Report to WCRP Observations and Assimilation Panel - PowerPoint PPT Presentation

1 / 9
About This Presentation
Title:

Report to WCRP Observations and Assimilation Panel

Description:

Coincident launch with satellite overpass. Minimum requirement: ... Launch at alternating satellite overpass nodes; one/day cycling through three ... – PowerPoint PPT presentation

Number of Views:43
Avg rating:3.0/5.0
Slides: 10
Provided by: wmo93
Category:

less

Transcript and Presenter's Notes

Title: Report to WCRP Observations and Assimilation Panel


1

Towards a GCOS Reference Upper Air Network
Report to WCRP Observations and Assimilation
Panel David Goodrich Director, GCOS Secretariat
2
Rationale
  • Motivation
  • Problems for climate in accuracy, long-term
    stability
  • Changes in measurement systems
  • Objectives
  • Provide long-term, high-quality climate records
  • Constrain/calibrate data from more
    spatially-comprehensive global observing systems
    (including satellites)
  • Measure large suite of co-related climate
    variables

3
Process to Date
  • Establish Climate Requirements
  • Boulder Workshop 2005
  • Participants Climate scientists, data users
  • Requirements report prepared
  • Assess Instrumentation/Siting Options
  • Seattle Workshop 2006
  • Participants Instrumentation, network design
    specialists Observing system managers
  • Draft report prepared

4
  • Proposed Observing System Architecture

5
Climate Requirements Example
6
Proposed Site Instrumentation
  • Level 1 (Highest Priority) Measurements
  • Standard surface variables (pressure,
    temperature, humidity and wind)
  • Redundant / simultaneous measurement of
    temperature and water vapor
  • Pressure and GPS / radar height
  • Ground-based GPS receivers (column water vapor)
  • Level 2 Measurements
  • Surface radiation (BSRN suite)
  • Microwave radiometer (temperature/moisture
    profile)
  • Multi-channel infrared radiometer (such as AERI
    temperature and humidity properties and
    cloud retrieval)
  • Integrated trace gas (at least ozone)
    measurements
  • Column aerosol measurements from sunphotometers  

7
A Potential Model Lindenberg, Germany
8
Temporal Sampling Issues for Sondes
  • At least some launches at 00 and/or 12 UTC
  • Other considerations
  • Obtaining daytime, nighttime, dawn and dusk
    observations to span instrument behavior to
    varying radiative conditions
  • Adequate sampling of diurnal cycle for some
    places for limited times
  • Coincident launch with satellite overpass
  • Minimum requirement
  • Twice daily with one at 00 or 12 UTC
  • Launch at alternating satellite overpass nodes
    one/day cycling through three orbiter
    configuration every six days
  • Area of ongoing debate

9
Next Steps
  • Community Review and Discussion
  • Formation of AOPC Working Group
  • Consideration by Relevant Panels
  • CIMO Management Group
  • CBS ET Evolution of Global Observing System
  • WOAP
  • GCOS Steering Committee
  • Coordination with Relevant Observing Systems
  • Solicitation of Contributions by Members
  • Phased Implementation, Building on
    Existing Sites
Write a Comment
User Comments (0)
About PowerShow.com