Title: PROJECT PLANNING


1
PROJECT PLANNING
CHAPTER - 6
2
WEB BASED PROJECT MANAGEMENT
  • The Need (1-2 of project cost on paperwork to
    support information transfer)
  • The Technology
  • Web-based project management application

3
INTRODUCTION
  • Scope of Work
  • Work elements of building blocks
  • Sub Elements referred to as work packages
  • Summation of work packages in a hierarchical
    format is called work breakdown structure (WBS)
  • Project Planning Work Breakdown Work
    Sequencing

4
Figure 6-1 Work Breakdown Structure (WBS) Example
5
Figure 6-2 The Planning/Management Cycle
6
DEVELOPING the WBS
  • Building blocks of WBS
  • The progressive hierarchical breakdown of the
    project
  • Guidelines to establish WBS
  • Must be distinguishable
  • Must have unique starting and ending plans
  • Should have unique budget
  • Should be small enough that precise measurement
    of progress is possible

7
A WORK BREAKDOWN EXAMPLE
  • Gas Station Appendix 1
  • In construction, various aspects contribute to
    breakdown into packages
  • Methods used to place the work
  • Skills needed for the work
  • Craft workers involved
  • Critical resources (cranes, crews, etc.)
  • Work packages can be facilitated by four
    categories to help for level of uniqueness
  • Location or area within project (foundation-pile
    cap)
  • Material type (concrete, resteel, etc.)
  • Method of placement (excavation)
  • Organizational resources required (labor and
    equipment needed)

8
Figure 6-3 WBS for Gas Station Project
9
WORK PACKAGES for the GAS STATION PROJECT
  • Location work packages
  • Material type expands the number of work pakages

10
DETERMING THE SEQUENCE of WORK PACKAGES
  • Activity used in scheduling to the work
    elements
  • Logic is a key to successful project management
  • Physical constraint of physical logic in
    construction operation 1st floor framing before
    2nd floor framing
  • Management logic bathroom fixtures before floor
    tile or vice versa
  • Preliminary sequencing provide the framework
    for development schedule
  • Closed-In
  • Consideration must be given to other time
    consuming activities
  • Administration actions inspections, permits,
    etc.
  • Delivery of materials
  • Finally, certain special activities curing, etc.

11
Figure 6-4 Preliminary Project Breakdown
12
Figure 6-5 Cost Control Cycle
13
Figure 6-6 Work Package Control Account Sheet
14
ESTIMATE DEVELOPMENT and COST CONTROL RELATED TO
THE WBS
  • A good WBS facilitates cost control during the
    project life
  • Cost accounts or control accounts
  • If the bid is accepted, which serves as a cost
    baseline
  • The bid estimate is converted to a budget
  • Code of accounts is used as a template or guide
    for large projects

15
SUMMARY
  • Construction project planning focuses heavily on
    time and cost control
  • Deviations from the original plan are the norm
  • It has been noted
  • In order to Manage, one should be able to Control
  • In order to Control, one should be able to
    Measure
  • In order to Measure, one should be able to Define
  • In order to Define, one should be able to
    Quantify
  • WBS provides a rigorous way to quantify, define,
    measure and control the elements or work packages
  • Breaking a construction package into work
    elements to managed is essential for time cost
    planning
  • In addition to time cost planning, other
    planning efforts are needed when constructing a
    facility
  • The following is a partial list of other plans
  • Procurement plan
  • Safety plan
  • Subcontracting plan
  • Quality plan
  • Communication plan
  • Organizational plan
  • Startup and Completion plan
  • Planning is a never ending task