EWGLAM/SRNWP Annual Meetings 2005 SRNWP Business Meeting - PowerPoint PPT Presentation

About This Presentation
Title:

EWGLAM/SRNWP Annual Meetings 2005 SRNWP Business Meeting

Description:

... needs of General Numerical Weather Prediction (GNWP) over Europe' ... 20 weather services / 23 forecast products. Denmark HIRLAM 16 ECMWF 60h 0, 6, 12, 18 ... – PowerPoint PPT presentation

Number of Views:33
Avg rating:3.0/5.0
Slides: 51
Provided by: jean170
Category:

less

Transcript and Presenter's Notes

Title: EWGLAM/SRNWP Annual Meetings 2005 SRNWP Business Meeting


1
EWGLAM/SRNWP Annual Meetings 2005SRNWP Business
Meeting
Short-Range Numerical Weather Prediction
Programme
  • 5 October 2005
  • Ljubljana (Slovenia)

2
Agenda
  • The Network of Consortia
  • Programme OPERA Compositing necessary
  • EUCOS II (2007 2011) Action required
  • Soundings BUFR besides TEMP
  • STORMNET (Dominique)
  • Model comparison
  • Hub for high resolution precipitation
    observations
  • Dissemination of hourly SYNOPs
  • GPS Zenital Total Delays
  • SRNWP PEPS
  • Other points

3
Agenda
  • The Network of Consortia
  • Programme OPERA Compositing necessary
  • EUCOS II (2007 2011) Action required
  • Soundings BUFR besides TEMP
  • STORMNET (Dominique)
  • Model comparison
  • Hub for high resolution precipitation
    observations
  • Dissemination of hourly SYNOPs
  • GPS Zenital Total Delays
  • SRNWP PEPS

4
The Network of Consortia
  • HIRLAM
  • Denmark, Finland, Iceland, Ireland,Netherlands
    , Norway, Spain, Sweden
  • COSMO
  • Germany, Greece, Italy, Poland (Warsaw
    Branch), Romania, Switzerland
  • ALADIN
  • Austria, Belgium, France, Portugal,Bulgaria,
    Croatia, Czech Republic, Hungary,Moldova, Poland
    (Cracow Branch), Romania,Slovakia, Slovenia
  • ALADIN LACE
  • Austria, Croatia, Czech Republic,
    Hungary,Slovakia, Slovenia
  • UKMO
  • United Kingdom
  • 26 NWS are Members of the SRNWP Programme
    EUMETNET Member

5
Agenda
  • The Network of Consortia
  • Programme OPERA Compositing necessary
  • EUCOS II (2007 2011) Action required
  • Soundings BUFR besides TEMP
  • STORMNET (Dominique)
  • Model comparison
  • Hub for high resolution precipitation
    observations
  • Dissemination of hourly SYNOPs
  • GPS Zenital Total Delays
  • SRNWP PEPS
  • Other points

6
OPERA II
  • 2004-2006
  • Responsible Member FMI Project Manager
    Asko Huuskonen
  • Data hub at the Met Office rain. Also VAD and
    VVP (wind profiles).
  • From the OPERA Programme Decision, Point E
  • To compile a set of European reference product
    and quality algorithms.
  • Planned from the OPERA Programme was a European
    composite that the
  • Met Office would produce every day (00-24 UTC
    accumulated rain).
  • From the List of Decisions of the 23rd EUMETNET
    Council, 14th Dec. 2004
  • under OPERA
  • 20000 euro will be released to start the
    developments of the hub system,
  • excluding any work on compositing
  • Reason (Minutes Final Draft of C23, page 3)
  • rain accumulation products had a commercial
    value and, therefore,
  • ... would place the OPERA programme in
    competition with the private sector

7
Radar compositing is needed by the Short-range
NWP community for - validation and verification
of the precipitations of the meso-scale LAMs -
definition of better initial conditions by
assimilation of precipitations It would be a
waste of time and resources if the same work
(holding the radar data from the hub and making a
composite) should be done in several NWS.
Recommendation At the 12th Meeting of the SRNWP
Programme held the 5th of October 2005 in
Ljubljana, the NWS delegates passed the following
recommendation The European Short-Range NWP
community asks the EUMETNET Council to recall its
decision taken at its 23th Meeting (14th of
December 2004 in Reading) to exclude from the
OPERA Programme any work on compositing (Point
1 of the List of Decisions).
8
Agenda
  • The Network of Consortia
  • Programme OPERA Compositing necessary
  • EUCOS II (2007 2011) Action required
  • Soundings BUFR besides TEMP
  • STORMNET (Dominique)
  • Model comparison
  • Hub for high resolution precipitation
    observations
  • Dissemination of hourly SYNOPs
  • GPS Zenital Total Delays
  • SRNWP PEPS
  • Other points

9
Purpose of EUCOS
Agreed by EUMETNET Council in November
2000 EUCOS is the ground-based observing system
designed to serve the needs of General Numerical
Weather Prediction (GNWP) over Europe Aim of
the EUCOS preparatory phase (2000-2001) To
define an optimised design for a composite
observing system which would serve regional scale
numerical weather prediction requirements Aim
of present phase of EUCOS (2002-2006) Deployment
of this composite observing system. EUCOS
terminates the 31st of December 2006. A second
phase (2007-2011) is planed
10
(No Transcript)
11
The revised observing system
  • EUCOS considered that the experienced development
    and implementation these last years of new
    observing systems such as
  • - wind profilers
  • radar wind profiles (VAD and VVD)
  • and
  • - the massive growth of AMDAR
  • would allow to significantly reduce the number of
    upper-air soundings stations.

12
(No Transcript)
13

14
3 and 6 hourly AMDAR profile 2008 potential
15
Selected daily E-AMDAR profile coverage
16
(No Transcript)
17
(No Transcript)
18
Recommendation Considering that the Proposed
Revised Design presented in the Review of the
EUCOS Upper-Air Network Design of 18 May 2005
does not consider the observational requirements
needed for the high-resolution short-range NWP
models, the European Short-Range NWP community
asks the EUCOS Programme Board and the EUCOS
Advisory Group to significantly increased the
density of observations and to make sure that
this density remain sufficient at night. More
generally, the delegates of the 12th Meeting of
the SRNWP Programme held the 5th of October 2005
in Ljubljana ask that in the second phase of the
EUCOS Programme (2007-2011) the same attention,
priority and resources be given for the
observation of the meso-scale as it will be done
for the observation of the synoptic scale.
19
Agenda
  • The Network of Consortia
  • Programme OPERA Compositing necessary
  • EUCOS II (2007 2011) Action required
  • Soundings BUFR besides TEMP
  • STORMNET (Dominique)
  • Model comparison
  • Hub for high resolution precipitation
    observations
  • Dissemination of hourly SYNOPs
  • GPS Zenital Total Delays
  • SRNWP PEPS
  • Other points

20
Migration to Binary Code
  • BUFR code for dissemination of radiosonde data
    would permit
  • exact time of measurement
  • transmission of the actual sonde coordinates
    during ascent
  • higher vertical resolution data
  • simpler code (no A-, B-, C-, D-group)
  • Vaisala has indicated that his sonde and software
    are already able to provide the information in
    BUFR, but some implementation work is needed at
    the NWS.
  • The WWW Department of the WMO is making efforts
    to encourage migration to binary based code.
    Europe could play in this effort a leading role.

21
Recommendation At the 12th Meeting of the SRNWP
Programme held the 5th of October 2005 in
Ljubljana, the NWS delegates ask the EUMETNET
Coordinating Officer to take the necessary
administrative and technical steps in order to
promote between the European NWS the
dissemination on the GTS of the radiosonde data
in two formats in TEMP code and in BUFR code.
22
Agenda
  • The Network of Consortia
  • Programme OPERA Compositing necessary
  • EUCOS II (2007 2011) Action required
  • Soundings BUFR besides TEMP
  • STORMNET (Dominique)
  • Model comparison
  • Hub for high resolution precipitation
    observations
  • Dissemination of hourly SYNOPs
  • GPS Zenital Total Delays
  • SRNWP PEPS
  • Other points

23
Agenda
  • The Network of Consortia
  • Programme OPERA Compositing necessary
  • EUCOS II (2007 2011) Action required
  • Soundings BUFR besides TEMP
  • STORMNET (Dominique)
  • Model comparison
  • Hub for high resolution precipitation
    observations
  • Dissemination of hourly SYNOPs
  • GPS Zenital Total Delays
  • SRNWP PEPS
  • Other points

24
Model comparison
  • Three times in Council or ICWED Meetings our
    Directors have expressed the wish of a model
    comparison over Europe
  • It has to be cheap. Thus only our basic models
    will be compared
  • - LM (version run by the DWD)
  • - Aladin-France (Toulouse)
  • - HIRLAM (reference version at FMI)
  • - UM (North-Atlantic / Europe version)

25
Facts
  • Today the Met Office compares daily the
    precipitations of these 4 models over
    Great-Britain (24-hourly accumulated)
  • The Met Office has been chosen for this
    comparison as the task will consist in an
    extension of the above mentioned work

26
Plan
  • Verified will be from T0 to T48 at 6h
    intervals
  • - precipitations
  • - mean sea level pressure
  • - 2m temperature
  • - 10m wind
  • Scores for precipitations
  • - frequency bias
  • - equitable threat score
  • - log-odds ratio
  • - Hansen-Kuipers skill score

27
Results and Costs
  • Results
  • Monthly mean statistics will be calculated and
    published on the Met Office external internet
    site under password protection
  • Costs
  • The costs that will be submitted to the EUMETNET
    Council will amount to the salary of a scientist
    for 9 months per year

28
Agenda
  • The Network of Consortia
  • Programme OPERA Compositing necessary
  • EUCOS II (2007 2011) Action required
  • Soundings BUFR besides TEMP
  • STORMNET (Dominique)
  • Model comparison
  • Hub for high resolution precipitation
    observations
  • Dissemination of hourly SYNOPs
  • GPS Zenital Total Delays
  • SRNWP PEPS
  • Other points

29
Data hub for high resolution, non GTS,24-hourly
accumulated daily precipitations
  • The spatial density of the SYNOP precipitations
    is absolutely inadequate for the validation and
    verification of the very high resolution models
  • Creation of a data hub for precipitation
    observations as already done by EUMETNET at the
    Met Office for the radar, wind-profiler and GPS
    ZTD data (one stop chop strategy)

30
Situation today in Europe
Who is collecting today in Europe 24-hourly
accumulated high-resolution precipitation observat
ions? DWD (for Consortium COSMO) ECMWF (data
from the Members) EU Project ENSEMBLES EUROGRID
show-case (non yet accepted) Report in the SRNWP
web site http//srnwp.cscs.ch/Documents/HighResolu
tionPrecipitations.htm
31
Candidates
Two very good candidates DWD - does already
this work for the COSMO Members - collects
24-hourly accumulated precipitations from some
4500 stations ECMWF - receives the data from
the Members and associated Members - collects
24-hourly accumulated precipitations from some
17000 stations - makes gridded analyses
32
Agenda
  • The Network of Consortia
  • Programme OPERA Compositing necessary
  • EUCOS II (2007 2011) Action required
  • Soundings BUFR besides TEMP
  • STORMNET (Dominique)
  • Model comparison
  • Hub for high resolution precipitation
    observations
  • Dissemination of hourly SYNOPs
  • GPS Zenital Total Delays
  • SRNWP PEPS
  • Other points

33
Dissemination of hourly SYNOPs Action now
endorsed by EUCOS
34
(No Transcript)
35
(No Transcript)
36
Agenda
  • The Network of Consortia
  • Programme OPERA Compositing necessary
  • EUCOS II (2007 2011) Action required
  • Soundings BUFR besides TEMP
  • STORMNET (Dominique)
  • Model comparison
  • Hub for high resolution precipitation
    observations
  • Dissemination of hourly SYNOPs
  • GPS Zenital Total Delays
  • SRNWP PEPS
  • Other points

37
GPS Zenital Total Delays
  • At its 24th Meeting (April 2005), the EUMETNET
    Council adapted the E-GVAP Programme (EUCOS-GPS
    Water Vapour).
  • DMI as Responsible Member (Henrik Vedel)
  • The Met Office will run the data hub.
  • The Met Office already collects radar data (rain
    and winds) and wind profiler data.
  • gtgtgt the data hub strategy (one stop chop) begins
    to become effective

38
Agenda
  • The Network of Consortia
  • Programme OPERA Compositing necessary
  • EUCOS II (2007 2011) Action required
  • Soundings BUFR besides TEMP
  • STORMNET (Dominique)
  • Model comparison
  • Hub for high resolution precipitation
    observations
  • Dissemination of hourly SYNOPs
  • GPS Zenital Total Delays
  • SRNWP PEPS
  • Other points

39
(No Transcript)
40
(No Transcript)
41
SRNWP-PEPS
PEPS-Grid with a grid spacing of 0.0625 (7
km) covering Europe
The ensemble size depends on location and every
PEPS grid point has its own probability
distribution
42
Ensemble Products
43
Maximum Ensemble Size
depends on main run and meteorological parameter
Maximum Ensemble Size
44
Ensemble Mean
21/01/2005 00 UTC 06...30
45
21/01/2005 00 UTC 06...30
46
Cut-off times
SRNWP-PEPS runs operationally since December 2004
47
(No Transcript)
48
  • Validation
  • Comparison with COSMO-LEPS
  • Scoring probabilistic forecasts
  • Ensemble Calibration
  • Bayesian Model Averaging (BMA) Raftery et.
    al., 2005
  • BMA for precipitation

49
Thank you to the contributing Weather Services
!
50
Agenda
  • The Network of Consortia
  • Programme OPERA Compositing necessary
  • EUCOS II (2007 2011) Action required
  • Soundings BUFR besides TEMP
  • STORMNET (Dominique)
  • Model comparison
  • Hub for high resolution precipitation
    observations
  • Dissemination of hourly SYNOPs
  • GPS Zenital Total Delays
  • SRNWP PEPS
  • Other points
Write a Comment
User Comments (0)
About PowerShow.com