Title: Natural Gas in Mexico: Policy
1Natural Gas in MexicoPolicy Regulation
- The Future of Natural Gas Markets in North
America - The Baker Institute, Rice University
- Francisco Xavier Salazar Diez de Sollano
- Chairman, CRE
- November 16, 2007
2Legal framework
3Institutional roles
41995 reform
Exploration
Production
Processing
FHS
Transport
Storage
Distribution
Sales
Exploration
Production
Processing
FHS
Transport
Storage
Distribution
Sales
Reserved to State
Regulated by CRE
Open to private investment
5Number of distribution users
6Accumulated investment
7Private open access pipelines
Does not consider PGPB 8,704 Km
8Investment in transport
9Pending issues after reform
- Upstream promote more investment competition
- Transport a new model to expand and give
redundancy to the system - Institutional changes
- Coherent price framework in the sector
- Strengthening of the regulator
10Natural gas balance 1995-2005
11Trade balance 1995-2005
12Natural gas historic consumption
13Natural gas demand in 2006
- According to the Ministry of Energy(1), natural
gas demand was 6.549 bcf/d in 2006 . - 48 corresponded to the oil sector 35.7 to the
power sector 14.6 to the industry, and 1.6 to
residential and other services. - Natural gas demand is expected to increase at an
overall annual rate of 3.9 over the next 10
years. -
- (1) Prospectiva del mercado de gas natural
2006-2015
14Natural gas integration
- The US and Canada are highly interconnected
through several pipelines with a 10.89 bcf/d
cross-border capacity . - Mexico and the US are also interconnected in 15
different points along the border with a 3.41
bcf/d de capacity.
15North Americas gas picture
162007-2015 consumption forecast
17Natural gas for power plants
- Power forecasts 2007-2015
- 4.8 annual demand growth rate (from 208.3 TWh in
2007 to 305 TWh in 2015) - 24 GW of new capacity are required to meet demand
(approximately 49 of current capacity) - Combined cycle power plants represent 45.7 of
the total capacity to be installed during 2008
2015. - This implies a 7.3 average annual growth rate of
natural gas for power over the next decade.
18How to face increasing demand?
- Continue promoting private investment in
- Development of LNG terminals along both the
Pacific and the Gulf coasts - Pipeline infrastructure both to strengthen
cross-interconnections and access to new LNG
plants. - Start exploiting coal bed methane reserves.
- Focus Pemexs investment in areas of paramount
interest such as exploration and production of
oil and gas.
19Natural gas balance 2007-2015
20Natural gas balance 2007-2015
21National trade balance 2007-15
22LNG regulation key dates
- 1994, 1995
- The Congress and government open downstream
activities to private investment. - 2002
- CRE published NOM-EM-001-SECRE (temporary
standard). - CRE received 5 permit applications (Marathon,
Sempra, Shell Baja, Shell - Altamira and
Chevron Texaco). - April 2003
- Marathon was granted the first LNG permit.
- July 2003
- CRE granted 2 LNG permits to Shell (Baja
California and Altamira). - Nov 2004
- CRE published NOM-013-SECRE-2004 for LNG.
-
23LNG permits granted by CRE
24Developing LNG terminals
- A predictable and transparent regulation gives
investors and developers the flexibility to
structure their projects in a variety of ways - Terminal Developers (TD) can participate in
acquisition of LNG through different schemes - TD can sign long-term contracts with utilities
and shippers and/or assign all or a fraction of
the terminal capacity to a marketing function - Shippers can arrange for their LNG deliveries or
have the terminal/marketer do it.
25Mexicos LNG map
26Terminal LNG de Altamira
- Terminal LNG de Altamira (Shell-Total-Mitsui)
permit was the result of a CFE bid for LNG. - Investment was around 400MM.
- Plant description
- 2 full containment tanks (300,000 m3 LNG
capacity) - Withdrawal capacity 0.5 0.67 bcf/d
- Dock and mooring installations for up to 160,000
m3 LNG tankers. - Plant started operations on 09/30/2006.
27Energía Costa Azul (ECA)
- Located in Ensenada, Baja California, project is
owned by Sempra LNG. - Current customers
- Sempra LNG 50
- Shell 50
- Project description
- 2 full containment storage tanks (320,000 m3 LNG
capacity) - 1 bcf/d withdrawal capacity
- Mooring platform allows for up to 220,000m3 LNG
tankers. - Investment 875MM.
- Start of operations Q1 2008.
28ECA Expansion
- Project description
- 2 more 160,000 m3 tanks (640,000 m3 total LNG
storage capacity) - 2.6 bcf/d withdrawal capacity
- 1 additional mooring platform with capacity for
up to 250,000 m3 tankers - Start of construction, 2008
- Start of operation, 2012.
29Sempras crossborder system
30CFEs Manzanillo LNG Project
- Drivers
- CFEs growing natural gas demand for new combined
cycle plants in the region - Environmental problems with fuel oil power plant
in Manzanillo - Uncertainty on regional supply.
- Project separates gas supply from the LNG
facility.
31LNG supply by Repsol
- CFEs bid was awarded to Repsol
- Gas will come from Peru
- Pricing formula (USD/mmBTU) for the bid
- P 0.91HH - K
- Repsols K was 0.03
- Contract duration 15 3 more years if agreed by
both parties.
32LNG supply schedule
Source IPD Latin America based on CFE data
33LNG terminal bid
- Description
- 2 tanks (300,000 m3 LNG capacity)
- Regasification capacity 0.5 bcf/d
- Potential expansion for one more tank.
- Port facilities will be a responsibility of CFE.
34Puerto Libertad Project
- Terminal GNL de Sonora (TGNLS) is a joint venture
project by El Paso/DKRW (50/50). - Preliminary engineering has been completed.
- Environmental permits were granted by SEMARNAT in
November and December of last year. - In process of applying for other local and
federal permits. - Currently in talks and negotiations with
potential LNG suppliers in the pacific basin. - Once LNG supplies are secured, TGNLS will apply
for LNG plant and transport permits with CRE.
35Project location and description
- 3 tanks (540,000 m3 total LNG capacity)
- 1 bcf/d regasification capacity
- Dock and mooring installations for LNG tankers
- Pipeline Approx. 760 km along Sonora
- Future Pipelines
- New EPNG pipeline
- Current pipelines in Mexico
- Existent EPNG pipelines in USA
- Power plant
36Other LNG Projects
- Yucatán
- Project aims to gasify the peninsula and secure
future supply for CFE - Estimated capacity would be around 1 bcm/yr or 1
bcf/d. - Topolobampo
- Project would be anchored by new CFE gas projects
in the northwest. - Off shore projects
- Both are linked to underground storage projects
and would fit perfect for spot cargoes - The north one has been proposed by Terranova
(Cheniere Energy) and could use a new transport
line from the Tamaulipas coast to Nuevo León and
Texas - The south one would use Tuzandeptl salt dome
storage.
37Mexicos LNG map
38Transport development in Mexico
- As a result of the 1995 reform, the private
sector has built over 2,700 km of gas pipelines,
mostly anchored by CFE or PEMEX. - However, a vigorous expansion of the system that
would either bring redundancy or serve new
markets not anchored by CFE or PEMEX has faced
problems because - Users have forced government interventions and
regulation override, both on natural gas and
substitutes (high risk for new investment) - Under current state of development, the current
transport model is not the best option (high
tariffs derived from new investment).
39Problems with current model
- Under the current model any private investment
has to be paid entirely by the new users of it,
even if it brings benefits to the existing users.
- This makes cost prohibitive any expansion related
to redundancy or development of new markets. - Besides these general model inconveniences,
current PEMEX tariff model has some other
problems like - Allows for transport arbitrage and price
inconsistency derived from several possible
injection-extraction routes serving the same
consumption zone - Complicates discussion on allocation and degree
of potential rolled-in investments.
40Towards a new model
- In order to facilitate expansions and redundancy
to the system, PEMEX, SENER and CRE have been
working on a model with the following general
characteristics - A new National Integrated System (SNI) will be
created - This system will comprehend the National Pipeline
System (SNG) and other interconnected private
systems that meet certain criteria - Roll-in will be used to facilitate expansions and
redundancy.
41General description of the model
Current modelIncremental costs(No Roll-in)
New modelRoll-In through national and zonal
charges
SNG
National Injection Charge
Zonal Extraction or Transit Charge
SNI
All SNI users pay part of the costs derived from
the integration of non SNG systems
Users of the SNI zone where investment is located
pay the other part of the costs derived from the
integration of non SNG systems
Private systems
42Current SNG transport zones
43Changes to PEMEX model
Norte
Ciudad Juárez
Chihuahua Importación
Chihuahua Norte
Anáhuac
Chihuahua
Delicias
Cd. Camargo
Jiménez
Monclova
Laguna del Rey
Chihuahua Sur
Monterrey
Argüelles
Reynosa
Gómez Palacio
Matamoros
Torreón
Los Ramones
Saltillo
Los Indios
Durango
Golfo
Linares
Altamira
Cd. Madero
San Luis Potosí
Pacífico
Guadalajara
Poza Rica
Tlalchinol
Tuxpan
Poza Rica
Salamanca
Punta de Piedra
Tula
Sur
Toluca
Sta. Ana
Morelia
Pachuca
Uruapan
Cempoala
Venta de Carpio
Veracruz
DF
Puebla
La Venta
Centro
L. Cárdenas
Villa Hermosa
T. Blanca
Cd. Pemex
Centro
Matapionche
Cárdenas
Cactus y Nuevo Pemex
Mendoza
Minatitlán
44Price consistency
Norte
LNG
US Imports
Golfo
Where i s for Sur g for Golfo c for Centro r for
Norte o for Occidente
Domestic Production
Centro
Sur
Occidente
45Norte
Golfo
Centro
Sur
Occidente
46Integration example
SNG Gasoductos del Bajío (GDB)
Transport charges paid by users
Aguascalientes, gas coming from Sur Zone
Base
13.14 Pesos/Gjoule
Centro
Golfo
Sur
Pacifico
Nacional
GDB
National Injection
Pacifico Extraction
8.84 Pesos/Gjoule
New model
Centro
Golfo
Sur
Pacifico
Nacional
Valtierrilla, gas coming from Sur Zone
Base
8.53 Pesos/Gjoule
Centro
Golfo
Sur
Pacifico
Nacional
National Injection
Pacifico Extraction
8.84 Pesos/Gjoule
New model
Centro
Golfo
Sur
Pacifico
Nacional
47The Permanent Regime
- Besides the new model, a key issue related to the
transport system is the final implementation of
the so-called permanent regime. - Benefits
- It will allow open access to SNG
- It will foster competition
- It will promote an efficient use of the system
and allow a fair allocation of the capacity - It will send the proper signals for the expansion
of the system.
48Conclusions
- Demand for natural gas in Mexico has been growing
and will continue to grow faster than local
production in the following years - Due to the fact that both Mexico and the US are
net importers and are interconnected, LNG becomes
critical for security of supply in both
countries - Both already existing and proposed LNG projects
will help to - Satisfy existing demand growth in both countries
- Bring natural gas to zones in Mexico where there
is no supply at the moment - Avoid large fluctuations in price.
- LNG projects will require new pipelines in the
zone - Other measures such as exploiting coal bed
methane reserves in Mexico would also help in
satisfying growing demand.
49Challenges
- In order to take full advantage of an integrated
energy market, Mexico should - Openly discuss legislative bills that would allow
for more investment and competition in the
upstream sector - Stick to policies that allow prices to reflect
market conditions and avoid price controls
(strengthening the regulator) - In the absence of constitutional autonomy granted
to the regulator, support regulatory measures
aimed to promote an efficient use of
infrastructure and secure new investments (e.g.
natural gas transport permanent regime) - Implement administrative measures addressed to
unbundling of monopolistic activities and
competition within the state owned companies.
50Thanks!