EMO Conference
September 2007
2
Historical Overview
  • In 1895, a railroad bridge was 500 feet south of
    the existing Flagler Memorial Bridge Mrs.
    Flagler was tired of hearing the train.
  • In 1902, a new railroad bridge was built just
    south of the current location.
  • The existing bridge was open to vehicular only
    traffic in 1938.

3
(No Transcript)
4
Rehabilitation
  • Rehabilitation of the existing bridge was an
    important consideration. Many people in the
    community were hopeful that the existing bridge
    could be rehabilitated and a new bridge avoided.

5
Flagler Memorial Bridge
  • The existing bridge was open to traffic in 1938
  • The existing bridge was expected to last 50 years
  • The June 30, 2006 Bridge Inspection Report
  • - Structurally Deficient
  • - Sufficiency rating of 32.4
  • - Functionally Obsolete

6
(No Transcript)
7
Existing Bridge Structurally Deficient
x
x
x
8
Existing Bridge Structurally Deficient
x
x
x
9
Existing Bridge Conditions
10
Existing Bridge Conditions
11
Existing Bridge Conditions
12
Existing Bridge Functionally Obsolete
13
Public Involvement Program
  • Educate the public about the condition of the
    existing bridge
  • Use the Bridge of Lions St. Augustine to help
    explain rehabilitation
  • Show the cost information, time frame and details
    to rehabilitate

14
Bridge of Lions St. Augustine, FL
15
Bridge Rehabilitation Project
BRIDGE OF LIONS ST. AUGUSTINE, FLORIDA
16
Stakeholder Meetings
Palm Beach Civic Association One Watermark
Tower Cultural Resource Committee Town of Palm
Beach City of West Palm Beach
17
Temporary Bridge Optionsfor Flagler Memorial
Bridge
Option 2
Option 1
18
Temporary Bridge Options
Option 2
Option 1
19
Temporary Bridge Option
Option 1
20
Public Approval
  • Public buy-in for a new bridge

21
Bridge Alternatives
  • No Build (do nothing but periodic maintenance)
  • Rehabilitation
  • (1) Low-Level Bascule (21 feet of clearance _at_
    ICW)
  • (2) Mid-Level Bascule (30 feet of clearance _at_
    ICW)
  • (3) High-Level Fixed (65 feet of clearance _at_
    ICW)

22
Bridge Alternatives
  • No Build (do nothing but periodic maintenance)
  • Rehabilitation
  • (1) Low-Level Bascule (21 feet of clearance _at_
    ICW)
  • (2) Mid-Level Bascule (30 feet of clearance _at_
    ICW)
  • (3) High-Level Fixed (65 feet of clearance _at_
    ICW)

23
Bridge Alternatives
  • No Build (do nothing but periodic maintenance)
  • Rehabilitation
  • (1) Low-Level Bascule (21 feet of clearance _at_
    ICW)
  • (2) Mid-Level Bascule (30 feet of clearance _at_
    ICW)
  • (3) High-Level Fixed (65 feet of clearance _at_
    ICW)

24
Existing Intersection with Flagler Drive
25
New Bridge Location Option A Same as Existing
BridgeConstruction Phasing
Alternative 1A and 2A BRIDGE OVER FLAGLER DRIVE
WITH RAMPS TO FLAGLER DRIVE
26
Alternative 1A and 2A (at grade)
Alternative 1A and 2A WITH FLAGLER DRIVE AT GRADE
CONCEPT (same location as existing bridge)
27
Alternative 1B and 2B (with ramps)
Alternative 1B and 2B BRIDGE OVER FLAGLER DRIVE
WITH RAMPS TO FLAGLER DRIVE (new bridge to the
south of the existing bridge)
28
Alternative 1B and 2B (at grade)
Alternative 1B and 2B WITH FLAGLER DRIVE AT GRADE
CONCEPT (new bridge to the south of the existing
bridge)
29
Option B Phased construction to the south
Phase 2 Construction
60 of proposed new bridge
30
Option B Phased construction to the south
Phase 2 Construction
PHASE 2
60 of proposed new bridge
31
Option B Phased construction to the south
Phase 3 Construction
Remainder of existing bridge removed
PHASE 3
32
Option B Phased construction to the south
Phase 4 Construction
PHASE 4
Remaining 40 of proposed bridge is completed
33
Flagler Drive looking South at existing
Flagler Memorial Bridge
Proposed At-Grade Intersection with
Flagler Drive
34
Flagler Drive looking North at existing Flagler
Memorial Bridge
Proposed At-Grade Intersection with
Flagler Drive
35
Project Schedule
The schedule shown above is for the Flagler
Memorial Bridge and Southern Boulevard Bridge
projects. The schedule is subject to change as
the projects progress.
36
Contact
  • FDOT Project Manager
  • Joshua Salazar, E.I.
  • FDOT District Four
  • 3400 West Commercial Boulevard
  • Fort Lauderdale, Florida 33309-3421
  • (954) 777-4635
  • Toll Free (866) 336-8435 extension 4635
  • joshua.salazar_at_dot.state.fl.us
  • www.flaglermemorialbridgepdestudy.com

37