SQTF Issues - PowerPoint PPT Presentation

1 / 5
About This Presentation
Title:

SQTF Issues

Description:

http://www.ge.infn.it/ATLAS/SQTF/StaveProduction/SummaryAll.xls. Ranked ... 2 downgraded to System Test. SQTF _at_ RPDSG. C. Darbo INFN / Genova. RPDSG, 21/03/2006 ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 6
Provided by: Giovann74
Category:

less

Transcript and Presenter's Notes

Title: SQTF Issues


1
SQTF Issues
  • G. Darbo - INFN / Genova
  • Related documents
  • Loaded Stave summaryhttp//www.ge.infn.it/ATLAS/
    SQTF/StaveProduction/SummaryAll.xls
  • Ranked Loaded Staveshttp//www.ge.infn.it/ATLAS/
    SQTF/StaveProduction/LoadedStaveRanking.xls

2
Loaded Staves
  • 15 staves with new pipe loaded
  • CPPM 7
  • Genova 5
  • Wuppertal 1
  • Ready at CERN 10
  • 43 Staves with old pipe loaded
  • 28 ranked and usable for L1/L2
  • 9 not yet ranked completely
  • 3 down-graded to spares
  • 2 downgraded to System Test

3
Loaded Staves
  • Production restarted in January, rate similar to
    the the maximum obtained before shut down.
  • Limited by availability of bare staves.
  • Peak rate demonstrate feasibility of two staves /
    week in Genova and Marseilles

4
Loaded Staves
5
Loading Issues
  • Loading is slow down due to missing bare staves,
    which is turn due to missing pipes.
  • Genova and Marseille are heating up the loading
    activities. Wuppertal is still behind one
    stave/week, need to be monitored when more staves
    will be available.
  • Module inventory is needed together with load
    planning, German module sites have still too many
    modules that could be probably needed by
    Wuppertal -gt they have to be shipped to
    Genova/CPPM.
  • Stave repair is going on at a rate of 6/week,
    torsion for last 4 staves is below the 0.5 limit.
    Tomorrow last set of pipes will be over.
  • New staves from IVW are late, not seen yet the
    first production batch!
  • Pipe insertion yield could be low (1 stave lost
    1 stave with major damage on two modules out of 5
    reworked staves). Can be made it safer?
Write a Comment