ENGINEERING PROCESS MONITORING FOR CONTROL ROOM OPERATION - PowerPoint PPT Presentation

About This Presentation
Title:

ENGINEERING PROCESS MONITORING FOR CONTROL ROOM OPERATION

Description:

Gestion Technique d'une Panne Majeure. GTPM - Objectives ... Gestion Technique d'une Panne Majeure - GTPM. Control Room Representatives. PCR, TCR, MCR, (CRN) ... – PowerPoint PPT presentation

Number of Views:88
Avg rating:3.0/5.0
Slides: 11
Provided by: mario75
Category:

less

Transcript and Presenter's Notes

Title: ENGINEERING PROCESS MONITORING FOR CONTROL ROOM OPERATION


1
ENGINEERING PROCESS MONITORING FOR CONTROL ROOM
OPERATION
GTPMGestion Technique dune Panne Majeure
Mario Bätz CERNST-MO-TC
2
GTPM - Objectives
  • Improvement of collaboration and understanding
    PCR-TCR (roles resp.)
  • Reduction of the SPS restart time after major
    breakdown
  • Monitoring documents for the SPS restart (logic
    of SPS restart, process description, instructions
    etc.)
  • A structured method, which can be generalized to
    future projects

3
Gestion Technique dune Panne Majeure - GTPM
  • Control Room Representatives
  • PCR, TCR, MCR, (CRN)
  • Control specialists
  • ST/MO, SL/CO, SL/OP, ...
  • Equipment specialists
  • ST/EL, ST/CV, LHC/VAC,

4
Accelerator Oriented MonitoringSystems,
Interaction Data
Electricity HT, MT, BT,
Access Technical breakdowns
  • GTPM
  • Major breakdown (alarms, logbooks,)
  • System identification
  • System interdependency
  • Restart objectives
  • ...

Water Pumping Stations, Raw, Prim, Chilled,
Demi, ...
Monitoring Hardware, Software, network ...
Thermal Air-conditioning, Ventilation
SL timing, power supplies, magnets, ...
Vacuum Pumps, Pressures
CPS
5
Example SPS Restart Diagram
6
Example TCR Restart Diagram
7
Monitoring System
  • Dynamic restart diagrams
  • UMMIs in PVSS
  • Drivers for various data sources
  • TDS, electricity, vacuum, access, transfer lines,
    timing, power converters, ...
  • SAME tools in PCR,TCR, MCR,

8
PVSS Implementation
9
Added Value
  • All control rooms work with the same information
  • Breakdown impact at one glance-gt faster
    situation assessment
  • Optimised restart strategy (priorities, order)
  • Shorter restart time
  • Visual system documentation for training

10
Outlook / next steps
  • Use paper tools in operation this year
  • Assess improvement
  • Finish PVSS implementation
  • Formalise and document the method
  • MCR asked for same project shutdown2001/2002 and
    2002/203
  • Promote results and method for LHC operation