Title: ACP WG B Work Program
1ACP WG BWork Program
- Frequency Planning Criteria
- VDL Mode 2
- VDL Mode 3
- VDL Mode 4
- VDL Mode 4 Global Signaling Channel
- On-board aircraft compatibility
2Papers for WG B18TH Meeting, 17-25 February
2005Bangkok, Thailand
- Working Paper 9, Report of VDL Mode 3 Voice
Quality Tests With Radio Interference, by
Yasuyoshi Nakatani, Japan
3VDL Frequency Planning
- WGB/17 completed the frequency assignment
planning material, including relevant guidance
material, for VHF digital link (VDL) Modes 2 - VDL Mode 3 could operate on the fourth adjacent
25 kHz channel from a DSB-AM assignment and on
the second adjacent 25 kHz channel from a VDL
Mode 3 assignment. - Test planning for VDL Mode 4, including the need
for an assignment in the 112-117.975 MHz band is
on-going. - Excerpt From ACP-Memo/02, 14/01/05, from ACP
Secretary to Members, Aeronautical Communications
Panel (ACP)
4Summary VDL Mode 2 Frequency Planning Criteria1
- Number of Channels for no planning
- Note
- 1. WGB16/WP14 Appendix (after Tokyo) from
AMCP/8-WP/66 5J-20 Appendix J to the Report on
Agenda Item 5.
5Summary VDL Mode 3 Frequency Planning
Criteria1Number of Channels for no planning
- Notes
- 1. WP-WGB17 Document 08, 17th Meeting of
Aeronautical Communications Panel Working Group B
(ACP WG-B) Montreal, Canada, 20 to 25 October
2004 and 26 to 28 October 2004, VDL Mode 3 to VDL
Mode 3 Avionics Interference Testing, Agenda Item
4 VDL frequency assignment planning criteria
for VDL Mode 3, Presented by the United States of
America. - 2. ACP-Memo/02, 14/01/05, Ref SP 62/2, To
Members, Aeronautical Communications Panel (ACP),
From ACP Secretary, Progress of Aeronautical
Communications Panel (ACP) Subject, To note and
provide comments by 15 February 2005.
6Status Frequency Planning CriteriaVDL Mode 4
- Test Plan Presented to WG B
- Testing according to the test plan is planned for
early next year. - Reference ACP (WG B), 17th Meeting, 20 25th of
October 2004, Montreal, Canada Signalling
Channels for VDL Mode 4, F. Lindblom, Swedish
CAA, Sweden
7VDL Band implementation target planagreed by the
EANPG FMG.
Reference ACP (WG B), 17th Meeting, 20 25th of
October 2004, Montreal, Canada Signalling
Channels for VDL Mode 4, F. Lindblom, Swedish
CAA, Sweden
8Future Work
- Further work was needed to complete the the work
on Frequency Planning Criteria. - VDL Mode 3 to VDL Mode 2
- VDL Mode 4 to VDL Mode 2
- Guidance material on 8.33 kHz and 50 kHz radios.
- There are currently no plans to provide further
guidance material on 50 kHz radios, unless
required. - Note 1. Report of the 17th Meeting of
Aeronautical Communications Panel (ACP) - Working Group B, 20 to 25 October, 2004,
Montreal, Canada - VDL Mode 4 Global Signaling Channel
- On-board aircraft EMC is ongoing