Title: Portable Classroom Controls Project


1
Portable Classroom Controls Project
  • Chuck Collins
  • RCM Meeting
  • April 27, 2007

2
The portable classroom
Time clock User control Electric heating No
scheduling capability Electric heat pumps No
A/C Exhaust fans Limited windows No demand
charges
3
Part of PSE rebate program for schools
  • List of eligible equipment
  • Variable rebate amounts depending on which pieces
    of equipment installed
  • Application for rebate
  • Rebate amount is close to cost of controller

4
Portable classroom control project process
  • Project research (cost/benefits, other data)
  • Make pitch to organization
  • Rebate application, work with PSE early
  • Find a contractor to do the work
  • Commence with project
  • Set up temperature set-points, times, etc
  • Verify avoided costs, consumption
  • Receive rebate

5
The Project
  • 127 portable classrooms
  • Upgraded thermostat controller
  • Connected to District DDC through network
  • Control setpoints via DDC system
  • Can verify temps, setpoints, trends, etc
  • Ability to remotely shut down all portables
  • Scheduling, snow day, etc

6
After-project analysis using PSEs EIS
March 2005 through February 2007
7
Weekly analysis shows weekend shutdown
Feb 24, 2007 through April 24, 2007
8
Daily profile 2005 High peak, runs during night
hours
First week of March, 2005
9
Daily profile 2006 Systems running 24/7
First week of March, 2007
10
Daily profile shows lower demand, lower night
consumption
First week of March, 2007
11
Avoided electricity calculations
  • Mar 2005
  • Cost - 75.22
  • kWh 942.26
  • Mar 2006
  • Cost - 182.72
  • kWh 2,391.50
  • Mar 2007
  • Cost - 62.97
  • kWh 766.45

942.26 2391.50 2 1,666.9 766.45
900 kWh per year or 54
12
Avoided cost calculations
  • Mar 2005
  • Cost - 75.22
  • kWh 942.26
  • Mar 2006
  • Cost - 182.72
  • kWh 2,391.50
  • Mar 2007
  • Cost - 62.97
  • kWh 766.45

75.22 182.72 2 128.97 - 62.97
66.00 per year or 51!
13
Avoided cost survey
  • 18 portables at various sites (14 of total)
  • Used PSEs Energy Interval Service for data
  • Total electricity cost March 2006 2,468.39
  • Total electricity cost March 2007 1,854.49
  • Avoided monthly cost for sample 613.90
  • x 10 months 6,139.00 annual avoided cost
  • / 18 portables 341.05 per portable, per year
  • x 127 portables 43,314.05 (estimated annual
    avoided cost, based on survey)

14
Total cost/benefit
  • Estimated annual savings 43,314
  • Total project cost 110,642
  • Simple payback (no rebate) 2.6 years
  • PSE rebate 29,750
  • Actual project cost 110,642 - 29,750 80,892
  • Simple payback (with rebate) 1.9 years

15
  • Thank you!!
  • Questions??