Mars rovers have excavated on the surface and collecte - PowerPoint PPT Presentation

1 / 1
About This Presentation
Title:

Mars rovers have excavated on the surface and collecte

Description:

Mars rovers have excavated on the surface and collected samples to study regolith. ... JSC Mars-1 : feldspar, Ti-magnetite, with minor olivine, pyroxene and glass ... – PowerPoint PPT presentation

Number of Views:74
Avg rating:3.0/5.0
Slides: 2
Provided by: Obad5
Category:

less

Transcript and Presenter's Notes

Title: Mars rovers have excavated on the surface and collecte


1
Designing a Probe for Regolith Analysis
Preliminary Measurements
Obadiah Kegege, Dr. Larry Roe, PE Arkansas
Center for Space and Planetary SciencesUniversity
of Arkansas, Fayetteville, Arkansas 72701, USA
Abstract
Mars rovers have excavated on the surface and
collected samples to study regolith. This
disturbs the sedimentary layering which hinders
exploration and full information extraction.
This problem can be resolved by designing a spike
with infrared windows to interact with
undisturbed sediments and obtain infrared
spectrometry. In this research, we
experimentally investigate the force required to
insert a sampling spike into regolith. The
parameters of this experiment will be
incorporated in the design of optical probe and
other instrumentation that can be pushed below
the surface by landers or rovers to provide
real-time exploration and analysis of undisturbed
regolith sediments. This research shall be
applicable to any surface that has regolith or
icy properties, including Mars, Moon, and
asteroids.
Objectives
Automated Sampling and Data Acquisition System
  • Penetration force and rate depends on the
    diameter of the probe
  • Design optimum penetration equipment and accurate
    data acquisition system
  • Evaluates the force needed to insert different
    sizes of probes in different composition of
    regolith
  • Work with Dr. Ulrichs group to develop a simple,
    low cost, light weight, low power optical probe
    and instrumentation to explore regolith or icy
    properties on Mars
  • Provide real-time exploration and analysis of
    undisturbed martian regolith
  • Load cell mounted between linear actuator and
    probe
  • LVDT mounted on axle of the actuator
  • Pneumatic actuator for constant force
  • Electric actuator for Constant Velocity

Figure 8. Comparison of sizes of spikes Inserted
into JSC Mars-1
  • Penetration force for JSC Mars-2 is approximately
    1/10 of that of JSC Mars-1

Figure 1. Mars (figure obtained from
www.encyclopedia/M/Mars.html)
Figure 5. Automated regolith Sampler
  • The above system can operate in two modes to
    create relationship between regolith strength and
    depth
  • (1) Velocity Mode
  • Electric actuator pushes the probe down at
    certain speed to a designated depth and stops
    there
  • At each depth level, the load cell will read the
    regolith strength (penetration force)
  • (2) Constant Force Mode
  • Pneumatic actuator pushes the probe down at
    certain constant force until balanced by the
    resistance strength from the regolith.
  • The LVDT will measure the penetrating depth and
    the computer program will measure the time
    between depth intervals.

Figure 9. Comparison of sizes of spikes Inserted
into JSC Mars-2
Conclusions
  • It is possible to characterize the layering of
    undisturbed regolith by measured strength at
    different depths
  • Preliminary penetration force experiments have
    shown that regolith resistance is dependent on
    mineral composition
  • The actual force needed to insert a spike into
    martian regolith has not been determined no
    experiment has been done on icy regolith
  • More research would facilitate the development of
    a real-time autonomous regolith sampling sensor
    system

Figure 2. Probe deployed on Mars rovers, landers
(figure obtained from 1)
Experimental Equipment and Procedures
  • Overview of simple probe
  • The regolith resistance to probe penetration
    can be expressed as

Preliminary Data and Discussion
Future Work
  • Experiment with different shapes and diameters of
    probes/spikes using icy regolith
  • Experiment with different structures/textures of
    icy regolith (Martian environment test chamber)
  • Investigate EM wave propagation in lossy medium
    for characterization of regolith mineral/water
    composition
  • Developing accurate data acquisition and
    processing algorithms

Figure 3. Spike
  • Penetration resistance increases with depth
  • Friction increases with depth

Total force acting on the probe (tip sleeve)
  • where

Probe surface area (tip sleeve )
  • Regolith
  • JSC Mars-1 feldspar, Ti-magnetite, with minor
    olivine, pyroxene and glass
  • JSC Mars-2 45 clay, 45 basalt, 10 iron
    oxide

Acknowledgements
Figure 6. Inserting 12.70 mm spike into JSC Mars-1
  • Authors would like to acknowledge support from
    Space Center grant and faculties in the Arkansas
    Center for Space and Planetary Sciences.
  • Procedure
  • Regolith placed underneath penetration test
  • Two different diameters (12.70 mm and 19.05 mm)
    of spikes used
  • Force and depth measurements recorded every 2
    seconds as the spikes inserted into regolith

References
  • Rick Ulrich, Derek Sears, Matt Leftwich, Larry
    Roe, Vincent Chevrier, Walter Graupner, Fiber
    Optic Spectral Array on a Regolith Probe for
    Surface and Sub-Surface Mineralogical Profiling
    Optical Probe for Regolith Analysis, Arkansas
    Center for Space Planetary Sciences, University
    of Arkansas, June 2006
  • Peter M. Cao, Ernest L. Hall, Soil sampling
    sensor system on a mobile robot
  • Proceedings of SPIE, Intelligent Robots and
    Computer Vision XXI Algorithms, Techniques, and
    Active Vision, pp. 304-310, October 2003
  • Jeffrey E. Herrick, Tim L. Jones, "A dynamic
    cone penetrometer for measuring soil penetration
    resistance", Soil Science Society of America
    Journal 661320-1324 , 2002
  • Bradley D.A, Seward D.W., Developing real-time
    autonomous excavation-the LUCIE story,
    Proceedings of the 34th IEEE Conference on
    Decision and Control, 1995.

Figure 4. Mechanical penetration test stand with
four linear electric actuators
Figure 7. Inserting 19.05 mm spike into JSC Mars-1
Write a Comment
User Comments (0)
About PowerShow.com