HIRLAM - PowerPoint PPT Presentation

1 / 18
About This Presentation
Title:

HIRLAM

Description:

HIRLAM. Use of the Hirlam NWP Model. at Met ireann (Irish Meteorological Service) ... Compute nodes in 3x3 2-dimensional torus [Dolphin cards] ... – PowerPoint PPT presentation

Number of Views:71
Avg rating:3.0/5.0
Slides: 19
Provided by: Met104
Category:
Tags: hirlam | torus

less

Transcript and Presenter's Notes

Title: HIRLAM


1
HIRLAM Use of the Hirlam NWP Model at Met
Éireann (Irish Meteorological Service) (James
Hamilton -- Met Éireann)
2
  • MAIN EVENTS SINCE LAST MEETING
  • REPLACEMENT OF COMPUTER SYSTEM
  • Collaboration agreement with ICHEC
  • ICHEC Irish Centre for High-End Computing
  • CHANGE FROM HIRLAM-5 to HIRLAM-7
  • Better model and higher-resolution

3
  • IRISH CENTRE FOR HIGH-END COMPUTING
  • ICHEC
  • www.ichec.ie
  • 'Bringing Capability Computing to the Irish
    Research Community'
  • SFI Science Foundation Ireland
  • HEA Higher Education Authority
  • HARDWARE
  • Shared memory system Bull Novascale NS6320
  • Distributed memory system IBM eServer 1350

4
  • IRISH CENTRE FOR HIGH-END COMPUTING
  • HARDWARE
  • Distributed memory system IBM eServer cluster
    1350 consisting of 476 IBM e326 compute nodes
    with 20TB of tightly integrated high-performance
    SAN based around an IBM DS4500
  • SuSe Linux 64-bit operating system
  • Met Éireann uses 32 dual nodes for main run out
    of an allocation of 48
  • Special execution queue

5
  • COMPUTER SYSTEM and VERSIONS of HIRLAM
  • ICHEC
  • Operational Hirlam 438x284 grid pts
    60-levels 15Km
  • Nested Hirlam 438x395 grid pts 60-level 5Km
  • LINUX PC
  • Hourly Hirlam 166x163 40-levels 15Km 20-min
    cutoff
  • LINUX Cluster Nine Twin Xenon Processors
    3.2GHz
  • Backup Hirlam 438x284 grid pts 31-levels
    15Km
  • ALL MODELS are HIRLAM version 7

6
  • OPERATIONAL HIRLAM ICHEC
  • HIRLAM 7 with 3DVAR
  • 3-Hour assimilation cycle with 48-hour forecasts
    every 6-hours
  • Rotated lat/long 0.15x0.15 grid with 438x284
    grid points
  • Hybrid eta coordinates with 60-levels backup
    has 31 levels
  • CBR vertical diffusion scheme Sundqvist
    condensation scheme
  • STRACO cloud scheme Savijarvi radiation scheme
  • Digital filter initialisation
  • Two time-level Semi-Lagrangian semi-implicit
    scheme
  • Use of frame boundaries from ECMWF

7

8
(No Transcript)
9
  • NESTED HIRLAM ICHEC
  • HIRLAM 7 with 3DVAR
  • Runs every 6-hours with 30-hour forecasts
    6-hour cycle
  • Rotated lat/long 0.05x0.05 grid with 438x395
    grid points
  • Hybrid eta coordinates with 60-levels no
    backup
  • CBR vertical diffusion scheme Sundqvist
    condensation scheme
  • STRACO cloud scheme Savijarvi radiation scheme
  • Digital filter initialisation
  • Two time-level Semi-Lagrangian semi-implicit
    scheme
  • Hourly boundaries from Hirlam operational model

10

11
  • HOURLY HIRLAM LINUX PC
  • HIRLAM 7 with 3DVAR
  • Runs every hour with 20-minute cutoff
  • Rotated lat/long 0.15x0.15 grid with 166x163
    grid points
  • Hybrid eta coordinates with 40-levels no
    backup
  • Runs on one hour cycle 3-hour forecast
  • Provides hourly analysis and short-range
    forecast
  • Used on Met Éireann public internet site
    www.met.ie

12

13
  • OPERATIONAL USES of HIRLAM
  • General Forecasting
  • Forecast guidance out to 48-hours
  • WAM wave model
  • Forecast 10-metre winds drive model ECWAM at
    ICHEC
  • Roadice Prediction System
  • Forecast parameters are used as first guess for
    human forecaster
  • SATREP
  • Overlay on satellite plots ZAMG SATREP analysis
    scheme

14
RESEARCH ACTIVITIES Better Specification of
B.C.s for NWP models Operational Implementation
of Nested System
15
  • LINUX CLUSTER mogall
  • Small experimental Linux-Cluster used as Backup
  • Dell PowerEdge 1750 Twin Xeon nodes rack
    mounted
  • 1 x Master node 2.8GHz, 4Gbytes
  • 9 x Compute nodes 3.2GHz, 2Gbytes
  • Compute nodes in 3x3 2-dimensional torus
    Dolphin cards
  • RedHat ES-3/WS-3 PGI compilers Intel compilers
  • Scali MPI connect, Scali TCP connect, Scali
    Manage
  • Original cluster had 6-nodes upgraded to
    9-nodes

16
  • LINUX CLUSTER mogall
  • Used as Backup for Operational Hirlam
  • Hirlam 7 with 3DVAR identical to operational
    system
  • Both ICHEC and mogall on same 15Km grid
  • ICHEC has 60 levels mogall has 31 levels

17
FUTURE PLANS . Expand area to North of
Greenland Look at use of higher resolution ECMWF
boundary files Investigate 4DVAR Assimilation of
satellite data ATOVS
18
Thank You
Write a Comment
User Comments (0)
About PowerShow.com