Title: Fargo Flood Control
1Fargo Flood Control Southside
Flood Protection Forest River Subdivision
Public Meeting July 21, 2008
2Fargo
Moorhead
Interstate 29
Rose Coulee
Frontier
25th Street South
Red River
Cass Co Hwy 81
Wild Rice River
1997 Spring Flood South of Fargo
3Fargo
Interstate Hwy 94
West Fargo
Southside Flood Control
Moorhead
Preliminary 100 Year Floodplain
Horace
Interstate Hwy 29
Oxbow
4Fargo
Interstate Hwy 94
West Fargo
Southside Flood Control
Moorhead
After Project Preliminary 100 Year
Floodplain With Internal 100 Year Floodplain
Horace
Interstate Hwy 29
Oxbow
5Southside Flood Control
- Provide Protection from overland flooding that
threatens the majority of properties south of
I-94. - Prevent extensive expansion of South Fargo
Floodplain and mandatory flood insurance
requirement. - Provide growth area for Fargo, helping to keep
our regions economy healthy
6Project Flood Control Methods
- FEMA levees with and without diversion channels
- Channel extensions
- (Red River drain improvements)
- Storage inside of project
- Storage in upstream watershed
7Southside Flood Control
STORAGE SUMMARY Existing effective storage
6,000 Acre-Ft Base project 0
Acre-Ft Channel extension/storage 2,000
Acre-Ft Supplemental storage 4,000
Acre-Ft Upstream dams 75,000 Acre-Ft (External
storage)
STORAGE
8(No Transcript)
9(No Transcript)
10Southside Flood Control
Wild Rice Levee Option Including Mini-Bypass
Alternative
11Southside Flood Control
Levees east of Cass Co. Hwy 81
Forest River
1276th Avenue
Cass Co Hwy 81
1997 Spring Flood South of Fargo
13West Fargo
Fargo
Southside Flood Control
Forest River Existing 100 yr Floodplain
Horace
14West Fargo
Fargo
Southside Flood Control
Forest River Preliminary 100 yr Floodplain
Horace
15West Fargo
Southside Flood Control
Fargo
Forest River Existing and Preliminary 100
yr Floodplains
Horace
16Forest River Subdivision Options Considered
- Option 1
- East and West Levees
- North and South Sandbag Protection Plan
- Option 2
- East and West Levees
- North and South Sandbag Protection Plan
- North and South Road Raises
17Forest River Subdivision
- Option 1
- Components
- Earthen Levee (BFE 4ft)
- East Side
- West Side
- Sandbag Protection Plan (BFE 1ft)
- North Side
- South Side
- Prelim. Geotechnical Completed
18Option 1 - Cost Estimate
- Construction 161K
- Real Estate 25K
- Total Project Cost 186K
- Total Number of Homes Protected 12
- Total Cost / Home 15,500
19Forest River Subdivision
- Option 2
- Components
- Earthen Levee (BFE 4ft)
- East Side
- West Side
- Road Raise (BFE 1ft)
- North Side
- South Side
- Sandbag Protection Plan (BFE 1ft)
- North Side
- South Side
- Prelim. Geotechnical Completed
20Option 2 - Cost Estimate
- Construction 674K
- Real Estate 52K
- Total Project Cost 726K
- Total Number of Homes Protected 12
- Total Cost of Protection / Home - 60,500
21Forest River Floodplain Comparison
Note Options do not provide certified flood
protection.
22Forest River Subdivision
Cost Estimate
23Additional Issues / Next Steps
- Other Options Considered
- Rapid deployment
- 30-320/lf
- Level Surface
- Cleanup
24Additional Issues / Next Steps
- Other Options Considered
- Flood proofing
- 90-100K / per home
- Does not remove need for interior protection
- Proposed Project Hydraulic Benefits (3-6 inches)
- Geotechnical Issues - NTI
- County/Emergency Operations
- Flood Insurance Rates
25Project Schedule
26Southside Flood Control
Wild Rice River Levee Alternative
Base Project w/ Alternatives
27Southside Flood Control
Comment Sheet
28Southside Flood Control
Questions / Discussion
29 30(No Transcript)
31(No Transcript)
32(No Transcript)
33(No Transcript)
34(No Transcript)
35(No Transcript)
36(No Transcript)
37(No Transcript)
38(No Transcript)
39(No Transcript)