Title: PowerPointpresentatie
1Electrabel Investor Day
Vilvoorde CCGT Power Station A Low Cost
Investment by Excellence
Gerrit Boon , Manager Conventional Generation
Operations Area Centre - Antwerp
Vilvoorde Power Station, Brussels,11 October
2002
2Vilvoorde CCGT Power Station A Low Cost
Investment by Excellence
- Introduction
- How to Convert Energy into Electricity ? 4
- The Functioning of a Conventional Power Station
5 - The Functioning of a Combined Cycle 6 - 8
- Organization 9 -13
- Vilvoorde Power Station
- Short History 14 -15
- Investment Decision 16
- Visiting Tour 17
3How to convert energy into electricity
chemical
thermal
mechanical
electrical
applications
4
4Conventional Power Station
Cooling tower
Machine room
Steam boiler
5
5Vilvoorde CCGT Power Station
STEAM RECOVERY BOILER
TRANSFORMER
STEAM TURBINE
ALTERNATOR
GAS TURBINE
COOLING TOWER
6Gasturbine
7Steamturbine - Alternator
8OrganizationOperations 5 conventional
generation zones
Vlaanderen Centrum-Antwerpen Kempen-Maas Hainaut-N
amur Liège-Luxembourg
9
9Organization
Staff 104 Installed Capacity 2000 MW
AREA MANAGEMENT OPERATIONS
CARE
Site
Site
Site
Asset Manager
Vilvoorde - Drogenbos
Kallo
CHP
10Generation Capacity in Operations Area Centre -
Antwerp
2000 MW
Conventional
Cogen
Turbojets
CCGT
18
Kallo
Buda
557
Drogenbos
460
Bayer
43
385
Elsene
18
Vilvoorde
Degussa
43
38
Schaarbeek
18
Esso
43
Monsanto
Phenolchemie
23
Gasturbine
Energy Recovery
Windturbines
TotalFinaElf
154
Indaver (Beveren)
18
AirProducts
43
Drogenbos
78
Schelle
4,5
Isvag (Wilrijk)
11
42
Schaarbeek
11
11Site Vilvoorde - Drogenbos
- Operational center for
- CCGT Vilvoorde 1 385 MW
- CCGT Drogenbos 460 MW
- GT Drogenbos 78 MW
- Steam recovery Schaarbeek 42 MW
965 MW
One control room
3 men in shift - 8 shifts
12Tree Units - One control room
13Vilvoorde Power Station
Short History
1959 1961 2 x 125 MW on coal 150 kV
transformer station 1965 One new 125 MW unit on
coal (UNIT 3) 1970 The three boilers are
transformed to switch over from coal to fuel
gas 1976 Unit 3 transformed back to
coal 1981 Unit 2 fully multi fuelled 1982 Heav
y incident (4 August) Turbo alternator
exploded Incident covered by insurance
14Vilvoorde Power Station
Short History
1986 Renewed unit 3 commissioned 1992 New
organization Vilvoorde CCGT Drogenbos
steam recovery from incinerator Schaarbeek
(Brussels) under one management 1998 Electrabel
Press Release (April) Vilvoorde is to Have
the First Power Station of the New Millennium
380 MW CCGT VILVOORDE1 2000 First
Firing (November) 2001 Industrial
production (April)
15Investment Decision
- By using the existing infrastructure, in
particular the turbine generator group and
cooling tower, the required investment will be
under 100 million, this enabling Vilvoorde 1 to
generate electricity at a highly - competitive cost
- Investment 40 of new CCGT
- Low fixed costs (20)
- Increased productivity
- Higher energy yield
- obsolete units 31 to 37
- CCGT Drogenbos 52
- CCGT Vilvoorde 56
- Lower NO? (- 45) and SO? (- 50) emissions, no
dust - Reduced noise
16Steam recovery boiler
Steamturbine Alternator
Gasturbine
To 150 kV grid