Unit Refreshes - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

Unit Refreshes

Description:

Corridor Floor: Asbestos Abatement; Replace Carpet with VCT Tile. U35/36 Scope Includes: ... Wall Covering; Paint; Install Wall Protection (42' from the Floor) ... – PowerPoint PPT presentation

Number of Views:49
Avg rating:3.0/5.0
Slides: 21
Provided by: GBMC8
Category:

less

Transcript and Presenter's Notes

Title: Unit Refreshes


1
Unit Refreshes
  • U35 U36 U38 U58

2
U35/36
3
U35/36 Scope Includes
  • Corridor Floor Asbestos Abatement Replace
    Carpet with VCT Tile

4
U35/36 Scope Includes
  • Corridor Walls Remove Wall Covering Paint
    Install Wall Protection from the Floor to the
    Handrail Existing Wood Base/Handrails to Remain
    Alcoves with Fabric Wall Covering to Remain

5
U35/36 Scope Includes
  • Patient Rooms Remove Wall Covering Paint
    Install Wall Protection (42 from the Floor)

6
U35/36 Scope Includes
  • Nurses Break Room Asbestos Abatement VCT Tile,
    Paint

7
U35/36 Scope Includes
  • Miscellaneous Replace All Hand Washing Sinks,
    Existing Avagard Holders, Sani-Wipe Holders,
    Isolation Boxes to Remain

8
U38
9
U38 Scope Includes
  • Corridor Floor Replace Carpet with VCT Tile

10
U38 Scope Includes
  • Corridor Walls Remove Wall Covering Paint
    Install Wall Protection from the Floor to the
    Handrail Existing Wood Base/Handrails to Remain
    Alcoves with Fabric Wall Covering to Remain

11
U38 Scope Includes
  • Patient Rooms Patch and Paint Wall Protection,
    Re-hang existing wall fixtures (COMPLETED JUNE
    2008)

12
U38 Scope Includes
  • Miscellaneous TV Replacements, Over Bed Tables,
    Bedside Cabinets, Patient Highback Chair, Visitor
    Chair, Patient Recliner, Ice Machine,
    Refrigerator, Repair Med Cabinets, SPO2 Monitoring

13
U58
14
U58 Scope Includes
  • Corridor Floor Replace Carpet with VCT Tile

15
U58 Scope Includes
  • Corridor Walls Remove Wall Covering Paint
    Install Wall Protection from the Floor to the
    Handrail Existing Wood Base/Handrails to Remain

16
U58 Scope Includes
  • Patient Rooms Patch and Paint, Wall Protection

17
U58 Scope Includes
  • Miscellaneous TV Replacements, Bed Replacements,
    Over Bed Tables, Bedside Cabinets, Visitor Chair,
    Patient Recliner, RN Call System, Ice Machine,
    Refrigerator, Repair Med Cabinets

18
U36 Schedule
  • U36 (Duration 4 weeks)
  • 6/22 6/28 close back 4 pods for room
    renovations
  • 6/29 Open back 4 pods and close the front 4 pods
  • 7/6 7/20 Close entire unit
  • 7/20 Unit re-opens

19
U35 Schedule
  • U35 (Duration 4 weeks)
  • 6/20 - 7/26 Close back 4 pods for room
    renovations
  • 7/27- 8/2 Open back 4 pods and close the front 4
    pods
  • 8/3 8/16 Close entire unit
  • 8/17 Unit re-opens

20
U38/58 Schedule
  • U38/58 (Duration 8 weeks)
  • 8/17 9/20 Close 6 rooms on each unit for 1
    week (6 weeks total)
  • 9/20 10/5 Close nurses station (2 weeks
    total)
Write a Comment
User Comments (0)
About PowerShow.com