Title: Presentacin de PowerPoint
1ENAGAS TIGF Agreement Larrau Interconnection,
November 2007
- Commercialized capacity from France to Spain once
Falces-Irurzun pipeline is in operation 87 GWh/d - Minimum guaranteed pressures at Larrau dependant
on transit flow to Spain - before Navarra compressor station is in
operation. - once Navarra compressor station is in operation.
Mont and Navarra compressor station operation
optimization (LACAL pipeline).
2Minimum guaranteed pressures at Larrau dependant
on transit flow to Spain 1) Before Navarra CS is
in operation
- Calling Q the transit flow from France to Spain,
- Minimum guaranteed pressure P at Larrau dependant
on Q will be - if Q ? 77 GWh/d ?
- pressure P according to current Operation
Manual and/or in case of operational difficulty,
specific agreement between the TSOs, without
affecting the approved nominations. - if Q ?(77 81,5 GWh/d ?
- pressure P 61 0,172(Q-77) bar(a)
- if Q ? (81,5 87 GWh/d ?
- in WINTER pressure P 61 0,172(81,5-77)0,05
(Q-81,5) bar(a) - in SUMMER pressure P 61 0,172(81,5-77-
0,141(Q-81,5) bar(a)
3Minimum guaranteed pressures at Larrau dependant
on transit flow to Spain 1) Before Navarra CS
is in operation (cont.)
4Minimum guaranteed pressures at Larrau dependant
on transit flow to Spain 2) Once Navarra CS is
in operation
Throughout 2008, ENAGAS and TIGF will define the
relation pressure/flow at Larrau that optimizes
Mont and Navarra compressor stations joint
operation in order to operate the LACAL pipeline
in the most efficient way for both compressor
stations.