/day
10
Summary Budget Example
  • Eritrean Community Rehabilitation Fund (ECRF)
  • Budget Summary
  • Consult weekly notes for example

11
Budget Example
ERITREAN COMMUNITY REHABILITATION FUND Budget for
Program Support for Capacity Building Strategy 1
Overall design and organization development for
the expanded fund
TOTAL COST US 713,625.00 Strategy 1.1
Workshop/Retreat 100 participants _at_ US225 per
diem 1.5 days 33,750.00 Strategy 1.2 Training
Needs Assessment a.- 100 participants _at_ US225
per diem 14 Days 315,000.00 b. Contracting of a
consultant team for methodology and facilitating
purposes 34,875.00 Strategy 1.3 Research
Funds Employment of a Consultant _at_ US 64.000 a
year for 3 years. 192,000.00 Strategy 1.4
Preparation of Handbook Contract with
publisher 10,000.00 Strategy 1.5
Assessment Employment of a Consultant _at_ US
64.000 a year two Assessment periods (middle
second year to end) 128,000.00 TOTAL STRATEGY
1 713,625.00
12
Budget Example
ERITREAN COMMUNITY REHABILITATION FUND Budget for
Program Support for Capacity Building Strategy 3
To strengthen local government officers to
support Fund outreach, implementation and
monitoring activities.
TOTAL COST US 642,400.00 Strategy 3.1 Promotion
and Outreach Seminar 20 particip _at_ US225 per
diem 4 days, 4 years (times) 72,000.00 Seminar
expenses (consultant contract) 20,000.00 Strateg
y 3.2 Training of Trainers National 100
participants _at_ US 40 per diem 14 days for 4
years. (10 participants per region)
224,000.00 Regional 120 participants per
activity, 8 activities, 14 days 20 per person.
(60 participants per region) 268,800.00 Strategy
3.3 Promotion and Training of Trainers. Contract
with publisher 57,600.00 TOTAL STRATEGY
1 642,400.00
13
Budget Category Allocations
   
14
Project Execution/Implementation
15
Project Execution and Implementation
  • POLICY COMMITTEE
  • Minister of Health (MOH)
  • Permanent Secretary
  • MOH Senior Mgmt.

dissemination of technical results and
presentation of proposals
PMU
supervision, control and evaluation of project
activities
policy direction
policy direction
Consulting firm (long and short-run consultants)
  • Lead counterparts
  • Functional units of MOH
  • GPH administration

project activities
16
Project ExecutionScheduling and Charting
  • Following steps should be observed in developing
    a chart for a project
  • Level of Detaildecide what amount of detail
    should be displayed.
  • Sequencedetermine in what logical sequence the
    various activities will be carried out.
  • Durationestimate how long each activity will
    take.

17
Project ExecutionMonitoring and Reporting
  • Defined as
  • Providing right people with the right information
    at the right time
  • Monitoring
  • conducting of a periodic review of status of
    project activities in order to predict if
    scheduled events are going to be achieved
  • Reporting
  • notifying members of project team and
    higher-level supervisors about status of project
    activities and events to allow them to perform
    their responsibilities

18
Project ExecutionResource Allocation
  • Principle resources available
  • People, money, materials, machinery, time

19
Project Execution
  • Resource Needs Chart (RNC)

20
Project Monitoring
21
Project Monitoring
  • Important to distinguish from evaluation studies
  • Monitoring involves collection of information
    about project while it is in progress
  • Emphasis on continual feedback on resources used
    and how implementation is being conducted

22
Project Monitoring
  • Storytelling or Process Documentation
  • Informal monitoring process
  • Use of anecdotes or personal accounts
  • Describe actual problems and conflicts that occur
    and anxieties that people face
  • Production of monthly reports that tell the
    story of what has been occurring
  • Does not tell much about immediate results of a
    single project

23
Project Monitoring
  • Multiple Indicators
  • Indicators need to be valid (measure what you
    want) and reliable (same results under different
    tests)
  • Multiple indicators correct for validity or
    reliability problems that single measures may have

24
Project Monitoring
  • Multiple Indicators (examples)
  • Credit
  • increase in field staff
  • number of rural banks established
  • number and value of import and distribution loans
  • number of loan applications received, processed,
    approved

25
Project Monitoring
  • Multiple Indicators (examples)
  • Land Reform
  • number of titles registered
  • percentage of farmers on their own land
  • necessary legislation passed
  • average size of landholding
  • number of hectares aerially photographed

26
Project Monitoring
  • Multiple Indicators (examples)
  • Institutional Capacity
  • time in existence
  • professional status recognized
  • technical comptence proved
  • survival capacity demonstrated
  • ability to attract financial resources shown
  • capacity to innovate demonstrated
  • linkages established with community groups
  • services being used in community

27
Exception Report Format
28
Achievement Report Format
29
Implementation Responsibility Chart
30
Implementation Diagnosis Worksheet
31
Instruments of Monitoring andEvaluation for
Results
32
Benefits of MEDuring Project Execution
  • Identify/correct project flaws in design and
    plans
  • Increase likelihood of outputs as planned
  • Identify new and recurrent problems
  • Generate discussion and solutions
  • Focus actions on key problems

33
ME During Project Execution
M E Plan
PHYSICAL EXECUTIONPLANS (PEP)
LOGFRAMES
Design
FINANCIAL EXECUTIONPLANS (FEP)
Purpose
Execution
Evaluation
MONITORING EVALUATION REPORTS
PERIODIC MID-TERM EVALUATIONS
34
The Logical Framework
35
Example of Project Objectives
  • GOAL
  • Illnesses caused by impure drinking water
    reduced.
  • PURPOSE
  • Hygienic practices adopted by the rural
    population.
  • OUTPUTS
  • Clean water provided to 60 of villages in
    Northwest Region.
  • Health workers trained.
  • ACTIVITIES

36
Example of Project Objectives
  • ACTIVITIES
  • 1.1. Choose sites for wells.
  • 1.2. Organize village workers
  • 2.1. Develop curriculum.
  • 2.2. Recruit health workers.
  • 2.3. Conduct training.

37
The Logical Framework
38
Horizontal Logic of the Logframe
39
The Means of Verification
Objectives
Observable Verifiable Indicators
Means of Verification (MOV)
Hierarchy of Objectives
Indicators
Sources of information
Method for data collection
Agency responsible for data collection, analysis,
and dissemination (information producer)
Method for analysis of data
Frequency
Application (expected uses)
Reporting format (letter, written report, oral
presentation, etc.)
Circulation (expected information users)
40
Logical Framework and ME
  • Continuing rationale
  • Efficiency
  • Effectiveness
  • Effects and impacts
  • Lessons learned

41
Physical Execution Plan
  • Components and indicators
  • Activities and tasks
  • Time
  • Responsibility (for execution)

42
Physical Execution Plan
Component/Activities/Tasks
Time
Product
Responsibility
1. Component a. Activity b. Activity c.
Activity 2. Component a. b. c...
7 units 3 units
ConstructionUnit TechnicalSupport Unit
43
Financial Execution Plan
  • Line-item budgets
  • Activity budgets

44
Activity Budget
45
Monitoring Reports
  • Routine
  • Special
  • Alerts

46
Routine Monitoring Reports
  • Example Budget reports
  • Procedure Some standardized procedures

47
Special Monitoring Reports
  • Example Bottleneck identification
  • Procedure Troubleshooting

48
Alerts
  • Example Benefits/Costs
  • Procedure Cost overruns

49
Evaluation Reports
  • Periodic review
  • Mid-term evaluation
  • Management (PPMR)
  • Final evaluation