HIRLAM - PowerPoint PPT Presentation

About This Presentation
Title:

HIRLAM

Description:

HIRLAM. Use of the Hirlam NWP Model. at Met ireann (Irish ... Hybrid [eta] coordinates ... Hybrid [eta] coordinates with 24-levels. Analysis shown on ... – PowerPoint PPT presentation

Number of Views:36
Avg rating:3.0/5.0
Slides: 18
Provided by: gate86
Category:
Tags: hirlam | hybrid

less

Transcript and Presenter's Notes

Title: HIRLAM


1
HIRLAM Use of the Hirlam NWP Model at Met
Éireann (Irish Meteorological Service) (James
Hamilton -- Met Éireann)
2
  • COMPUTER SYSTEM and VERSIONS of HIRLAM
  • IBM RS/6000 SP 9-nodes each with 4-CPUs
  • Operational Hirlam 438x284 grid pts 31-levels
  • Nested Hirlam 222x210 grid pts 40-levels
  • LINUX PC Twin Xeon Processors 2.0Ghz
  • Backup Hirlam 218x144 31-levels
  • LINUX PC Twin Xeon Processors 500Mhz
  • Hourly Hirlam 97x98 grid pts 24-levels

3
  • OPERATIONAL HIRLAM IBM RS/6000 SP
  • HIRLAM 5.0.1 with 3DVAR
  • 3-Hour assimilation cycle with 48-hour forecasts
    every 6-hours
  • Rotated lat/long 0.15x0.15 grid with 438x284
    grid points
  • Hybrid eta coordinates with 31-levels
  • CBR vertical diffusion scheme Sundqvist
    condensation scheme
  • STRACO cloud scheme Savijarvi radiation scheme
  • Digital filter initialisation
  • Two time-level Semi-Lagrangian semi-implicit
    scheme
  • Use of frame boundaries from ECMWF

4

5
(No Transcript)
6
  • BACKUP HIRLAM LINUX-PC Dual 2.0Ghz CPU
  • HIRLAM 4.3.5 with OI-Analysis
  • 3-Hour assimilation cycle with 48-hour forecasts
    every 6-hours
  • Rotated lat/long 0.30x0.30 grid with 218x144
    grid points
  • Hybrid eta coordinates with 31-levels
  • SAME AREA AS OPERATIONAL HIRLAM

7

8
  • NESTED HIRLAM IBM RS/6000 SP
  • HIRLAM 6.0.0 with 3DVAR
  • 3-Hour assimilation cycle with 24-hour forecasts
    every 6-hours
  • Model runs at intermediate hours 03Z, 09Z,
    15Z, 21Z
  • Rotated lat/long 0.12x0.12 grid with 222x210
    grid points
  • Hybrid eta coordinates with 40-levels
  • Kain-Fritsch/Rasch-Kristjansson
    convection/condensation scheme
  • ISBA surface scheme
  • Output post-processed with MOS

9
(No Transcript)
10
  • HOURLY HIRLAM ... LINUX-PC Dual 500Mhz CPU
  • HIRLAM 4.3 with OI Analysis
  • Hourly assimilation cycle with hourly analysis
    and 3-hour forecast
  • Rotated lat/long 0.15x0.15 grid with 97x98 grid
    points
  • Hybrid eta coordinates with 24-levels
  • Analysis shown on public web-site

11

12
  • OPERATIONAL USES of HIRLAM
  • General Forecasting
  • Forecast guidance out to 48-hours
  • WAM wave model
  • Forecast 10-metre winds used to drive model
  • Roadice Prediction System
  • Forecast parameters are used as first guess for
    human forecaster
  • SATREP
  • Overlay on satellite plots ZAMG SATREP analysis
    scheme

13
RESEARCH ACTIVITIES Better Specification of
B.C.s for NWP models Operational Implementation
of Nested System Regional Climate Analysis
Modelling Prediction Centre Community Climate
Change Consortium for Ireland RCAMPC and C4I
14
(No Transcript)
15
(No Transcript)
16
  • FUTURE PLANS
  • Purchase small experimental Linux-Cluster
  • Budget of approx Euro 50k
  • Use as backup for main computer Operational
    Hirlam
  • Gain experience with Linux clusters
  • Investigate MOS/Neural-Nets for Post-Processing
  • Use Hirlam as input to Point Data-Base

17
Thank You
Write a Comment
User Comments (0)
About PowerShow.com