Title: SE 12th Street


1
SE 12th Street
Roadway Improvements
February 8, 2005
2
PROJECT LOCATION
E. UNIVERSITY AVENUE
26
331
SE 12th STREET
SE 1st AVENUE
SE 11th STREET
SE 2nd AVENUE
3
PROJECT PURPOSE
  • Widen roadway and improve condition of
    pavement
  • Improve pedestrian access, movement and safety
  • Address residential flooding problems
  • Improve water quality of Rosewood Branch

4
DESIGN ELEMENTS
  • Reconstruction/widening of SE 12th Street
  • Addition of curb gutter and storm drain
    system
  • Sidewalk and ADA-compliant ramps
  • Paved driveway entrances
  • Parking reconfiguration in commercial area
  • Construction of stormwater pond
  • Rosewood Branch stream bank stabilization

5
PROPOSED IMPROVEMENTS
26
E. UNIVERSITY AVENUE
  • Roadway widened from 20 to 24
  • Curb gutter and storm drain system
  • Paved driveway entrances at all existing
  • locations
  • 6 sidewalk along west side of
  • roadway for entire street length
  • 8 sidewalk and parallel parking along east
  • side of street in front of commercial area
  • Utility relocations
  • Stormwater management (SWM) pond
  • south of SE 2nd Avenue for water quality
  • Grade and stabilize stream banks south of
  • SE 2nd Avenue

8 SIDEWALK
PARKING
SE 1st AVENUE
SE 12th STREET
6 SIDEWALK
SE 2nd AVENUE
STREAM WORK
SWM POND
6
ROADWAY TYPICAL SECTION
Existing Roadway
Proposed Typical Section
7
SE 12th STREET - Looking Towards SE 2ND Avenue
Existing Conditions
Artists Rendering
8
SE 2nd AVENUE AT SE 12TH STREET (Looking East)
Existing Conditions
Artists Rendering
9
SE 12th STREET AT SE 2nd AVENUE (Looking North)
Existing Conditions
Artists Rendering
10
SE 12th STREET - Looking At East University Avenue
Existing Conditions
Artists Rendering
11
ROSEWOOD BRANCH STREAM WORK
  • New endwall
  • Stabilize stream banks
  • Lay back slopes
  • Revegetation
  • Erosion Protection
  • Reforestation

12
CONSTRUCTION GOALS
  • Minimize disruptions to residents and
    businesses
  • Keep all impacts within City right-of-way
  • Grading for sidewalk
  • Driveway entrance tie-ins
  • Maintain one lane of traffic at all times
    during construction
  • Road to be closed to through traffic
  • Access for local residents only
  • Maintain access to all residential/commercial
    driveways/entrances
  • Complete construction as quickly as possible

13