Title: MECHANICAL ENGINEERING FOR SYSTEM BALANCE


1
MECHANICAL ENGINEERING FOR SYSTEM BALANCE
  • ASHRAE MEETING 2/15/2007 NORTHERN NEVADA CHAPTER
    126
  • MATT BRENNAN, TBE

2
TRIPLE DUTY VALVES
  • FUNCTIONS
  • SIZING
  • INSTALLATION

3
FUNCTIONS
  • SHUTOFF VALVE
  • FLOW CONTROL
  • CHECK VALVE
  • FLOW METERING
  • STRAIGHT PATTERN VALVE CONVERTIBLE TO A RIGHT
    ANGLE VALVE

4
SIZING!
  • DO NOT ASSUME THIS TO BE A LINE SIZE VALVE.
  • DO INCLUDE A SCHEDULE FOR TDVs, INCLUDE VALVE Cv
    GPM 100 STEM RISE.

5
SIZING!
6
SIZING!
  • AHSRAE 90.1 RECOMMENDS, IF THIS IS THE PRIMARY
    SYSTEM VALVE AND IS SET LOWER THAN 50 STEM RISE
    THAT THE IMPELLER BE TRIMMED TO THE NECESSARY
    DESIGN FLOW. THIS WILL REDUCE ELECTRICAL ENERGY
    CONSUMPION AND COMPLY WITH THE NATIONAL ENERGY
    BUILDING CODE STANDARD.

7
SIZING!
  • MOST MANUFACTURES REQUIRE A MINIMUM STEM RISE OF
    50 WITH A MINIMUM READING OF 3 FEET OF PRESSURE
    DROP AND MOST HAVE A MAXIMUM OF 25 FEET OF
    PRESSURE DROP.

8
INSTALLATION
  • DETAILS---DETAILS---DETAILS
  • INCLUDE IN YOUR DETAIL SECTION A DETAIL THAT
    SHOWS THE TRIPLE DUTY VALVE INSTALLED AT A
    MINIMUM OF 5 PIPE DIAMETERS IN THE STAIGHT DOWN
    STREAM AND UPSTREAM OF THE VALVE. INCLUDE TEXT TO
    COMPLY WITH VALVE MANUFACTURES INSTALLATION
    RECOMMENDATIONS.

9
DETAILS!
10
DETAILS!
11
DETAILS!GAUGE MANIFOLD
12
OPTIONS
  • INSTALL A FLOW VENTURI OR CIRCUIT SETTER WITH A
    CHECK VALVE.
  • VERY ACCURATE

13
OPTIONS
  • WHEN USING VARIABLE PUMPING VIA TRANSDUCER AND
    VFD, DO NOT REQUIRE A TDV, ALL THAT IS NEEDED IS
    A CHECK VALVE AND ISOLATION VALVE.

14
DETAILS!
  • SHOW PETES PLUGS AS THE FIRST DEVICE AT THE
    ENTERING AND LEAVING CONNECTIONS OF ANY HEAT
    EXCHANGER! IE COIL, CHILLER, HX, BOILER, etc.

15
DETAILS!
  • HAVE PETES PLUGS INSTALLED NEXT TO ALL
    TEMPERATURE AND PRESSURE CONTROL SENSORS FOR
    CALIBRATION.

16
CIRCUIT SETTERS
17
SIZING!
  • DO NOT ASSUME THAT THIS IS TO BE A LINE SIZE
    DEVICE.
  • IN MOST CASES ON SMALLER COILS (REHEAT), LINE
    SIZE IS TOO LARGE.

18
SIZING!
19
INSTALLATION
  • HAVE DETAIL SECTION SHOW THE CORRECT AMOUNT OF
    STRAIGHT PIPE DIAMETERS BEFORE AND AFTER THE
    BALANCE VALVE.
  • INCLUDE A NOTE TO COMPLY WITH THE BALANCE VALVE
    MANUFACTURES RECOMMENDATIONS.

20
INSTALLATION
21
INSTALLATION
22
VAV BOXES
  • TYPE
  • SCHEDULE
  • SIZING

23
SERIES FAN POWERED
  • FAN HANDLES ALL AIR THAT SERVES THE SPACE.

24
PARALELL FAN POWERED
  • FAN ONLY HANDLES RETURN PLENUM AIR THAT GOES TO
    THE SPACE.

25
VAV WITH REHEAT
  • DAMPER CONTROLS ALL AIR THAT GOES TO THE SPACE.
    NO FAN.

26
SCHEDULE
  • NUMBER EACH VAV WITH ITS OWN TAG NUMBER.
  • DO NOT SELECT 6 OR 7 TERMINALS AND SCHEDULE THEM
    WITH GENERAL INFORMATION.
  • INCLUDE SPECIFICALLY PRIMARY AIR MAXIMUM,
    MINIMUM, REHEAT AND FAN CFM.
  • INCLUDE AREA SERVED AND ROOM s.

27
SCHEDULE
28
SIZING!
  • ALWAYS START BY SELECTING BOX SIZE TO PRODUCT
    2000 FPM VELOCITY 15 AT THE BOX INLET WHEN AT
    MAXIMUM COOLING CFM.

29
SIZING!
  • THIS WILL MAKE THE BOX MORE CONTROLABLE AT THE
    MINIMUM SET POINT AS MOST BOX GRAPHS AND
    CONTROLERS CANNOT CONTROL BELOW 0.03 IN. WC.
    PRESSURE DROP. IT WILL ALSO MAKE THE BOX MORE
    ACCURATE AT BOTH ENDS.

30
SIZING!
31
SIZING!
  • AN OVERSIZED BOX WILL CAUSE THE CONTROLER TO BE
    UNCALIBRATABLE AT THE MINIMUM CFM SET POINT AS
    WELL AS CAUSE FLOW HUNTING AND POOR HEAT TRANSFER.

32
SIZING!
  • AN UNDERSIZED BOX WILL REQUIRE THE SUPPLY DUCT
    STATIC PRESSURE SET POINT TO BE RAISE TO A LEVEL
    THAT CONSUMES MORE ENERGY THAN NECESSARY.

33
SPORTING CLAY SHOOT
  • ASHRAE FUNDRAISER
  • APRIL 15, 2007
  • SAGE HILL CLAY SPORTS
  • 100 SPORTING CLAYS
  • SHOTGUN RAFFLE
  • BBQ LUNCH
  • FUN FOR ALL