Ares V Payload Development and Accommodation - PowerPoint PPT Presentation

1 / 3
About This Presentation
Title:

Ares V Payload Development and Accommodation

Description:

Design must not prevent the use of radioactive power source ... Titian orbiter ? Neptune Triton orbiter? Humans to NEOs - ISRU needs. Others? ... – PowerPoint PPT presentation

Number of Views:71
Avg rating:3.0/5.0
Slides: 4
Provided by: MWa55
Category:

less

Transcript and Presenter's Notes

Title: Ares V Payload Development and Accommodation


1
Ares VPayload Development and Accommodation
  • Nuclear Accommodation and Certification
  • Design must not prevent the use of radioactive
    power source
  • Start early in certification (7 years) NEPA
    Compliance
  • On pad cooling (heat rejection) and late
    integration
  • Future reactors
  • Provide multi-spacecraft payload capability
  • Standard Altair adapter
  • Generic interface definition
  • ESPA-like
  • Shroud load-sharing
  • Provide late payload access
  • Centaur fueling - other upper stage
    configurations
  • Late maintenance - pre-launch failures dont
    preclude shroud interior mobility
  • Nuclear powered payloads

2
Ares VPayload Development and Accommodation
  • Provide cleanliness, purges,
  • Planetary protection - current launcher
    considerations
  • N2 purges
  • Storable propellant handling like NTO, Hydrazine
    for long missions
  • Hazardous material monitoring, handling
  • Venting
  • Keep launch loads at todays levels for current
    launch vehicles - not worse than Delta IV (check)
    - acoustics, vibration, thermal
  • High C3 burns - 500 second limit may impact deep
    space missions
  • What are the limits of the qual program
  • Options for high C3 planetary missions
  • Payload Accommodation
  • Umbilicals for active payloads
  • Data
  • Power

3
Ares VPayload Development and Accommodation
  • Volume potential issue
  • Centaur upper stage fits in shroud (4 m left)
  • Aeroshell for planetary landers
  • Ares V is enabling - Cheap dumb mass examples
    (c.g. considerations)
  • Propellant, Copper, Solar Arrays, Shielding
  • Use shroud as heat shield for human missions
    (existing DRM)
  • Launch Dates
  • 2026-2028 - gravity assist for interstellar
    mission (2015 even better)
  • Titian orbiter ?
  • Neptune Triton orbiter?
  • Humans to NEOs - ISRU needs
  • Others?
  • ESMD and SMD should continue and enhance
    communication
Write a Comment
User Comments (0)
About PowerShow.com