ACP WG B Work Program - PowerPoint PPT Presentation

1 / 8
About This Presentation
Title:

ACP WG B Work Program

Description:

WGB/17 completed the frequency assignment planning material, including relevant ... VDL Mode 4 Global Signaling Channel. On-board aircraft EMC is ongoing ... – PowerPoint PPT presentation

Number of Views:41
Avg rating:3.0/5.0
Slides: 9
Provided by: asr1
Category:
Tags: acp | emc | program | work

less

Transcript and Presenter's Notes

Title: ACP WG B Work Program


1
ACP WG BWork Program
  • Frequency Planning Criteria
  • VDL Mode 2
  • VDL Mode 3
  • VDL Mode 4
  • VDL Mode 4 Global Signaling Channel
  • On-board aircraft compatibility

2
Papers for WG B18TH Meeting, 17-25 February
2005Bangkok, Thailand
  • Working Paper 9, Report of VDL Mode 3 Voice
    Quality Tests With Radio Interference, by
    Yasuyoshi Nakatani, Japan

3
VDL Frequency Planning
  • WGB/17 completed the frequency assignment
    planning material, including relevant guidance
    material, for VHF digital link (VDL) Modes 2
  • VDL Mode 3 could operate on the fourth adjacent
    25 kHz channel from a DSB-AM assignment and on
    the second adjacent 25 kHz channel from a VDL
    Mode 3 assignment.
  • Test planning for VDL Mode 4, including the need
    for an assignment in the 112-117.975 MHz band is
    on-going.
  • Excerpt From ACP-Memo/02, 14/01/05, from ACP
    Secretary to Members, Aeronautical Communications
    Panel (ACP)

4
Summary VDL Mode 2 Frequency Planning Criteria1
  • Number of Channels for no planning
  • Note
  • 1. WGB16/WP14 Appendix (after Tokyo) from
    AMCP/8-WP/66 5J-20 Appendix J to the Report on
    Agenda Item 5.

5
Summary VDL Mode 3 Frequency Planning
Criteria1Number of Channels for no planning
  • Notes
  • 1. WP-WGB17 Document 08, 17th Meeting of
    Aeronautical Communications Panel Working Group B
    (ACP WG-B) Montreal, Canada, 20 to 25 October
    2004 and 26 to 28 October 2004, VDL Mode 3 to VDL
    Mode 3 Avionics Interference Testing, Agenda Item
    4 VDL frequency assignment planning criteria
    for VDL Mode 3, Presented by the United States of
    America.
  •  2. ACP-Memo/02, 14/01/05, Ref SP 62/2, To
    Members, Aeronautical Communications Panel (ACP),
    From ACP Secretary, Progress of Aeronautical
    Communications Panel (ACP) Subject, To note and
    provide comments by 15 February 2005.

6
Status Frequency Planning CriteriaVDL Mode 4
  • Test Plan Presented to WG B
  • Testing according to the test plan is planned for
    early next year.
  • Reference ACP (WG B), 17th Meeting, 20 25th of
    October 2004, Montreal, Canada Signalling
    Channels for VDL Mode 4, F. Lindblom, Swedish
    CAA, Sweden

7
VDL Band implementation target planagreed by the
EANPG FMG.
Reference ACP (WG B), 17th Meeting, 20 25th of
October 2004, Montreal, Canada Signalling
Channels for VDL Mode 4, F. Lindblom, Swedish
CAA, Sweden
8
Future Work
  • Further work was needed to complete the the work
    on Frequency Planning Criteria.
  • VDL Mode 3 to VDL Mode 2
  • VDL Mode 4 to VDL Mode 2
  • Guidance material on 8.33 kHz and 50 kHz radios.
  • There are currently no plans to provide further
    guidance material on 50 kHz radios, unless
    required.
  • Note 1. Report of the 17th Meeting of
    Aeronautical Communications Panel (ACP)
  • Working Group B, 20 to 25 October, 2004,
    Montreal, Canada
  • VDL Mode 4 Global Signaling Channel
  • On-board aircraft EMC is ongoing
Write a Comment
User Comments (0)
About PowerShow.com