Project Team: - PowerPoint PPT Presentation

1 / 3
About This Presentation
Title:

Project Team:

Description:

The building uses wind power and is heated and cooled by water ... including salvaged materials, recycled content, local/regional materials, and certified wood. ... – PowerPoint PPT presentation

Number of Views:47
Avg rating:3.0/5.0
Slides: 4
Provided by: bdu64
Category:
Tags: project | salvaged | team

less

Transcript and Presenter's Notes

Title: Project Team:


1
Snowmass ClubhouseAspen, CO
LEED v2.0 SILVER 2005 Certification
Notes from the Project Team You can only fully
understand the beauty of the building when you
realize what a major role sensitivity to the
environment played during the development
process. Don Shuster, Skico V.P.
Sustainable SitesReduced Site Disturbance
Prairie grass, and ponds cover 93 of the sites
open area requiring the removal of only four
trees. Water EfficiencyWater Efficient
Landscaping The redesign of the course reduces
the amount of irrigated turf by 20 . Energy
AtmospherePerformance Measurement The clubhouse
surpasses the local energy code by more than 40
. The building uses wind power and is heated and
cooled by water-source heat pumps in a nearby
pond.
Project Team Owner Aspen Ski
Company Architect Cottle Graybeal
Architects. Engineers MKK Engineering
Monroe Newell
Engineers, Inc. Resource
Engineering Group, Inc. Lighting Engineer
Clanton Engineers Rising Sun
Enterprise Commissioning Agent Engineering
Economics, inc. Proj. Manager
Gert Van Moorsel Contractor RA
Nelson Associates Interior
Silfer Designs
2
SnowmassClubhouseAspen, CO
Materials ResourcesOptimize Use of Alternative
Materials Purchasing policies target the use of
alternative materials including salvaged
materials, recycled content, local/regional
materials, and certified wood. 50 of the wood is
certified as sustainably harvested. Indoor
Environmental QualityAir quality is protected
through the use of low VOC paints, sealants and
glues.
  • Green design features of the Clubhouse include
  • Roof Insulation is R-55.5 Walls are R-20 and
    Basement walls R-17.5.
  • Carpet is recycled and fully recyclable.
  • Cabinets are strawboard with sustainably
    harvested Eucalyptus wood.
  • Dual flush toilets low flow shower heads.
  • Commissioned Heating and Ventilation systems.
    Our system contains neither CFC or HCFC. Auden
    Swendler Project Manager.

Building Statistics Project Costs 3
M Annual Net Savings N/ACompletion Date
June 2004 ROI 10 yearSize
10,714 SQ. FT.Building Type
Clubhouse
Case study developed by Kirk E. Jensen,
Colorado State University February 2006
AIA West Chapter Design Award 2005
3
(No Transcript)
Write a Comment
User Comments (0)
About PowerShow.com