Title: KILN BASED COKING PROCESS


1
  • KILN BASED COKING PROCESS
  • AND
  • POWER GENERATION

2

KILN BASED COKING PROCESS AND POWER GENERATION
  • The application of rotary kiln technology to
    process low calorific coal to produce coking coal
  • The process allows for the use of the hot gases
    produced in the process to be used for power
    generation

3
KILN BASED COKING PROCESS AND POWER GENERATION
  • The plant will process 250,000 t of low calorific
    coal(3000cal/kg), lignite and brown coal to
    produce 170,000t of coking coal
  • A scrubber is used to remove particulates prior
    to the hot gases being used in an efficient
    manner to generate 30mw of power
  • The tar removed in the process is collected for
    other uses

4
KILN BASED COKING PROCESS AND POWER GENERATION
  • The gasification process produces hot gases at _at_
    1000 degrees centigrade
  • The hot gases are supplied to a waste heat
    recovery boiler to produce steam, the turbine
    will consume the steam to produce 30mw of
    electrical power
  • The rotary kiln, waste heat and recovery boiler
    and the steam turbine are off the shelf items

5
KILN BASED COKING PROCESS AND POWER GENERATION
  • A 50,000 tonnes per annum coking plant has been
    operating in Australia for 2 years and designs
    have been completed for the construction of a
    250,000 tonnes per year plant
  • The plant will also produce 30mw of electrical
    power

6
KILN BASED COKING PROCESS AND POWER GENERATION
  • It is expected that the time for construction of
    the plant from the date of authority to proceed
    to achieve commercial operation, including
    commencement of power generation, will take
    between twelve and fourteen months

7
(No Transcript)
8
(No Transcript)
9
(No Transcript)