Speech Recognition for User Interface robotics - PowerPoint PPT Presentation

1 / 25
About This Presentation
Title:

Speech Recognition for User Interface robotics

Description:

A means of communication need to be established. Natural ... Able to do arithmatic calculations. Analysis of new system (cont.) Non-functional requirements ... – PowerPoint PPT presentation

Number of Views:752
Avg rating:3.0/5.0
Slides: 26
Provided by: upe3
Category:

less

Transcript and Presenter's Notes

Title: Speech Recognition for User Interface robotics


1
Speech Recognition for User Interface robotics
  • Oratile Leteane
  • 203024214
  • Supervisor
  • Mr Lester Cowley
  • 2007

2
(No Transcript)
3
Contents
  • Background
  • Problem description
  • Related work
  • Analysis of the new system
  • Discussion of tools
  • Risks of the project
  • Project plan
  • Progress report
  • Conclusion

4
Background
  • Increasing number of robots
  • A means of communication need to be established
  • Natural language, a desirable communication mode
  • Researchers need to find a way.

5
Background (cont.)
  • Good thing about studying robots
  • iCat research platform is available
  • Platform for studying robotic
  • User interface robot iCat
  • OPPR (Open platform for personal robot)
  • Website for supporting iCat research community

6
Background (cont.)
  • iCat

7
Background (cont.)
  • Different expressions for iCat

Anger
Sad
Happiness
8
Background (cont.)
  • Main objectives is to give icat robot
    capabilities
  • Ability to recognise constraint speech
  • Able to give relevant responce through
  • Speech
  • Facial expressions

9
Problem description
  • Relevance of the project
  • Research foundation
  • Problem statement
  • Providing iCat with a facility that will enable
    it to recognise constraint human speech

10
Problem description (cont.)
  • Keywords
  • Dragon Naturally speaking 9 (for developers)
  • OpenCCG (Natural source language parsing)
  • Scope
  • Understanding iCat current capabilities
  • Using current capabilities, DNS-9 and OpenCCG to
    implement application to enable iCat to recognise
    human constraint speech.

11
Problem description (Cont.)
  • Limitation of research
  • Follow certain number of commands
  • Objects detection and visual recognition not part
    of research

12
Related work
  • Literature study
  • iCat community website for supporting the iCat
    research community

13
Related work (cont.)
  • Existing systems
  • Kate (2006) Exploring Social Interaction with
    user interface robots using iCat
  • Interst To provide some insight into social
    interaction between human and robots

14
Related work (cont.)
  • Human-Robot Dialogue for Joint Construction tasks
  • iCat is envolved on construction task
  • Robot and human are equal partners

15
Related work (cont.)
  • Robust Speech Recognition System for
    Communication Robots in Real Enviroments
  • Aim to develop communication robot that can
    naturally interact with humans (high level dialog
    communication)

16
Analysis of new system
  • Functional requirements
  • Recognise a certain number of specified commands
  • Respond to the given commands
  • Able to do arithmatic calculations

17
Analysis of new system (cont.)
  • Non-functional requirements
  • Easy of use
  • Easy to learn

18
Analysis of new System (cont.)
  • Discussion of tools
  • OPPR
  • Reasons to use
  • Contain robot animation editor
  • Contain ready to use library with animations for
    speech

19
Analysis of new System (cont.)
  • Discussion of tools
  • LUA programming
  • Dragon Naturally Speaking 9 (DNS-9)
  • for Speech Recognition
  • OpenCCG library
  • Parsing of recognised speech to logical form

20
Project risks
  • New project taken at NMMU in the speech domain
  • Learning Language (LUA) new environment (OPPR)
  • Possibility of iCat being damage

21
Risk of project
  • Addressing risks areas
  • Being part of iCat community group
  • Start learning LUA programming as early as
    possible
  • Ensuring that iCat is kept in one place
  • Reduce chances of breaking it

22
Project plan
REQUIREMENTS
ANALYSIS DESIGN
IMPLEMENTATION
EVALUATION
14/02 TO 23/02
24/03 TO 14/05
15/05 TO 03/09
04/09 TO 01/09
23
Progress report
24
Conclusion
  • It is a very challenging work
  • Still the beginning, more to come

25
Questions?
Write a Comment
User Comments (0)
About PowerShow.com