NRIC Council Meeting - PowerPoint PPT Presentation

1 / 13
About This Presentation
Title:

NRIC Council Meeting

Description:

Analysis of Effectiveness of Best Practices Aimed at E911 and Public Safety ... 'The Council shall present a report containing its analysis of ... Tandem ... – PowerPoint PPT presentation

Number of Views:40
Avg rating:3.0/5.0
Slides: 14
Provided by: Nex84
Category:
Tags: nric | council | meeting | tandem

less

Transcript and Presenter's Notes

Title: NRIC Council Meeting


1
NRIC Council Meeting
  • Focus Group 1C
  • Analysis of Effectiveness of Best Practices Aimed
    at E911 and Public Safety
  • September 23, 2004

2
Focus Group 1C Charter
  • The Council shall present a report containing
    its analysis of 63.100 outages related to
    911/E911 and the Best Practices that are most
    applicable to E911 outages. The report shall
    also identify E911 architecture vulnerabilities.

3
Process
A
B
C
4
Outages Reviewed Qualified
  • C.F.R. 63.100 Reported Outages affecting 911
    between January 2002 and March 2004
  • FCC data 84 outages
  • NRSC summary 80 outages
  • Focus Group 1C review 76 outages
  • Eliminated reported outages that
  • Did not affect 911
  • Were finally determined to not meet 63.100
    reporting criteria

5
Definitions Root Cause and Direct Cause
  • The Direct Cause is defined as the event, action,
    or procedure that triggered the incident
  • e.g., Cable damaged by falling tree
  • Direct Cause Cable Damage
  • The Root Cause is defined as the key problem,
    which once identified and corrected prevents the
    same or a similar problem from recurring
  • e.g., switch was improperly configured to allow
    auto reroute of calls
  • Root Cause Service Provider Procedural Error
  • - from Outage 02-016

6
Results in Brief Outages by Direct Cause
7
Results in Brief Outages by Root Cause
8
Results in Brief Outage Categories
9
Results in Brief Facility Failure
10
Results in Brief 911/E911 Best Practices
  • 97 out of the 776 existing NRIC Best Practices
    from NRIC I-VI were identified as being
    applicable specifically to 911/E911 outages and
    Public Safety
  • The Best Practices identified fell into the
    following categories
  • Diversity/Redundancy
  • Contingency/Emergency Planning
  • Data Assurance/Traffic Management
  • Media/Public Awareness
  • Emergency Management
  • Prevention
  • Cooperation/Communications with Emergency Service
    Entities
  • Future 1C efforts will evaluate the effectiveness
    of 911/E911 and Public Safety Best Practices

11
Results in Brief 911/E911 Architecture
Vulnerabilities
  • Five areas of the 911/E911 architecture were
    identified as key vulnerabilities when analyzed
    against the outage data
  • Facility
  • Affected by 47 of the 911 outages
  • Power Elements
  • Affected by 16 of the 911 outages
  • CCS (Common Channel Signaling)
  • Affected by 15 of the 911 outages
  • Local Switch Tandem Switch
  • Affected by 9 and 4, respectively for a total
    13 of the 911 outages
  • DCS (Digital Cross-Connect System)
  • Affected by 7 of the 911 outages

12
Network Diagram
13
Focus Group 1C Next Steps
  • Group outages by network components
  • By outage, determine most relevant best practices
  • Link relevant best practices to network component
  • Develop recommendations on which best practices
    to emphasize
Write a Comment