Title: Building Work Committee
1Mason School District
Building Work Committee Renovation
Expansion Project Presentation March 7, 2009
2THE TEAM
3Mason School DistrictBuilding Committee Mary
McDonald Bob Bergeron Fred Greenwood Bob
Hemmer Bernie OGrady The Jordon
InstituteEnergy Consultants Paul Levelle Kirk
Stone
Daniel V Scully Architects Daniel Scully Katie
Cassidy Sutherland The Jordon InstituteConstruct
ion Managers John Gaston David Bryson Other Key
Contributors Mark Richardson George Catherine
Schwenk, The Mason Congregational Church NH DOE
lots of on-lookers!
4TODAYS OBJECTIVES
5- To Provide Information
- How We Got Here Needs Assessment Design
Themes - What it looks like Building Plans Overview
- Estimated Cost
- Schedule
- To Answer Questions
- Your thoughts, questions, ideas overall
Feedback - Prepare for March 12th Vote
6How We Got Here Withdrawal from Mascenic School
District Creation of Mason School District Create
Curriculum Build a Staff Find a "Home" for
students What We Considered Building a New
School for K thru 12 Build a New Building for K
thru 5 Utilize Existing Buildings for K thru
5 Add on to Existing Building for K thru 5
7Proposed Site Modification
Town Hall Existing School Parsonage
Old Road School Lot Line Adjustment Relocation of
Parsonage Lot
8REQUIRED Life SafetyADA AccessFire
EgressNH Dept. of EducationStructural Repair
Fire Detection UpgradeBuilding Code Upgrade
9REQUIRED Minimum SpaceNH Dept. of
EducationBuilding Code
10REQUIRED KindergartenNH State Mandate
11REQUIRED 5th GradePossible Due to Expansion of
ExistingSpace to Required Minimum
12REQUIRED Administration SpaceREQUIRED
CafeteriaPrincipalSuperintendentStaff
RoofConference RoomCafeteriaKitchen
13REQUIRED Physical Ed
14Computer /ArtExpansionUtilized forComputer /
MediaRoom and Art RoomIf Population Bubble
OccursIt Can Be Utilized As A Larger Grade
Classroom
15School / TownShared SpaceExpanded Space Can Be
UtilizedFor School Music SpaceShared With The
Town It CanBe Utilized AS A Meeting Space,
Function Hall, Etc.
16Proposed Floor Plan
17Proposed Ariel Top View
18Proposed Front Elevation
19Proposed Birdseye Front
20Proposed Birdseye Back
21Schedule Outline
Mason School District Bond Appropriation March
12, 2009 Lot line Site finalization -
Parsonage relocated June 2009 Ground Breaks for
Addition July 2009 School Starts Classrooms
Mechanical Room Complete Admin SPED in
Temps August 2009 Addition Complete June
2010 Renovation of Administration Building
Connection August 2010 Temporary Classrooms
removed August 2010 Building Project
Completed September 2010 High Performance
Certification December 2010 / January 2011
22BUDGET
23Estimated Cost Potential Aid
Architectural / Engineering Design
577,109Site / Construction 3,886,425Total
Bond Appropriation 4,274,534 TOTAL DOES
NOT DEDUCT NH AID (30) TOTAL DOES NOT DEDCUCT
GRANT PROPOSALS TOTAL DOES NOT DEDUCT ECONOMIC
STIMULUS OPPORTUNITIES (Possibly as high as 5)
24How Will This Effect My Taxes
25What Your Vote Will Do
- YES
- Will have the project proceed as presented.
- (The action that the Building Committee Endorses)
- NO
- Will stop all present projects.
- Require us to resubmit a plan to the NH Dept. of
Ed. - If plan does not meet their approval, they take
over the process. - Possible closing of school and require us to
tuition K thru 5. - Loss of NH State funding possible.
- Loss of Federal Funding.
- Present debt due to Mascenic due in full this
year. - Tax impact will be significantly higher.
- Cost of sending our children to school may be
significantly higher. - (This action is NOT endorsed by the Building
Committee)
26QUESTIONS DISCUSSIONS