Title: Open AMI Network


1
Open AMI Network
  • 10/22/08

2
Standards Overview
AMI-SEC
Utility Systems
Data Collection Systems
Meter-Specific Networks
MDM System
Wide Area Networks
HAN
Network Operations 61968-3
OMS 61968-3
MDM Or MDUS 61968-9
Data Collection 61968-9
Planning Scheduling 61968-5
GIS 61968-4
Open HAN 1.0
Control Configuration 61968-9
MDM 61968-9
AMI Network ???
WMS 61968-6
Load Mgmt. 61968-9
Load Control 61968-9
MDUS 61968-9
Meter Data Comm. C12.19 C12.22
Meter Maintenance 61968-9
CIS 61968-8
AMI-SEC
3
Consumers Energys Service Territory
  • 1.8 Million Electric Meters
  • 1.6 Million Gas Meters
  • 1 Million gas meters in non Consumers Energys
    service territory

4
AMI Observations
  • Differences between systems
  • Proprietary Communication Technology
  • System logging and auditing
  • Device registration device dependant
  • Collector
  • Meter
  • Substation metering
  • Other (smart grid devices, etc)
  • Network management interfaces
  • Outage reporting
  • Troubleshooting
  • Monitoring performance
  • System configuration and upgrades

5
AMI Observations (Cont.)
  • AMI communication vendors are not interoperable
    for maintenance and management
  • Meter
  • Collector/Access Point/Mesh Gate/Take out
    point/Cell Relay/Tower Gateway Base Station/ Base
    Station
  • HAN ESP interface managed and implemented
    different between vendors

6
AMI-Network TF Proposal
  • Define the devices and well defined points of
    interoperability within the AMI network for
    maintenance
  • Define the benefits of interoperability between
    AMI network maintenance components to utilities
  • Sharing backhauls
  • Gas AMR meters
  • Water AMR meters
  • Hybrid AMI systems
  • Point to Point and mesh and PLC

7
Proposed TF Scope
  • Evaluate existing Maintenance Use Cases
  • Define New Maintenance Use Cases
  • Define System Functional Requirements for AMI
    meters to the AMI head end for maintenance/lifecyc
    le purposes
  • Identify areas within an AMI network that are
    viable for maintenance interoperability
  • Scope is outside of OpenHAN and the
    Zigbee/Homeplug efforts
  • Input from the Group???

8
Evaluate Existing Use Cases
  • SCE use cases
  • S1 AMI system recovers after power outage,
    communications or equipment failure
  • U1 Utility installs, provisions and configures
    AMI system
  • U2 Utility manages end-to-end life-cycle of the
    meter system
  • U3 Utility upgrades AMI system to address future
    requirements
  • Other Utility use cases
  • AMI Vendor use cases

9
Define New Use Cases
  • Focus on maintenance life cycle related
    activities for the meter thru the head end system
  • Avoid HAN use cases with the exception of the AMI
    Communication interface with the ESP
  • IP/3rd party gateways

10
Functional Requirements
  • Create a SRS (system requirements specification)
    similar to OpenHANs efforts
  • Derive requirements from the use case review
  • Focus on the AMI head end to the meter from a
    network maintenance perspective
  • Input from the group???

11
Schedule
  • Meet via teleconference every 3 weeks
  • Meet at every UCA face to face meeting

Questions/Comments?
Next Steps?