PBBTE Requirements - PowerPoint PPT Presentation

About This Presentation
Title:

PBBTE Requirements

Description:

... incorrectly provisioned for bridging. Switch H has been incorrectly ... BVID10 incorrectly provisioned for bridging. Frame enters the red transport at I. ... – PowerPoint PPT presentation

Number of Views:56
Avg rating:3.0/5.0
Slides: 10
Provided by: robert909
Learn more at: https://www.ieee802.org
Category:

less

Transcript and Presenter's Notes

Title: PBBTE Requirements


1
PBB-TE Requirements
22.January 2007
  • bsultan_at_huawei.com
  • ldunbar_at_huawei.com

2
Problem Simple partition of BVID space
Non-sequential PBB BVID assignments
BVID assignments for simply partitioned PBB/PBB-TE
  • Assume
  • BVIDs not assigned sequentially for PBB
  • PBB-TE allows only simple partition of BVID
    space
  • BVID lt N ? PBB
  • BVID N ? PBB-TE
  • Observe
  • Migration requires reassignment of many PBB BVIDs

PBB-TE 2000
PBB lt 2000
3
Remedy Distinct assignment per BVID
Non-sequential PBB BVID assignments
Non-disruptively adding PBB-TE BVID assignments
  • Conclusions
  • Simple partition of BVID space is insufficient
  • Individual assignment of BVIDs is needed
  • Statement of requirement
  • The introduction of TE in a PBBN should not
    require reassignment of BVID values currently
    used for PBB traffic.
  • It is an option to allow a simple partition of
    the space when PBB reassignment is not a concern.

4
Option to eliminate need to partition BVID space
PBB BVID assignments
PBB-TE BVID assignments
  • Distinguish PBB vs. PBB-TE traffic by Ethertype
  • or other convenient marking.
  • guarantee that PBB forwarding cannot interfere
    with PBB-TE forwarding
  • greatly simplifies PBB / PBB-TE BVID assignment
  • Understood that BCB (PB) need additional function
    to interpret both Ethertypes.
  • Considering that PBB-TE requires all BCB(PB)
    nodes to change forwarding behavior anyway, it is
    not too much additional function.

5
Problem PBB traffic interferes with PBB-TE
traffic
  • PBB-TE is provisioned along path and policed at
    ingress edge (no problem)
  • PBB paths are not provisioned
  • Difficult to know appropriate rate for edge
    policing
  • Must give PBB-TE traffic absolute priority over
    PBB traffic
  • Not possible if PBB already using highest
    priority value
  • Distinct PRI spaces provides natural solution
  • PBB and PBB-TE can each use full set of priority
    values
  • PBB-TE always granted absolute priority over PBB

PBB-TE (red) traffic granted absolute priority
over PBB (blue) traffic.
6
Requirements
  • Base is to allow any BVID to be assigned PBB or
    PBB-TE
  • Option is to allow a partition between PBB and
    PBB-TE BVIDs.
  • Option for differential treatment (e.g., by
    Ethertype) of PBB and PBB-TE
  • Avoid BVID and/or PRI reassignment on migration
  • Ethertype is reasonable way to provide this
    option

7
Additional benefit of using EtherType to
differentiate PBB-TE traffic and PBB traff
8
Provisioning Error at Switch H
E
Backbone Edge Bridge (BEB) IEEE 802.1ah
B
4
Backbone Core Bridge (BEB) IEEE 802.1ad
A
F
G
Backbone Spanning Tree
Red transport traffic (on backbone VID 10)
Blue transport traffic (on backbone VID 10)
3
2
H
I
Red transport not provisioned (by error)
1
BVID10 correctly provisioned for transport
BVID10 incorrectly provisioned for bridging
  • Switch H has been incorrectly provisioned so that
  • backbone VLAN ID (BVID) 10 is associated with
    bridging instead of transport
  • provisioning of the red transport has been
    omitted.

9
Impact of PBT Configuration Error
  • Frame enters the red transport at I.
  • Frame correctly forwarded from I to H via red
    transport.
  • Frame flooded from H to B and from H to F via
    Spanning Tree due to provisioning errors at H.
  • Frame is erroneously forwarded from B to A via
    blue transport.
  • Consequence is that capacity on link B-A,
    committed to the blue transport, is consumed by
    the red transport. The red transport is denied
    the level of service for which it has contracted.
Write a Comment
User Comments (0)
About PowerShow.com