Title: Prezentare generala CNE Cernavoda
1 test2
Cernavoda Nuclear Power Plant GENERAL OVERVIEW
IONEL BUCUR Cernavoda NPP SITE Director
2OUR MISSION
CERNAVODA NUCLEAR POWER PLANT IS DEDICATED TO
PRODUCE ELECTRICAL THERMAL POWER IN A SAFE AND
EFFICIENT MANNER FOR AT LEAST 30 YEARS, FROM
NUCLEAR POWER USING CANDU TECHNOLOGY.
3OUR VISION ON THE FUTURE
- RECOGNIZED WORLDWIDE AS A RELIABLE CLEAN
SUPPLIER OF ELECTRICITY - ON THE ELECTRICITY MARKET WILL SURVIVE ONLY THE
PRODUCERS THAT ARE - CLEAN (NON POLLUTING)
- EFFICIENT COMPETITIVE
- TO CONTINUE OUTSOURCING SUPPORT ACTIVITIES
- TO MEET ALL REQUIREMENTS CONDITIONS IMPOSED BY
EUROPEAN COMMUNITY FOR NUCLEAR INDUSTRY - TO PARTICIPATE IN UNIT 2 PROJECT, MAINLY FOR
- SELECTION, RECRUITING TRAINING OF
COMMISSIONING OPERATION PERSONNEL - COMMISSIONING AND INNITIAL OPERATION
- LICENSING PROCESS BY REGULATORY AUTHORITIES
- PROVISION OF LOCAL STAFF FOR MT ORGANIZATION
- TAKE OVER UNIT 2 AND CREATEAN ORGANIZATION WITH
2 UNITS IN OPERATION - SNN CERNAVODA SITE ASSET MANAGEMENT
4UNIT 1 PERFORMANCE
- PRODUCTION OF ELECTRICAL POWER DELIVERED TO THE
NATIONAL GRID (MWh)
5- WHILE MAINTAINING THE NOMINAL ELECTRICAL POWER
OUTPUT OF THE UNIT 1, THERMAL ENERGY IS SUPPLIED
FOR - ? U2 SITE
- ? CONTRACTORS
- ? 60 OF THE CERNAVODA TOWN
- DURING 1997? 2005 APPROX. 542.686 GCAL WERE
PRODUCED -
- GCAL
6 TARGET FOR 2006 ? 90
7- COMPARED WITH OTHER SIMILAR CANDU UNITS, AT THE
END OF 2005, THE GROSS CAPACITY FACTOR WAS
- SINCE IN SERVICE
- WOLSUNG 3, 4 95,2
- WOLSUNG 2 93,7
- CERNAVODA 1 87,13
- QINSHAN 4 86,6
- WOLSUNG 1 85,6
- DARLINGTON 3 85,4
- EMBALSE 85
- QINSHAN 5, DARLINGTON 4 84,4
- DARLINGTON 1 83,1
- RAPS 4 82,5
- AT THE END OF 2005, CERNAVODA UNIT 1 WAS PLACED
IN POSITION 3 OUT OF 31 PHWR UNITS IN SERVICE.
8IMPACT ON PEOPLE ENVIRONMENT
- CUMMULATED RELEASES OF RADIOACTIVE EFFLUENTS (?Sv)
LEGAL DOSE FOR POPULATION 1000 ?Sv THE AVERAGE
ANNUAL DOSE ONLY 0,69 FROM THE LEGAL DOSE
9- VOLUME OF RADIOACTIVE WASTE (m3)
TOTAL 204,3 m3
AVERAGE ANNUAL DESIGN VALUE 30 m3
10- COLLECTIVE DOSE EVOLUTION - COMPARED WITH CANDU6
ANNUAL AVERAGE
11OUTSIDE ORGANIZATION MISSIONS
2004 MARCH WANO HPES SEMINAR 2004 MAY AIEA
IPSART MISSION 2004 JUNE WANO SUPERVISOR
DEVELOPMENT SEMINAR 2004 OCTOBER WANO SELF
ASSESSMENT WORKSHOP 2005 JAN-FEBR AIEA
OSART MISSION 2005 MARCH AIEA ON PSA EXTERNAL
EVENTS AND U2 2005 APRIL WANO TECHNICAL SUPPORT
2005 AUG-SEPT WANO TECHNICAL MISSION DURING
OUTAGE 2005 OCTOBER AIEA TECHNICAL
SUPPORT 2005 DECEMBER WANOTECHNICAL SUPPORT RP
12UNIT 2 STATUS
- OVERALL PROJECT IS ABOUT 88 COMPLETE
- 158 SYSTEMS OUT OF 303, HAVE BEEN TURNED OVER TO
COMMISSIONING - APPROXIMATELY 38 OF THE TOTAL HEAVY WATER WAS
MOVED TO SITE - APPROXIMATELY 74 OF THE TOTAL NUCLEAR FUEL IS
FABRICATED AND IN STOCK AT THE FUEL FACTORY - COMMISSIONING, OPERATION MAINTENANCE STAFFING
IS COMPLETED - LICENSING PROCESS IN PROGRESS THE UNIT AND ITS
PERSONNEL - MATURE ORGANIZATION CHART FOR 2 UNITS IN
OPERATION ESTABLISHED
13SOCIAL ECONOMICAL EFFECTS
- PROVIDE OVER 1870 JOBS AS SNN EMPLOYEES AND, ON
THE LONG TERM, AROUND 500 JOBS FOR CONTRACTOR
COMPANIES. - PROVIDE LONG TERM CONTRACTS FOR OVER 34 COMPANIES
IN THE DISTRICT OF CONSTANTA WITH A TOTAL
BUSINESS FIGURE OF OVER 90 MIL. RON. - PROVIDE ACCOMODATION FOR ABOUT 38 OF EMPLOYEES
(30 IN CERNAVODA AND 8 IN CONSTANTA). - PROVIDE HEATING FOR MORE THAN 60 OF CERNAVODA
HABITANTS (APPROX. 30.000 Gcal/2005) AT THE
LOWEST PRICE IN THE COUNTRY. - PROVIDE A CONSTANT CONTRIBUTION TO THE LOCAL
BUDGET. STARTING 1999 AND UP TO 2005 A TOTAL
AMOUNT OF OVER 2,3 MIL. USD WAS PAID. COMPARED
WITH 2001 WHEN THE CONTRIBUTION WAS OF OVER
184.000 USD , IN 2005 OVER 693.000 USD WERE PAID. - THE CONTRIBUTION TO THE SOCIAL ENSURERS STATE
BUDGET WAS PAID WITH AN AVERAGE OF 10 MIL. USD
PER YEAR. STARTING 1999 AND UP TO THE END OF
2005, OVER 70,2 MIL. USD WERE PAID.
14PLANTS COOPERATION WITH LOCAL COMMUNITY
- THE PUBLIC RELATIONS CENTER WAS OPENED, THE
PROGRAM OPEN DOORS, AS WELL AS THE CERNAVODA
NPP SITE ON THE INTERNET WERE INAUGURATED. THE
LOCAL COMMUNITY WAS INFORMED ABOUT THESE ACTIONS.
AT THE PUBLIC RELATIONS CENTER, THE FOLLOWING
DOCUMENTS CAN BE CONSULTED - - ENVIRONMENT REPORT BROCHURE
- - LEVEL II ENVIRONMENT REPORT FOR CERNAVODA NPP
- - MONTHLY BULLETIN REGARDING RADIOACTIVE
EFFLUENTS MONITORING AND ENVIRONMENT
RADIOACTIVITY. - ACCORDING TO PLANT PROCEDURES, ALL PRESS RELEASES
ARE ALSO TRANSMITTED TO LOCAL AUTHORITIES. - A MONTHLY BULLETIN IS ISSUED REGARDING
ENVIRONMENT RADIOACTIVITY. - THE ANNUAL SCHEDULE FOR PRESENTATION REGARDING
VARIOUS TOPICS OF INTEREST (SPENT FUEL DRY
STORAGE, SPECIALISTS OF SEVERAL NUCLEAR AREAS,
RADIOPROTECTION SPECIALISTS) IS AGREED WITH
SCHOOLS AND HIGH SCHOOLS REPRESENTATIVES. IN
ORDER FOR THESE INFORMATION SESSIONS TO BE FULLY
EFFECTIVE, THE PUBLIC RELATIONS CENTER WAS
PROVIDED WITH VIDEO-PROJECTOR, INTERACTIVE TABLE,
COMPUTER CONNECTED TO THE INTERNET. - PERIODICAL MEETINGS (AT LEAST EVERY TWO MONTHS)
WITH CERNAVODA CITY HALL REPRESENTATIVES. - ENVIRONMENTAL LAB AVAILABILITY FOR VISITS
PRESENTATIONS