Title: Ch. Hartinger L. Barl
1Ch. Hartinger / L. Barl
GeGa Detector Arrays
2Overview
- Performance results of FM HS Modules
- Status of the LS HS Array Integration
3FM HS Modules
- 8 Test Runs (32 modules)
- MPE Test Equipment Improvements
- 10 filter capacitors at the connector
distribution panel inside the cryostat - Sense lines for the VDDA, VSS, GRD, VDDr and
Zero_bias supply lines - Optics include only a black body, 1 mirror but no
attenuation filters - Stability of BB temperature is lt 1 mK
- Standard Measurements
- Warm functional test at RT checks the supply
currents - Cold functional test at 4 K and the output
frames - Cold performance test (1.85 K)
- Dark current
- Noise Equivalent Power (NEP)
- Responsivity
4Dark current
Cold Performance Test
- Background of 4.2 K corresponds to a flux lt
exp(-18) W/pixel
5Dark current
Cold Performance Test
- Strong variation between modules
6Noise Equivalent Power (NEP)
Cold Performance Test
- The modules behave very similar up to a bias of
70mV, where the sensitivity is maximal
- The NEP is strongly dependent on the flux
7Responsivity
Cold Performance Test
- The responsivity varies by more than a factor 3
for different modules - The arrangement in the detector array was chosen
according to the responsivity
8Distribution of the Responsivity in the TEL Focal
Plane
HS Integration
The modules with the high values were positioned
at the center of the array
9Homogeneity of the Responsivity
Cold Performance Test
FM190 strong gradient
FM174 almost homogeneous
Each module has its own characteristic
distribution not caused
by an inhomogeneous flux
10Reproducibility of the measurements
Cold Performance Test
Multiple tests of modules at different positions
in the set-up
Different distribution between the two tests (FEE
exchanged, connections re-glued)
Very good reproducibility of the data points
after two tests (FEE changed)
11HS-Modules Status after Integration
HS-Detector Status
- 25 modules integrated
- 2 open pixels
- 2 pixel connections cut
- 2 calibrated temperature sensors
- (FM161 FM168)
ESD protection by aluminized cigarette wrapping
paper during the integration
12Arrangement of the HS-Modules
HS-Detector Status
Front view of the HS-detector
13Arrangement of the LS-Modules
LS-Detector Status
- 25 modules integrated
- in FM 107 FM 135 behavior of few pixels
undetermined - 3 open pixels
- 1 pixel connection was cut
- 2 calibrated temperature sensors
- (FM132 FM135)
14FM Blue Detector Assembly Integration Status
Integration Status
FM PACS Blue Detector Array
15FM Red Detector Assembly Integration Status
Integration Status
16Work in Progress
- Bake out at 80C for 3 days
- Final inspection prior to delivery to KT
- Warm functional test after cold vibration test