FFSP0004 1108 - PowerPoint PPT Presentation

1 / 7
About This Presentation
Title:

FFSP0004 1108

Description:

Secondary Containment Provision of Energy Policy Act requiring ... Proven EBW spill containment cover and plow ring. Durable double layer HDPE gravel guard ... – PowerPoint PPT presentation

Number of Views:46
Avg rating:3.0/5.0
Slides: 8
Provided by: nee14
Category:
Tags: ffsp0004 | gravel

less

Transcript and Presenter's Notes

Title: FFSP0004 1108


1
FFSP-0004 11-08
2
Why 15 Gallon Field Replaceable Testable Spill
Containment?
  • Secondary Containment Provision of Energy Policy
    Act requiring integrity testing of spill
    containments
  • Additional spill capacity
  • Field replaceable without breaking concrete
  • Integrity testing can be conducted via
    hydrostatic or vacuum.

3
  • Rugged Design
  • Proven EBW spill containment cover and plow ring
  • Durable double layer HDPE gravel guard
  • 3/8 diamond plate primary spill containment plow
    ring
  • Drain is field replaceable and factory tested to
    pass CARB drain valve leak rate requirements

DRAIN
4
  • Testing
  • 1 test riser facilitates vacuum testing
  • Connected to interstitial space between primary
    and secondary containment
  • Standard dipstick can also be used for visual
    monitoring

5
  • Drop Tube Seal
  • Drop tube can be installed through riser of spill
    containment below or above the drain valve path

6
Field Replacement Made Easy
  • Replace primary and secondary containment at the
    same time to ensure interstitial integrity
  • Spill containment and riser removal tool designed
    to work with existing Phil-Tite T-handle removal
    tool

Complete Secondary Contained Spill Containment
Assembly
Replacement Spill Containment AssemblyPrimary
and Secondary Containment
Spill Containment Removal Tool
Riser Removal Tool
Phil-Tite T-handle Tool
7
FFSP-0004 11-08
Write a Comment
User Comments (0)
About PowerShow.com