Integrating Site Design and Stormwater Management - PowerPoint PPT Presentation

1 / 20
About This Presentation
Title:

Integrating Site Design and Stormwater Management

Description:

Integrating Site Design and Stormwater Management – PowerPoint PPT presentation

Number of Views:73
Avg rating:3.0/5.0
Slides: 21
Provided by: pgre6
Category:

less

Transcript and Presenter's Notes

Title: Integrating Site Design and Stormwater Management


1
Integrating Site Design and Stormwater Management
2
Recommended Site Design Procedure For
Comprehensive Stormwater Management
  • General Questions
  • How can stormwater management be best integrated
    into the site planning process?
  • How can BMPs (Best Management Practices) be
    selected to maximize their performance?
  • What must be considered in order to meet
    Construction NPDES permitting requirements?

3
  • Three Primary Elements Of Site Planning
  • Site Analysis
  • (Chapter 4 PA Stormwater BMP Manual)
  • Non-structural BMP opportunities analysis
  • (Chapter 5 PA Stormwater BMP Manual)
  • Structural BMP opportunities analysis
  • (Chapter 6 PA Stormwater BMP Manual)

4
Site Analysis
5
(No Transcript)
6
(No Transcript)
7
Importance of Site Analysis/Assessment
  • Comprehensive stormwater management must begin
    with a thorough assessment of the site and its
    natural systems.
  • The site assessment includes taking inventory of
    and evaluating the various natural resource
    systems which define each site and pose both
    problems and opportunities for stormwater
    management.
  • Special protection waters -- Known flooding
    problems
  • Wetlands -- Steep slopes
  • Shallow bedrock/groundwater -- Soil types
  • Karst/abandoned mines -- Endangered species

8
Non-Structural BMPs
9
(No Transcript)
10
(No Transcript)
11
(No Transcript)
12
Importance of Non-Structural BMPs
  • These practices can reduce land clearing and
    grading costs, reduce infrastructure costs,
    reduce stormwater management costs, and increase
    community marketability and property values.
  • Long term, they sustain their stormwater
    management capacity with reduced operation and
    maintenance demands.
  • Prevent stormwater generation and not just
    mitigate stormwater related impacts once the
    problem has been generated.

13
Structural BMPs
14
(No Transcript)
15
(No Transcript)
16
(No Transcript)
17
Importance of Structural BMPs
  • Once prevention has been maximized, it is likely
    that some amount of stormwater peaking and volume
    control will remain to be managed.
  • Can be engineered to perform rate control and
    volume reduction functions with a relatively high
    degree of certainty.
  • Provide allot of options to fit varying types of
    project sites.

18
In Summary
  • 1) Perform a thorough site analysis to determine
    constraints versus opportunities.
  • 2) Maximize implementation of non-structural
    BMPs.
  • 3) Determine remaining rate and volume of
    storm-water to be managed and design structural
    BMPs to address that rate and volume.
  • 4) Finalize your integrated stormwater
    management design.

19
(No Transcript)
20
Questions?
Write a Comment
User Comments (0)
About PowerShow.com