Title: Case Study Preparation of an EMP
1Case Study Preparation of an EMP
- Integrated Ecosystem Management
- of
- Sunshine-Moon River Basin (SMRB) Project
2(No Transcript)
3Project Location
Country A
Earth Town
Sunshine River
HPP
HPP
Country X
Flower Town
Moon River
Country B
Red Nature Reserve RAMSAR site
Mouth of Sunshine River
Country Y
Mushroom Sea
4Environmental Issues
- Surface and ground waters pollution due to
untreated industrial and municipal wastewaters
discharged directly into reservoirs/rivers - Environmental degradation (eutrophication,
habitat loss, erosion) of coastal habitats,
inland surface waters and marshes - Salt water intrusion in Sunshine Delta due to
long term agricultural practices (irrigation)
5Project Environmental Goals
- Reduction of water nutrients and other water
pollution from municipal and industrial sources
in selected municipalities in the Basin - Restoring and maintaining of coastal wetland
ecosystem in Sunshine River through improved
flood management, conservation of wetland sites
and restoration of river banks - Reduction of salt water intrusion through a pilot
scheme implemented in Sunshine river
6Project Activities with possible Environmental
Impacts
- Component 2 Improved management and use of
wetlands eco-systems and biodiversity - Improvements in sites, services and management
tools in Red Nature Reserve Ramsar site (Country
A) and in two protected areas (Country B) - Restoration and improvement of small scale water
existing infrastructure to maintain water flows,
address the problems of saltwater intrusion,
flood management and erosion (e.g.,
rehabilitation of river gates, wooden irrigation
wheels, restoration of river banks) - Enhancement of HPPs and dams operational
capacities to maintain environmental flow
requirements and control flood management (e.g.,
dam safety monitoring equipment)
7Project Activities with possible Environmental
Impacts contd
- Component 3 - High priority investments in water
pollution control with low cost, appropriate
wastewater technology improvements - Rehabilitation and upgrading of wastewater
treatment systems in 3 municipalities in Country
A and 2 in Country B including fixing leaking
wastewater collection system and additional
treatment infrastructure for reduction of
nutrients (e.g., improvement of primary treatment
and installation of small design for biological
process) - Upgrading the industrial wastewater treatment
system at a metallurgical factory in the Flower
Town (Country A) (e.g., replacement of existing
equipment, additional treatment equipment to
reduce chromium and nickel pollution during
production process)
8Applicable Safeguard Policies
- Environmental Assessment category B (OP/BP 4.01)
- Natural Habitats (OP/BP 4.04) - Ramsar
- Safety of Dams (OP/BP4.37)
- Projects on International Waterways (OP/BP7.50 )
legal policy that is not included in EMP
9OP/BP 4.01 Environmental Assessment
- Preparation of an EA and site-specific
Environmental Management Plans (EMPs) - EA identified and analyzed the potential
environmental impacts of the different activities
(on air, groundwater, surface water, soil, flora
and fauna) - EA made recommendations and options for
mitigation measures - EMPs addressed mitigation measures and monitoring
activities
10OP/BP 4.01 and public disclosure
- Draft EA and site specific EMPs have been
discussed during several consultations in both
countries - Final EA and site-specific EMPs were disclosed in
both countries in local language and at the Bank
Infoshop in English
11OB/BP 4.04 Natural Habitats(triggered because of
positive investments in protected areas)
- Flood management in SMRB can be compromised by
poor operations of HPPs or needs to meet other
water use demands ? maintenance of environmental
flows is complicated - Small-scale infrastructure to regulate the water
regime in the Mini River within protected Red
Nature Park in order to restore natural wetlands
in the park - Improvements in sites which allows visitor access
to sensitive ecosystems (promoting eco-tourism)
12OP 4.37 Safety of Dams (policy application)
- inspect and evaluate the safety status of the
existing dam and its performance history - review and evaluate the owners operation and
maintenance procedures and - provide a written report of findings and
recommendations for any remedial work or
safety-related measures necessary to upgrade the
existing dam to an acceptable standard of safety
13OP 4.37 Safety of Dams contd (Study findings
and recommendations)
- dam is located in a seismically active area
- installation of proper equipment would allow
adequate response to earthquakes - needed dam safety monitoring equipment and
development of emergency and evacuation plans
14Other safeguard policies
- Physical Cultural Resources (OP/BP 4.11) - The
EMP notes that archaeological resources should be
covered by chance-finds procedures clause
incorporated in the contractors agreements - Involuntary Resettlement (OP/BP 4.12) - No land
acquisition or relocation of people will be
necessary for proposed infrastructure
improvements
15EMP
- Mitigation Plan
- Monitoring Plan
- Proposed Environmental Training
- Monitoring Equipment
16Preparation of Mitigation Plan for a
site-specific EMP
Earth Town wastewater collection and treatment
infrastructure
17Preparation of Mitigation Plan for a
site-specific EMP contd
Participants will be asked to develop the
Environmental Mitigation Plan for proposed
municipal infrastructure investments in the Earth
Town